• Title/Summary/Keyword: Project risk

Search Result 1,192, Processing Time 0.032 seconds

A Risk Management Framework for New Product Development: A Case Study

  • Kasemset, Chompoonoot;Wannagoat, Jaruwan;Wattanutchariya, Wassanai;Tippayawong, Korrakot Y.
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.2
    • /
    • pp.203-209
    • /
    • 2014
  • This research designed and implemented a supply chain risk management platform and applied it to a case study of reduced-fat Lanna pork sausage as a new product development project. The proposed framework has three stages: risk identification, risk assessment, and risk mitigation. Seventeen risk agents with 17 risk events were identified based on SWOT analysis and the Porter Five Forces concept through the process of planning, sourcing, making and delivering, partially captured from the supply chain operations reference model in the first stage. In the second stage, an house of risk (HOR) framework was applied to present the impacts of each risk agent. In the third stage, eight risk agents with high impact were selected to design 21 preventive actions. Finally, three preventive actions with the highest effectiveness to difficulty ratio scores-'sales evaluation of familiar products', 'increasing distribution channels and promotions to improve sales', and 'work flow improvement for work safety'-were then recommended for this new product development.

Construction Management Evaluation Model using Risk Index Modeling in Construction Phase (위험도 모델링을 이용한 시공단계의 감리업무 평가모델)

  • Ryu Jin-Young;Mo Yong-Woon;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.89-100
    • /
    • 2000
  • The purpose of this study is to maximize project efficiencies in construction management by analyzing hierarchical factors that effect in project supervision system, and consequently constructing managerial CSF(Critical Success Factors). For this study, the tools for evaluating operating and management abilities of site engineers are built from analyzing status and issues, deducing influence factors and rating cardinal scales of these factors from survey results. These evaluation tools are reflected to the construction supervision decision making process so that can improve project management effectiveness.

  • PDF

Identification and risk management related to construction projects

  • Boughaba, Amina;Bouabaz, Mohamed
    • Advances in Computational Design
    • /
    • v.5 no.4
    • /
    • pp.445-465
    • /
    • 2020
  • This paper presents a study conducted with the aim of developing a model of tendering based on a technique of artificial intelligence by managing and controlling the factors of success or failure of construction projects through the evaluation of the process of invitation to tender. Aiming to solve this problem, analysis of the current environment based on SWOT (Strengths, Weaknesses, Opportunities, and Threats) is first carried out. Analysis was evaluated through a case study of the construction projects in Algeria, to bring about the internal and external factors which affect the process of invitation to tender related to the construction projects. This paper aims to develop a mean to identify threats-opportunities and strength-weaknesses related to the environment of various national construction projects, leading to the decision on whether to continue the project or not. Following a SWOT analysis, novel artificial intelligence models in forecasting the project status are proposed. The basic principal consists in interconnecting the different factors to model this phenomenon. An artificial neural network model is first proposed, followed by a model based on fuzzy logic. A third model resulting from the combination of the two previous ones is developed as a hybrid model. A simulation study is carried out to assess performance of the three models showing that the hybrid model is better suited in forecasting the construction project status than RNN (recurrent neural network) and FL (fuzzy logic) models.

A Study on the Data Classification in Engineering Stage of Pipeline Project in Extreme Cold Weather (극한지 파이프라인 프로젝트 설계단계에서의 데이터 분류에 관한 연구)

  • Kim, Chang-Han;Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.214-215
    • /
    • 2014
  • Recently, Russia decided to export an annual 7.5 million tons of natural gas to Korea over 30 years from 2015, as also deal with China, planed to build a pipeline connecting Siberia to Shandong Peninsula about 4000km. Risk management is required depending on the project in extreme cold weather, because it is concerned about the behavior of the seasonal changes in soil temperature and the strain of pipe according to the long-distance pipeline construction. The plan of data management shall be prepared in parallel for a sophisticated risk management, because a data is massive scale and it is generated/accumulated in real time. Therefore, this research is aimed to classify a data items in engineering stage of pipeline by previous studies for managing a generated data depending on the detail works in extreme cold weather. We expect to be provided the foundation of an efficient classification system of a generated data from the pipeline project life cycle.

