RISK ANALYSIS FOR INDUSTRIAL PROJECT IN CONSTRUCTION PHASE: A MONTE-CARLO SIMULATION APPROACH

  • Soo-Yong Kim;Luu Truong Van;Han-Ki Ha;Nguyen Quoc Tuan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.130-139
    • /
    • 2007
  • This paper presents a study on risk analysis in terms of contractor's costs in construction phase in which Crystal ball (software of Decisioneering, UK) has been utilized as a main tool. To realize it, a questionnaire survey has been carried out to identify the dominant factors that strongly influence contractor costs in Vietnam. Based on results of questionnaire investigation, the survey identified three factors which were duration of each construction task, costs of reinforcing steel, and cement. Then a spreadsheet model was created in order to analyze risks. The study also indicates that the cost of reinforcing steel and cement are the cause of risks for contractors. According to the suggested model, contractors may foresee the probability of completion within the approved budget, and the possibility of earning in accordance with owner's payment conditions.

  • PDF

Assessment and Management System for Various Risks in Plant Projects (플랜트 프로젝트 리스크의 평가 및 관리시스템에 관한 연구)

  • An, Seung Kyoo;Cho, Dong-Hwan;Hur, Jin-Huek;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.6 no.1
    • /
    • pp.56-63
    • /
    • 2010
  • While the local plant market is reducing its volume, the plant market over the world since 2000s is rapidly expanding. The nation's construction companies, aggressively dedicated in launching out overseas plant market, increase the volume of orders in that sector, but there also are much difficulty in the project management as those projects ordered are gradually large scaled with more cutting-edge high-tech requirements along with comparatively higher risk. Though the local construction companies have developed their own types of measures to analyze the risk evaluation putting into practice, the specialized decision-making model for the overseas plant market or the risk measure understandable easily and applicable practically is not yet shown. This paper aims at providing the methodology to evaluate the risk by way of constructing the risk evaluation process in order to induce risk measuring elements through appropriate indexing system. Furthermore, through studying the risk management system, it aims to seek for a thorough risk management method from beginning of the project to the end.

  • PDF

Analysis and Quantitative Estimation of Risk Factors of Design-Build (턴키 프로젝트에서 리스크요인 분석 및 정량적 평가)

  • Oh, Guk-Yeol;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.12-24
    • /
    • 2012
  • The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.

Development of Evaluation Model for ITS Project using the Probabilistic Risk Analysis (확률적 위험도분석을 이용한 ITS사업의 경제성평가모형)

  • Lee, Yong-Taeck;Nam, Doo-Hee;Lim, Kang-Won
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.3 s.81
    • /
    • pp.95-108
    • /
    • 2005
  • The purpose of this study is to develop the ITS evaluation model using the Probabilistic Risk Analysis (PRA) methodology and to demonstrate the goodness-of-fit of the large ITS projects through the comparative analysis between DEA and PRA model. The results of this study are summarized below. First, the evaluation mode] using PRA with Monte-Carlo Simulation(MCS) and Latin-Hypercube Sampling(LHS) is developed and applied to one of ITS projects initiated by local government. The risk factors are categorized with cost, benefit and social-economic factors. Then, PDF(Probability Density Function) parameters of these factors are estimated. The log-normal distribution, beta distribution and triangular distribution are well fitted with the market and delivered price. The triangular and uniform distributions are valid in benefit data from the simulation analysis based on the several deployment scenarios. Second, the decision making rules for the risk analysis of projects for cost and economic feasibility study are suggested. The developed PRA model is applied for the Daejeon metropolitan ITS model deployment project to validate the model. The results of cost analysis shows that Deterministic Project Cost(DPC), Deterministic Total Project Cost(DTPC) is the biased percentile values of CDF produced by PRA model and this project need Contingency Budget(CB) because these values are turned out to be less than Target Value(TV;85% value), Also, this project has high risk of DTPC and DPC because the coefficient of variation(C.V) of DTPC and DPC are 4 and 15 which are less than that of DTPC(19-28) and DPC(22-107) in construction and transportation projects. The results of economic analysis shows that total system and subsystem of this project is in type II, which means the project is economically feasible with high risk. Third, the goodness-of-fit of PRA model is verified by comparing the differences of the results between PRA and DEA model. The difference of evaluation indices is up to 68% in maximum. Because of this, the deployment priority of ITS subsystems are changed in each mode1. In results. ITS evaluation model using PRA considering the project risk with the probability distribution is superior to DEA. It makes proper decision making and the risk factors estimated by PRA model can be controlled by risk management program suggested in this paper. Further research not only to build the database of deployment data but also to develop the methodologies estimating the ITS effects with PRA model is needed to broaden the usage of PRA model for the evaluation of ITS projects.

