A Study on the Efficiency of Safety Manager in Construction Project Stage (건설공사 사업 단계별 안전관리자 수행업무 효율화에 관한 연구)

  • Kang, Sang-Hun;Park, Hyun-Jung;Kim, Dae-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.212-213
    • /
    • 2022
  • Recently, the construction industry is increasingly in need of securing safety rights due to repeated serious accident. Accordingly, the government enacted the "Serious accident Punishment Act" to strengthen punishment for serious accident and expand the scope of punishment. However, safety managers in the construction industry are still vulnerable to safety accidents due to the heavy workload. The purpose of this study is to increase the efficiency of performance tasks and reduce serious accidents in the construction industry through analysis of performance tasks by stages of construction projects. The tasks derived through domestic research and domestic and foreign system analysis were classified step by step to analyze the correlation between difficulty and preventive effect, and inefficient tasks were discovered and improved. This can be used as basic data for identifying safety management tasks and preparing effective safety prevention measures, and it is expected to be a preventive measure against industrial accidents in the construction industry by using it for efficient work reorganization by safety managers.

  • PDF

The Study on the Project Delivery System for Vitalizing the Green Remodeling (그린리모델링 사업 활성화를 위한 발주방식 제안)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.3-11
    • /
    • 2017
  • Aging buildings over 15 years reaches about 74% of 177 thousand buildings in Domestic public buildings. Due to the aging building, the energy loss is a serious problem. In order to reduce the energy usage through improving the energy efficiency on the existing buildings, the government & the local autonomous entity conduct the energy efficiency projects through the remodeling, repairing & equipment replacement on the existing buildings. The green remodeling is applied to the existing public buildings in recently revised the act on the creation and support of green building. However, the standard is not obvious that the work scope of green remodeling, financing and project delivery method. This paper propose is to suggest project delivery system for vitalizing the green remodeling. Green remodeling is defined on basis of the occurring work under project life cycle based on the existing building process and the financing method for owners and companies and the project delivery system according to work scope of green remodeling are proposed in this paper

A Study on the Effective Economic Appraisal of Port Remodeling Project (항만투자평가 개선방안에 관한 연구 - 항만 리모델링사업을 중심으로 -)

  • Lee, Jin-Woo
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.2
    • /
    • pp.58-81
    • /
    • 2010
  • The economic appraisal of a port remodeling project must be transparent and persuasive to the public over the entire stage of the project. A project evaluator need to be familiar with the guidelines on evaluation, and to do his best to follow the guidelines to evaluate the given project. To make the right decision on investment, the evaluator must take into consideration not only economic efficiency, but also equity issues such as income redistribution and balanced development between regions. Port remodeling projects tend to produce externalities to the environment. However, these externalities are of qualitative nature, and hard to measure in monetary terms, so these are liable to be ignored in the process of project evaluation. Two different approaches - RP(revealed preference) and SP(stated preference) have been tried to assess the value of these non-market goods. Government authorities need to set minimum guidelines which project evaluators must follow in order to make the evaluation more reliable.

A Study on the National GIS (NGIS I) Project in Korea

  • Oh, Jong-Woo
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.449-453
    • /
    • 2004
  • GIS can be used on almost entire fields of the world, such as the national land management, environmental management, disaster management, enterprise activities, and general lives. GIS is called as an infrastructure of the knowledge information on the cultural society. For insuring the national power on the periods of the unlimited competition, it is very important to establish the national information infrastructure. Purpose of the NGIS project I is to development on living benefits of peoplethrough an efficiency of policy and rationalism of planning. In order to achievement of this purpose, the NGIS project I has been established using the national geographic information base planning. The NGIS project I consists of the master management part, the geographic information part, the technique development part, the standardization part, and the land Information part. These five GIS project parts are operated by four governmental ministers and related institutions, such as minister of transportation and construction, minister of science and technology, minister of information and communication, minister of administrative and home affaires. The NGIS I project is to establishment of the nation spatial information systems, such as various nationwide digital maps, GIS technique development, GIS education, GIS standardization, and GIS researches.