  • PDF

A MULTI-OBJECTIVE OPTIMIZATION FOR CAPITAL STRUCTURE IN PRIVATELY-FINANCED INFRASTRUCTURE PROJECTS

  • S.M. Yun;S.H. Han;H. Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.509-519
    • /
    • 2007
  • Private financing is playing an increasing role in public infrastructure construction projects worldwide. However, private investors/operators are exposed to the financial risk of low profitability due to the inaccurate estimation of facility demand, operation income, maintenance costs, etc. From the operator's perspective, a sound and thorough financial feasibility study is required to establish the appropriate capital structure of a project. Operators tend to reduce the equity amount to minimize the level of risk exposure, while creditors persist to raise it, in an attempt to secure a sufficient level of financial involvement from the operators. Therefore, it is important for creditors and operators to reach an agreement for a balanced capital structure that synthetically considers both profitability and repayment capacity. This paper presents an optimal capital structure model for successful private infrastructure investment. This model finds the optimized point where the profitability is balanced with the repayment capacity, with the use of the concept of utility function and multi-objective GA (Generic Algorithm)-based optimization. A case study is presented to show the validity of the model and its verification. The research conclusions provide a proper capital structure for privately-financed infrastructure projects through a proposed multi-objective model.

  • PDF

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

A Study on the Estimation of the Contingency by the Regression Analysis on the Apartment (회귀분석을 통한 공동주택 공사예비비 산정에 관한 연구)

  • Lee Man-Hee;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.226-229
    • /
    • 2003
  • Construction manager must consider the possibility on the failure of the project in advance and the contingency to provide against the situation, those of which is a dangerous condition not to predict. If they have a quick decision without understanding the contingency, the over-cost in the total cost would be continuously accumulated, and be a barrier at a project going in progress. A various risk could not be coped with at a time to decide either going or sloping the project until the contingency is applied from the first step to progress the project. But a case to apply the contingency to the construction for the investment or the analysis of the project is a little. The process to evaluate it is also absent. The propose of this paper is the followed ; To establish the total cost including the risk first of all, devide into plus or minus factor of the cost, and then the process to calculate the contingency must be suggested by the regression analysis.

  • PDF

The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis (댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구)

  • Yoon, Jae-Ho;Moon, Young-Il
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.715-724
    • /
    • 2003
  • It is true that SOC facilities, such as dams, need long life cycles since more time has to be invested for the phases of planning, examination, feasibility study, design, contract, construction, and maintenance. This longer life cycle is easily exposed to the risk. And thus, brings additional cost by the delayed project, convenient loss according to the additional run of use, and benefit lose of not to using the facilities. So, the purpose of this study is to try to find a solution to reduce these time consuming problems which could diminish the whole national competition. Hence, this study is to show efficient, systematical project performance and network model by using reciprocal analyses between the construction period and cost based on economical analysis of each phase of life cycles. In addition, on the basis of these outputs, the Fast Track Method is suggested as an alternative solution as a new Approach in Life Cycle's Analysis.

A Study on Development for Construction Management System of Private Infrastructure Project (SOC민간투자사업의 CM 운영체계 개발에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Dae-Young;Cho Hun-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.404-407
    • /
    • 2004
  • This Research suggested direction of development and analyzed necessity and given condition of CM(Construction Management) operation system of SOC private infrastructure project which is judged to grow up continuously from now on, Direction of development which is suggested in this research is largely there, (1)development of SOC private infrastructure project CM work standard process guide, (2)development of SOC Private Investment project feasibility study Performance standard, (3)checklist of SOC by stages and functionally private investment projects risk. Through this development, later we judge effect not only supply of a model case to artivate CM system but heightening of efficiency in domestic construction industry.

  • PDF

A Study on Problems and Improvement in Operation of the BTL Projects. (임대형 민자 사업(BTL)에서 운영부문의 문제점 분석과 해결 방안 연구)

  • Noh, Jung-Ho;Lee, Jae-Young;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.686-691
    • /
    • 2006
  • Beginning January 2005, the BTL (Build-Transfer-Lease) project was initiated by government to provide high level of public services for the upgraded quality of life. The most important process of the BTL project is operation, because the company have to operate the building about $20{\sim}30$ years after completion. But a lot of problems have been founded so far. For example, no counterplan for the risk in operation, no total control system and the vagueness in project guideline and so on. These problems will cause serious demage to the BTL project. Hence, this paper analyzes the above issues and conducts the interviews with the professionals from the diverse sectors in order to propose the improvement and deliver the successful operation in BTL project.

  • PDF