In DC power distribution system for urban rail transits potential relay, 64P, is used to detect the ground faults. The problem with this 64P is that though it detects the ground fault it cannot identify the faulted region. Therefore the faulted region cannot be isolated properly. It could results in power loss of the trains on the healthy regions and the safety of the passengers in the trains could be affected adversely. A new ground fault protective relaying scheme that can identify the faulted region is presented in this paper. The new concept uses the current differential scheme and the permissive scheme to identify the faulted region correctly. A device with similar characteristic to the arrestor is adapted to use the current relay for the ground fault detection. The role of the device is to block the ground leakage current in normal operating condition and enable the ground fault current to flow in ground fault condition. The algorithm of the new relay and the effect of the newly adapted device in the new relaying scheme are discussed.
Kim, J.W.;Jang, S.I.;Kim, K.H.;Yoo, N.S.;Park, H.J.;Song, D.S.;Lee, J.M.
Proceedings of the KIEE Conference
/
2003.07a
/
pp.342-344
/
2003
This paper describes the correction of overcurrent protective relaying set value in distribution networks interconnected with wind farm by dedicated line. The wind farm composed of wind turbine generators is one of the great energy sources; however, it would be also highly possible that the current in the point of common coupling is influenced by the output power of wind farm. So, the overcurrent relay applied in distribution feeders might generate trip signal for normal operation. In order to prevent the mal-operation of overcurrent relay, it is necessary to correct the relay's setting value according to the output power of end farm. This paper presents the influence of wind farm on the overcurrent relaying set value in distribution feeders for cases of fault as well as normal operation and proposes the basic strategy for correction of overcurrent relaying set value.
This paper introduces the development of automatic system for estimation of digital relay performance. We have developed an automatic estimation system "HRV2004(Himap Relay function Verifier 2004)" for digital relay in 2004 and it has been verified in the field for one years. This paper describes the development details and field experience of HRV2004. HRV2004 can perform a series of jobs required for the relay testing in one environment and could handle most of all models of protective relay currently produced by Hyundai Heavy Industries. The functionality of this program consists of GUI of relay setting for beginner, fault record analysis and relay performance estimation. The core of this system is an automatic reporting of estimation test. If user is only click a button for relay estimation and one will received testing report to deliver customer. Additional benefit is fast response than the manual estimation. For example, the manual estimation takes spending 6 hours but this system is about 15 minutes.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.52
no.1
/
pp.17-28
/
2003
Digital technology has advanced very significantly over the years both in terms of software tools and hardware available. It is now applied extensively in many area of electrical engineering including protective relaying in power systems. Digital relays based on digital technology have many advantages over the traditional analog relays. The digital relay is able to do what is difficult or impossible in the analog relays. However, the complex algorithms associated with the digital relays are difficult to test and verify in real time on real power systems. Although non real-time simulators like PSCAD/EMTDC are employed to test the algorithms, such simulations have the disadvantage that they cannot test the relay dynamically. Hence, real-time simulators like RTDS are used, but the latter needs large space and it is very expensive. This paper uses EMTP MODELS to simulate the power system and the distance relay. The distance relay algorithm is constructed and the distance relay is interfaced with a test power system. The distance relays performance is then assessed interactively under various fault types, fault distances and fault inception angles. The test results show that we can simulate the distance relay effectively and we can examine the operation of the distance relay very closely including debugging by using EMTP MODELS.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.9
/
pp.1521-1526
/
2007
This paper presents the application of Adaptive Evolutionary Algorithm (AEA) to search an optimal setting of overcurrent relay coordination to protect ring distribution systems. The AEA takes the merits of both a genetic algorithm (GA) and an evolution strategy (ES) in an adaptive manner to use the global search capability of GA and the local search capability of ES. The overcurrent relay settings and coordination requirements are formulated into a set of constraint equations and an objective function is developed to manage the overcurrent relay settings by the Time Coordination Method. The domain of overcurrent relays coordination for the ring-fed distribution systems is a non-linear system with a lot of local optimum points and a highly constrained optimization problem. Thus conventional methods fail in searching for the global optimum. AEA is employed to search for the optimum relay settings with maximum satisfaction of coordination constraints. The simulation results show that the proposed method can optimize the overcurrent relay settings, reduce relay mis-coordinated operations, and find better optimal overcurrent relay settings than the present available methods.
In this paper present Autonomous Adaptive Digital Over Current Relay which acts autonomous setting using voltage and current measured by relay in the change of power systems. Automation of relay setting is required for distribution automation although manual relay setting is used at present. This paper presents Autonomous Relay Setting which knows change of the power system and acquires setting element using the Recursive Least Squares. Relay setting is very difficult work. But proposed relay is expected to decrease burden of relay setting using acquired information of power system change and autonomous setting. Also fast protective ability is expected according to change of power system.
Protection and control systems play a prominent part in avoiding power delivery interruptions and help to get a fast and secure restoration when a failure occurs. In order to meet the higher functional requirements on modern power system, protection speed, selectivity, sensitivity, dependability, and security are essential to ensure reliability. These functions on be satisfied by taking advantage of microprocessor and communication technologies, and digital protection relays (systems) have been developed and applied to real power system enhancing reliability and saving money. It is necessary to have a tool to analyze the functions and algorithms of digital relays for installing them to power system. The purpose of this study is to develop a digital relay simulation program to estimate digital relay performances during system faults. Components of digital protective relay including analog filter, sampling unit, digital filter, and relay logic are modeled in this program.
Journal of the Korean Society of Industry Convergence
/
v.4
no.3
/
pp.263-266
/
2001
In this paper, intelligent methods using digital protection relay in power SCADA system is developed in order to protect power systems by means of timely fault detection during operation and control at starting for induction motor which have various load environments and capacities in power systems. The digital protective relay was designed with DSP CPU(TMS320C31) to protect and measure more quickly and precisely. The test result on the basis of KEMC 1120 and IEC60255, show that the operation time error of the digital motor protection relay is improved within ${\pm}5%$. Also, we can control motors at starting according to starting types with simple method as programmable sequence editor. So we can improve the demerits of high cost and much manhour for rework.
In recent years, with the continuous development of modem power system, the need for high performance protection to meet the customers' requests for more stable and reliable power supply has become increasingly emphasized. So, there is urgent need for a proper testing platform about not only existing digital protection relay but also new digital protection relay on the transmission line. It is also dynamic-state test which can test the performance of digital relay. This paper suggests basic system model for testing transmission line protection using PSCAD/EMTDC, and presents the process of the component modeling in the basic system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.