Korean Journal of Construction Engineering and Management
/
v.2
no.3
s.7
/
pp.75-82
/
2001
Traditional bidding process and activities in public construction area has many problems in terms of the clearness and fairness of administration. And, it causes many cost consumption to suppliers. As part of the efforts to solve these problems, some public institutions developed the electronic bidding systems. But these systems have still problems in diverse aspects. Therefore, the purpose of this study is to analyze current bidding systems through literature survey, case study and process mapping methodology, to compare the result of the analysis with the developed electronic bidding systems and to suggest the improvement for the coming bidding systems. As results of this study, key processes and classified contract types about public construction bidding were identified. These can be applied by means of guidelines when public institutions are planning new electronic bidding systems. The composition of unified driving organization, the database development for information share and the standardization of national level for the new electronic bidding systems were also suggested.
Korean Journal of Construction Engineering and Management
/
v.3
no.2
s.10
/
pp.114-120
/
2002
Traditional bidding process and activities in public construction area has many problems in terms of the transparency and fairness of administration. And, it causes many expenses to suppliers. As part of the efforts to solve these problems, some public institutions developed the electronic bidding systems. But these systems have still problems in diverse aspects. Therefore, the purpose of this study is to analyze current bidding systems through literature survey, Questionnaire, contentment estimation and IDEF method to compare the result of the analysis with the developed electronic bidding systems and to suggest the improvement for the coming bidding systems. According to the survey, under present bidding system big problem is inconvenience of conducting process. Nearly all users of current electronic bidding systems were contented. When public institutions are planning new electronic bidding systems, standardization, security, law and bidding system consolidation must be applied. This study proposes an improved bidding system and described the effects through the improvements.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.131-138
/
2002
Traditional bidding process and activities in public construction area has many problems in terms of the clearness and fairness of administration. And, it causes many cost consumption to suppliers. As part of the efforts to solve these problems, some public institutions developed the electronic bidding systems. But these systems have still problems in diverse aspects. Therefore, the purpose of this study is to analyze current bidding systems through literature survey and questionnaire, to compare the result of the analysis with the developed electronic bidding systems and to suggest the improvement for the coming bidding systems.
Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
Korean Journal of Construction Engineering and Management
/
v.11
no.2
/
pp.35-44
/
2010
Currently, the unit price of public construction projects are not being evaluated appropriately for several reasons. First, the evaluation of the unit price differ per nature of the bidding process and its estimation process. In fact, pricing is determined to meet the total price in turnkey projects and to pass the low bid price deliberation process in unit price projects, and thus, such prices cannot be said to be reasonable prices per public project. After the contract is awarded, however, the prices determined without taking into consideration the characteristic of each bidding process and price estimate process are used for the valuation of progress payment, design changes, and escalation. Furthermore, this is also being applied to other low bid deliberation process as actual public project unit price, thereby affecting other processes as well. In effect, this system increases the risks for both the owner and the bidder who have determined the unit price. This research examines the risk factor and its extent in order to properly manage it in preparation for the future.
Journal of the Korea Institute of Building Construction
/
v.17
no.6
/
pp.559-566
/
2017
The bidding method of public works is decided based on the experience of the officials in charge and the convenience of the work, but the validity of decision making process for the bidding method has not been verified. Another challenge in the bidding method selection is its objective validation is not easy because the decision making is based on experience, when a new type of project is ordered or a new bidding method is applied In this study, therefore, a decision making model to facilitate the selection of a public construction project delivery method was developed and examined with its applicability. This model was developed using the Analytic Hierarchy Process and was verified through 32 persons who were actually in charge of the works. As a result of applying this model, 5 of the 32 persons showed consistency in using the model. and they expressed positive opinions about the model. The model can provide a guide while recognizing the fact that they cannot depend entirely on the model. Therefore, the model proposed in this study is expected to reduce the work-related burden of the persons who are involved in the related work and help the objective performance of their tasks when a new bidding method or project appears in the future.
Kim Su-Hyun;Jeon Min-Jeong;Koo Kyo-Jin;Hyun Chang-Taek
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.410-413
/
2003
In order to build up competitive power in construction market and to cope with international policy, Design-Build bidding is one of the viable bidding system, encouraging collaboration between design office and building construction firm. Design-Build is a promising delivery system to help expediting schedules, saving costs, and improving Quality. However, the problems of Design-Build project in the domestic construction industry are not to be able to take advantages of fast-tracking and value engineering process, because of the problems of inappropriate system and participants' inexperience. The purpose of this study is to suggest alternatives for Design-Build bidding of public sector in the domestic construction industry in the costs, quality and time aspect.
Journal of the Korea Institute of Building Construction
/
v.10
no.6
/
pp.109-116
/
2010
A construction project consists of many types of contracts. In the process of selecting the successful contractor after bidding, there will inevitably be fierce competition, which may lead to corruption or bribery. Even after signing the contract, during the period of settling the amount of the contract, bribery could occur. Such corruption could harm the development of the construction industry. It is, therefore, necessary to establish a strategy to prevent corruption by strengthening the transparency of the bidding process. In this study, to prevent corruption in the construction industry, a new service is proposed in which the successful bidder is selected by a professional third party, and the introduction of diverse delivery systems for construction projects and the invigoration of alternative methods of settling disputes are also proposed in this study.
This study introduce a architectural design process by the changes of sustainable design guidelines in public project. First of all, this study examines existing integrated design process studies performed by Rhee & U.B.C. Also, this study examines sustainable guidelines which demanded by public building projects. Then, this study introduces sustainable design process using existing sustainable design process, and shows that how to operate and proceed integrated design to satisfy the sustainable guidelines in practice. The results of this study are as follows. (1) Since 2007, sustainable design guidelines of bidding projects have been highlighted. (2) In public buildings, energy saving is very important issue. Especially energy certification demands 1st degree(under $300kWh/m^2{\cdot}yr$). (3) Inp ractice, integrated design team performed sustainable design using the sustainable design process to improve sustainable in public buildings.
Korean Journal of Construction Engineering and Management
/
v.19
no.3
/
pp.52-60
/
2018
Korea's public construction projects are under construction through bidding, however, due to the nature of the bidding, collusion between participants can occur. The collusion of bids accordingly damages the client. So, it is necessary to calculate the appropriate fictitious competition price to compensate for this. In this regard, econometrics methods are generally used, but there are limitations and issues arising from the nature of construction, especially design-build bid. Therefore, this study proposes a method to estimate reasonable competitive bid-price in design-build bid. It derives the lowest bid-price from the design submitted by the proponent and estimates the competitive bid-price by examining the factors according to the penetration rate according to the technical level of the tester, the skill level of the competitor, and the type of tester. Based on the method proposed in this study, a reasonable price can be derived that reflects the characteristics of the design and construction bidding bidder selection method and also it can be used as a reference material in the actual bidding process as well as calculating the damage due to the answer.
Korean Journal of Construction Engineering and Management
/
v.21
no.2
/
pp.30-38
/
2020
Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.