Application of Risk Analysis for Economic Evaluation of Railroad Investments (위험도 분석을 이용한 철도투자사업 경제성평가 적용방안)

  • Lee, Ho;Suh, Sun-Duck
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.44-51
    • /
    • 2001
  • To account for uncertainties involved in an economic analysis of project, sensitivity analysis are usually being done in Korea. Though useful for policy analysis, but it larks explicit consideration of probability of occurring certain events considered in the sensitivity analysis. Risk analysis otherwise can explicitly account for the probability of certain event which has dire impact on project viability, such as cost, discount rate, and size of benefit. This paper reports experience of applying risk analysis method for economic evaluation of railroad investment. Probability distribution of event has paramount impact on the risk analysis results, while not many prior researches dealt with these issues. Probability distribution of rolling stock cost and operating cost, in addition to those cost variables, are developed considering railway demand in this study. Case study results are reported. Issues in applying risk analysis are reported in addition to further research direction.

  • PDF

Quantitively deducing basic method of construction schedule risk (공정리스크의 정량적 도출을 위한 기초적 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

A Stochastic Network Simulation Model for Project Risk Analysis (확률적 네트워크 Simulation 방법을 이용한 프로젝트의 위험분석모델)

  • 황흥석
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2000.11a
    • /
    • pp.16-21
    • /
    • 2000
  • 본 연구는 대형 프로젝트의 위험분석을 위한 확률적 Network 시뮬레이션모델의 연구로서 Simulation방법으로 프로젝트의 성공 및 실패확률을 산정 하였다. 프로젝트의 주요 불확실성 요소(Uncertainty Factors)인 프로젝트의 수행기간(Time), 비용(Cost) 및 성과(Performance) 등의 계획은 실패 없이 추진되어야 하는 것이 중요하다. 연구 개발 및 신기술개발과 같이 대형 프로젝트의 경우, 그 성과 달성의 위험(Risk)성은 매우 크며 이러한 위험 예측 및 분석이 프로젝트의 성공적인 수행을 위하여 매우 중요 시 된다. 본 연구에서는 이를 위한 위험분석(Risk Analysis)의 방법으로 일반적으로 쉽게 사용할 수 있는 위험요인법(Risk Factor Analysis)과 확률적 Network 시뮬레이션모델을 제시하였으며 또한 이를 위한 Simulation프로그램을 개발하였으며 이를 신 기술개발 프로젝트에 응용하는 과정을 보였다. 본 연구에서 개발된 관련 프로그램을 보완 할 경우 대형 프로젝트의 각종 의사결정 시에 매우 유용하게 활용될 수 있으리라 생각된다.

  • PDF

MODELLING OF THE RISKS FACED BY INDIAN CONSTRUCTION COMPANIES ASSESSING INTERNATIONAL OPPORTUNITIES

  • M.N. Devaya;N.K. Jha
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.140-149
    • /
    • 2007
  • Indian construction companies have only 0.05% market share in the 3-4 trillion dollar global construction business and only two Indian construction companies figure in the ENR "Top 225 Global Contractors 2006" list. Hence, while enormous scope for growth exists, international construction experience is limited. This study explores the risks as perceived by Indian companies venturing abroad since risks in international construction differ from home market risks. Literature survey identified a number of risk factors that were evaluated by the experts, highlighting fourteen important risk factors. Interpretive Structural Modelling (ISM) was used to develop a hierarchical model showing the relationships between the different risk factors, thus helping to focus on the key risks for effective risk management. The study shows that poor project management is a key risk forming the hub of the system, while political instability has maximum influence. The results of the study can be used by managers to visualise the risks in perspective and prioritise the mitigation effort.

  • PDF

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

The Time Management Model focused on the Risk Management (위험관리 중심의 공정관리모텔)

  • Chu, Hae-Keum;Shin, Hyeng-John;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.81-89
    • /
    • 2005
  • Construction projects are characterized that exposed high risks so feel strongly necessity of actively risk management that manage the time of project. but recent generally time management tools are not satisfied sufficient supporting the risk identify and risk analysis. Therefore this study purposed development the time management model that in order to improve existing problem of time management model in construction project and developed model could perform practical risk management in construction field. The new time management model focused on the risk management will be able to conduct critical path management and risk critical path management simultaneously.