  • PDF

Project Performance Comparison Based on Different Types of Project Delivery System (사례연구 분석을 통한 발주방식별 성과비교)

  • Lee, Soo-Kyong;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

Integrated Planning Process Implementation Method Based on the Cost, Schedule, and Technical Performance (비용, 일정 및 기술적 성과를 고려한 통합 계획수립 프로세스 구현 방안)

  • You, Yi-Ju;Park, Young-Won
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.100-108
    • /
    • 2007
  • The purpose of the research is to propose an integrated project planning process and its implementation method. Although there is increasing interest in the application of the Earned Value Management(EVM) method in the project management area, the progress and maturity of the technical performance have not been included in assessing the Earned Value. The main concept of the planning process is to use cost, schedule, as well as the technical performance in the assessment of the Earned Value Management for Military R&D project management practices. The resulting process can enhance the efficiency of the project work by eliminating the currently duplicated activities between traditional project planning process and the newly implemented Earned Value Management process and by shortening the early planning process duration of projects adopting EVM practices.

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

A study on the Development of Systems Engineering Application Model for LRT based on MBSE (전산도구 기반의 경량전철사업 시스템엔지니어링 적용모델 SELRT 개발)

  • Han, Seok Youn;Kim, Joo Uk;Choi, Yo Cheol
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.9-19
    • /
    • 2012
  • The Light Rail Transit Project is a large scaled project which takes several years in building a system. After construction, LRT system is operating for several tens of years. For these characteristics, the right application of systems engineering to LRT project greatly effects the project success. In this paper, we present systems engineering application model to LRT project i.e. SELRT which include systems engineering technical process, core technology management process, project support process. SELRT also has a module for the exchange of outputs in SE tool and PM tool. Systems engineering processes in SELRT mainly base on ISO/IEC 15288. In future, we expand the range of SE processes and improve the usability in SELRT. We expect that this model will contribute to improve the efficiency in LRT project and to success the LRT project.

A survey on the perception of China private antidesertification afforestation support project and evaluation

  • Ji, Seung-Yong;Lee, Sang-Hyuk;Lee, Oh-Kyu;Choi, Jaeyong
    • Korean Journal of Agricultural Science
    • /
    • v.43 no.2
    • /
    • pp.288-297
    • /
    • 2016
  • This study is to evaluate the 'Private antidesertification afforestation support project' in the Kubuqi Desert through a survey of local residents and interviews with relevant personnel. Based on this survey, gender, age, and occupational differences in perception of the project were analyzed. In addition, the project was evaluated based on the OECD/DAC criteria using survey results and in-depth interviews with the relevant personnel. The survey analysis results show that the participants answered most of the questions positively, claiming that they were receiving social, economic, and environmental benefits through the project. However, most of the participants answered negatively to questions regarding the understanding of the project and relevant information. Gender differences in perception of the project were not found, whereas, age and occupational differences in perception were found. Older age groups showed higher levels of perception. Participants in the agro-livestock industry and office workers showed higher levels of perception compared to middle/high school students, the unemployed and college students. Teenagers, in particular, showed the lowest level of perception of the project, and thus, promotional activities targeting teenagers should be conducted in the future. Results of this evaluation of the project based on the OECD/DAC's five criteria (relevance, effectiveness, efficiency, impact, and sustainability) showed that the project operated effectively for the most part.

FLEXIBLE OPTIMIZATION MODEL FOR LINEAR SCHEDULING PROBLEMS

  • Shu-Shun Liu;Chang-Jung Wang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.802-807
    • /
    • 2005
  • For linear projects, it has long been known that resource utilization is important in improving work efficiency. However, most existing scheduling techniques cannot satisfy the need for solving such issues. This paper presents an optimization model for solving linear scheduling problems involving resource assignment tasks. The proposed model adopts constraint programming (CP) as the searching algorithm for model formulation, and the proposed model is designed to optimize project total cost. Additionally, the concept of outsourcing resources is introduced here to improve project performance.