• Title/Summary/Keyword: Project duration

Search Result 373, Processing Time 0.035 seconds

Development of a Model for Calculating the Construction Duration of Urban Residential Housing Based on Multiple Regression Analysis (다중 회귀분석 기반 도시형 생활주택의 공사기간 산정 모델 개발)

  • Kim, Jun-Sang;Kim, Young Suk
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.93-101
    • /
    • 2021
  • As the number of small households (1 to 2 persons per household) in Korea gradually increases, so does the importance of housing supply policies for small households. In response to the increase in small households, the government has been continuously supplying urban housing for these households. Since housing for small households is a sales and rental business similar to apartments and general business facilities, it is important for the building owner to calculate the project's estimated construction duration during the planning stage. Review of literature found a model for estimating the duration of construction of large-scale buildings but not for small-scale buildings such as urban housing for small households. Therefore this study aimed to develop and verify a model for estimating construction duration for urban housing at the planning stage based on multiple regression analysis. Independent variables inputted into the estimation model were building site area, building gross floor area, number of below ground floors, number of above ground floors, number of buildings, and location. The modified coefficient of determination (Ra2) of the model was 0.547. The developed model resulted in a Root Mean Square Error (RMSE) of 171.26 days and a Mean Absolute Percentage Error (MAPE) of 26.53%. The developed estimation model is expected to provide reliable construction duration calculations for small-scale urban residential buildings during the planning stage of a project.

An improvement on the concrete exothermic models considering self-temperature duration

  • Zhu, Zhenyang;Chen, Weimin;Qiang, Sheng;Zhang, Guoxin;Liu, Youzhi
    • Computers and Concrete
    • /
    • v.19 no.6
    • /
    • pp.659-666
    • /
    • 2017
  • Based on the Arrhenius equations, several hydration exothermic models that precisely calculate the influence of concrete's self-temperature duration on its hydration exothermic rate have been presented. However, the models' convergence is difficult to achieve when applied to engineering projects, especially when the activation energy of the Arrhenius equation is precisely considered. Thus, the models' convergence performance should be improved. To solve this problem and apply the model to engineering projects, the relationship between fast iteration and proper expression forms of the adiabatic temperature rise, the coupling relationship between the pipe-cooling and hydration exothermic models, and the influence of concrete's self-temperature duration on its mechanical properties were studied. Based on these results, the rapid convergence of the hydration exothermic model and its coupling with pipe-cooling models were achieved. The calculation results for a particular engineering project show that the improved concrete hydration exothermic model and the corresponding mechanical model can be suitably applied to engineering projects.

Temperature Control using Peltier Element by PWM Method

  • Pang, Du-Yeol;Jeon, Won-Suk;Choi, Kwang-Hoon;Kwon, Tae-Kyu;Kim, Nam-Gyun;Lee, Seong-Cheol
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1400-1404
    • /
    • 2005
  • This paper presents the temperature control of aluminum plate by using Peltier element. Peltier effect is heat pumping phenomena by electric energy as one of the thermoelectric effect. So if current is charged to Peltier element, it absorbs heat from low temperature side and emits heat to high temperature side. In this experiment, Peltier element is used to control the temperature of small aluminum plate with current control and operating cooling fan only while cooling duration. Operating cooling fan only while cooling duration is proper to get more rapid heating and cooling duration. As a result of experiment, it takes about 100sec period to repeating temperature between $35^{\circ}C$ and $70^{\circ}C$ and about 80sec from $40^{\circ}C$ to $70^{\circ}C$ in ambient air temperature $25^{\circ}C$ and while operating cooling fan only in cooling duration. Future aim is to apply this temperature control method in actuating SMHA(special metal hydride actuator) which is applicable in Siver project acting in low frequency range by using Peltier element for heating and cooling.

  • PDF

A Basis Study on Assessment Method of Influence Factors about the Shortening of the Construction Time Applying FMEA in Apartment Housing (FMEA를 활용한 공동주택 공기단축 영향요인 평가방법에 관한 기초연구)

  • Ha, Hee-Yoon;Ahn, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.383-386
    • /
    • 2007
  • Recently, The percentile of the apartment housing within the apartment construction of domestic is increasing daily. Especially the construction duration in apartment construction is an very important factor which affects project cost. Therefore the construction companies the effort to shorten construction duration. The influence factors of the construction duration are analyzed to shorten construction duration through this tendency. The shown factors are needed to assessment method efficiently. This study is to suggest a method for the assessment of influence factors about the shortening of the construction time in apartment housing based on the FMEA(Failure Mode and Effect Analysis) method.

