• Title/Summary/Keyword: Project priority

Search Result 408, Processing Time 0.027 seconds

Bounded Rationality under Analysis of Relative Priorities on Multi-cultural Policy (제한된 합리성 하에서 다문화 정책에 대한 상대적 우선순위 분석)

  • Jung, Seok-Hwan
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.11
    • /
    • pp.317-326
    • /
    • 2018
  • The purpose of this study is to develop an AHP model to evaluate the relative importance and priorities of multi-cultural policies under bounded Rationality. The results of the study are as follows. First, in the evaluation elements for each measurement area, the following are the stable social settlement support policy (1rank), social capability development policy of multi-cultural family second generation (2rank), socio-economic activity policy (3rank), collaborative governance policy enforcement(4rank). Second, the priority of the measurement element is as follows. social settlement service target expansion policy was proved to be the top priority project stable social settlement support policy aspect and social capacity development policies of the second generation of multi-cultural families, social support policy was most important evaluated. Active economic activity support policy was as the top priority project socio-economic activity policy, and construct cooperation system of policy practice main agents was proved to be the top priority collaborative governance policy enforcement. These results will contribute to explain the reality of multi-cultural policy.

Influence Factors of Aerial Environment on Project Schedule Management

  • Hong, Jun-pyo;Lim, Hyoung-chul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.608-611
    • /
    • 2015
  • The objectives of this research are 1) control of schedule or improvement of management for aerial environment, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall-based apartment buildings and in column-based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

  • PDF

Empirical Study of the PLSP (Priority Land and Signal Preemption for Emergency Vehicles (긴급차량의 우선차로 및 우선신호 도입효과 -청주시를 대상으로-)

  • Lee, Jun;Ham, Seung Hee;Lee, Sang Jo
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.4
    • /
    • pp.650-657
    • /
    • 2020
  • Purpose: In this study, the effectiveness of pilot project of PLSP (Priority Lane and Signal Preference) system, which was operated in Cheongju City, was analyzed. Method: The priority signal was operated by a police officer switching to a blue signal when approaching a fire truck through CCTV, and the priority lane of emergency vehicles was displayed on the road to enable preferential traffic. VISSIM simulation analysis was performed for the 1.2km section (3.8km) of the pilot project section and vehicle data was analyzed for some of the test operation sections. Result: Simulation analysis shows that the moving speed of the emergency vehicle can be increased by 42 km/h with the introduction of PLSP, which can be increased by approximately twice the speed. Travel time was reduced by about 3 minutes, and considerable improvements of 69% compared to cities that are not operating was analyzed. The pilot operation of Cheongju City showed a time-shortening effect of about two minutes on average, with the average time reaching 4 minutes and 14 seconds in the first period and the average time reaching 5 minutes and 40 seconds in the second period. Conclusion: The system has been shown to be effective in minimizing time-to-site arrival of emergency vehicles.

A Comparitive Study of MAUT and AHP in Priority Setting of R&B Projects (연구개발사업 우선순위 설정에 있어서 다속성효용이론(MAUT)과 계층분석과정(AHP)의 비교)

  • 박주형;김정흠
    • Journal of Korea Technology Innovation Society
    • /
    • v.2 no.2
    • /
    • pp.201-218
    • /
    • 1999
  • The article contains an introduction of possibility of applying Multi-Attribute Utility Theory(MAUT) for priority setting of R&D projects. MAUT is compared with AHP, which is widely used recently. These two techuiques are applied to set priorities of R&D projects In a Government-funded Research Institute. Six criteria are chosen from consultation with decision makers. They are composed of 1) validity as representative projects, 2) possibility of resource mobilization, 3) spillover effect of developed technologies, 4) possibility of success, 5) scope of participation and 6) clarity of research goal. To set priorities of R&D projects, SMART(Simple MultiAttribute Rating Technique) and DVM(Difference Value Measurement) out of many MAUT methods are used to design the utility function and to determine the weights among criteria. The aggregation model is additive on the assumption the criteria are independent. AHP executes pairwise comparisons for criteria and alternatives. From the results of the case study, the results and theoretical characteristics are compared.

  • PDF

Finding Subjects for Automated Container Terminal Development by Systems Approach (시스템적 접근에 의한 자동화컨테이너터미널 개발 과제 도출)

  • 박창호;노홍승;정희균
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1998.10a
    • /
    • pp.51-58
    • /
    • 1998
  • This study is to define the Automated Container Terminal(ACT) and container terminal system. Also, we analyze the present condition of the container terminal system in Pusan port and its automation level by systems approach. And this paper aims at evaluating on the priority of R&D investment until the beginning of the second stage of New Pusan Port Project(2006). In this process we have considered 8 factors (cost, labor, area, time volume, reliability, safety, convenience) to analyze 6 subsystems. The priority order of R&D until target year by sub-systems is as follow : Cargo Handling System〉Transfer System〉Port Entry System〉Storage System(Distribution&Manufacturing System included)〉Inland Transport System〉Port Information System.

  • PDF

Development of a Methodology for Setting Priority of Technology Alternatives (기술대체안의 우선순위 설정을 위한 개량 AHP모형의 개발)

  • Gwon, Cheol-Shin;Cho, Keun-Tae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.122-125
    • /
    • 2000
  • The Analytic Hierarchy Process (AHP), a decision making model, which is more applicable than other methods to R&D project selection, particularly when it is applied to intangibles. The objective of this paper is to develop an extended model of the AHP which Is linked to Cross Impact Analysis to assist in the ranking of a large number of technological alternatives. In this study, we developed a priority setting algorithm which considers the cross-impact of the future technology alternatives and thus developed an integrated cross-impact hierarchical decision-making model, which sets the priority by considering technological forecasting and technology dependency

  • PDF

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTT사업비 타당성 평가모형 정립에 관한 연구)

  • Jung, Young-Han
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.155-160
    • /
    • 2008
  • The BTL project, 4 years since its operation. has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the priority to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following : LCC analysis and disbursement for government including two more detailed factors.

Dynamic Decisions using Variable Neighborhood Search for Stochastic Resource-Constrained Project Scheduling Problem (확률적 자원제약 스케줄링 문제 해결을 위한 가변 이웃탐색 기반 동적 의사결정)

  • Yim, Dong Soon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.43 no.1
    • /
    • pp.1-11
    • /
    • 2017
  • Stochastic resource-constrained project scheduling problem is an extension of resource-constrained project scheduling problem such that activity duration has stochastic nature. In real situation where activity duration is not known until the activity is finished, open-loop based static policies such as activity-based policy and priority-based policy will not well cope with duration variability. Then, a dynamic policy based on closed-loop decision making will be regarded as an alternative toward achievement of minimal makespan. In this study, a dynamic policy designed to select activities to start at each decision time point is illustrated. The performance of static and dynamic policies based on variable neighborhood search is evaluated under the discrete-event simulation environment. Experiments with J120 sets in PSPLIB and several probability distributions of activity duration show that the dynamic policy is superior to static policies. Even when the variability is high, the dynamic policy provides stable and good solutions.

The Effects of Scope Management on Process Performance and Output Performance in the Information System Development Project : An Analysis from Project Supplier's Perspective (공급자 관점에서 정보시스템 개발 프로젝트의 범위관리활동이 프로세스성과와 결과물성과에 미치는 영향에 대한 연구)

  • Park, Bong-Gu;Lim, Gyoo-Gun;Yoo, Weon-Sang
    • Journal of Information Technology Services
    • /
    • v.8 no.3
    • /
    • pp.83-100
    • /
    • 2009
  • Even though the success of the information system (IS) protect becomes a critical issue to an enterprise and there has been a lot of research about finding critical success factors of IS projects, the scope management for the success of IS protect has received little attention in the literature. The purpose of this research is to investigate the effects of the project scope management activities defined by PMI (Project Management Institute) on the performance of the information system project. The focus of this paper is on the project supplier's point of view. This study shows the priority of the scope management activities during the IS Project. The results show the different results depending on the types of the project clients and the project scale. This research reveals that the scope verification is important for the project supplier from the project process view, and that the scope planning/definition is important for the protect client from the project result view. It also shows different results comparing to the conventional recognition about project success. The research results show that the positive relationships between the project scale and the importance of scope management activities, and between the familiarity of suppliers and clients and the importance of the scope management activities. Through this research, we expect that the importance of the scope management in a project will be considered as an important issue, and that this research will lead to various detailed research about this issue.

Decision Support Model for Selection Water Resources Facility Improvement Projects (수리시설개보수사업 선정을 위한 의사결정지원모델)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.449-459
    • /
    • 2021
  • More than 80 % of agricultural reservoirs are old facilities over 50 years old, and safety and function declines occur. As a result, safety accidents such as the collapse of the reservoir have occurred. Precise safety diagnosis is conducted in advance to prevent accidents such as reservoir collapse, and Water resources facility improvement project are implemented based on priority. However, the priority of the business is selected based on the subjective judgment of the facility manager. In this study, we set 80 hypotheses based on the results of precision safety diagnosis and decision-making examples of existing Water resources facility improvement project and selected 45 variables using correlation analysis and significance test. Using logistic regression analysis, the final 21 variables were selected and a decision support model was presented, and the classification accuracy of the model was 86.8 %. In this research, the part that presented the quantitative index for decision support when selecting the Water resources facility improvement project has important significance.