  • PDF

The Estimation of Construction Duration for High School Buildings Based on the Actual Data (실적자료에 의한 고등학교 시설 공기산정)

  • Kwon Dong-Chan;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.138-145
    • /
    • 2004
  • The construction duration for any building or facilities such as high school building influence the quality of the building as well as the total cost for them. Since there are no guidelines to estimate construction duration correctly, an employer(or owner) estimate it by their own experience or intuition. Therefore some conflicts related to construction duration happen between contract parties during construction. The purpose of this study is to suggest a predictive model which helps decision makers calculate exact net working days for high school building construction at the early stage of the construction project. To measure net working days for high school construction, 15 data were collected from actual spot in Incheon region. Multiple linear regression analysis was conducted to obtain the model which calculate construction duration for the substructure, the superstructure and the finishing works. total construction duration could be obtained by adding net working days to non working days which would be based on the meteorological statistics for Incheon region since 1974 to 2003.

A Study on Satisfaction and Healthy Eating Index in Subjects of Nutrition-Plus Program focusing Seodaemun-gu in Seoul (영양플러스 대상자의 만족도와 식생활 평가에 대한 연구 - 서울 서대문구 지역 대상자를 중심으로 -)

  • Rha, Young Ah;Park, Jin Young;Kim, Jung Yun
    • Culinary science and hospitality research
    • /
    • v.22 no.8
    • /
    • pp.172-181
    • /
    • 2016
  • This study evaluated the satisfaction and healthy eating index of nutrition-plus program providing nutritional supplements to pregnancy, lactating women, infant and children. This program was carried out at Public Healthcare Center, Seodaemun-gu in Seoul from February 2014 to June 2014. The subject selected among applicants for low income family financing of the government included 159 subjects. There was no statistically significant difference for degree of satisfaction with supplementary food by age, but the degree tends to get higher at lower age. Degree of satisfaction with supplementary food by the duration for participation was shown higher as the duration gets longer. For questions of 'Do you check nutrition label?' and 'Do you preserve food as described at food label?' in healthy eating index evaluation, the scores appeared higher at younger age group as they check the nutrition label more. Also as the duration for participation gets longer, the scores appeared higher which can be interpreted as effect of nutrition education from Nutrition-Plus. Frequency of having breakfast gets lower at higher age of subjects. And it gets higher as the duration for participation gets longer even though that there's no difference between '3 to 4 months' and '5 to 8 months' of the duration of participation. For evaluation of food security in recent 1 year, 86.8% of subjects responded 'Food sufficiency' and 'Enough but not always the kinds of food we want', and there is no difference by age and the duration of participation. As a result of this research, it is shown that the subjects of nutrition support project are relatively satisfied with the support. And healthy eating index gets improved as the duration of participation gets longer which can be considered as effect of nutrition education. It seems to be necessary to keep nutrition education as well as food support so to perform food life education on appropriate purchase and consumption of food.

Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF

A Study Factor of the Feasibility Analysis in Urban Redevelopment Project (도심재개발사업의 타당성 분석 요인에 관한 연구)

  • Joo Jae-Young;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.347-352
    • /
    • 2001
  • Midtown redevelopment project is intended for restoration of city's declining function and promoting the utilization of land, but several factors such as participants of different nature in the project, different expectation level from them, high land value accompanied by geographical location as a city and the demand for high density development, nature of business that requires long duration to complete and vast amount of fund contribute to complication of feasibility study. Due to these characteristics of midtown redevelopment project, consideration of various factors involved with it and reliable analysis are required but suggested complication of feasibility study is causing halt in project, preventing from launching it and delaying it. So, this study was undertaken to be a help to feasibility study of midtown redevelopment project by suggesting main elements that need to be dealt with analysing questionnaire survey result attained from related expert in this area and arranging total 45 factors essential to feasibility study for midtown redevelopment project that can be classified into 5 main category such as economic/financial factors, legal/institutional factors, market related factors, technical factors and conflict related factors through documental investigation, case study and interview with specialist concerned.

  • PDF

Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project (초고층 복합시설물의 4D CAD 모델링 사례연구)

  • Kwan Oh-Sung;Park Woo-Yul;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.187-192
    • /
    • 2001
  • High-Rise Building Construction Project which has high uncertainty and complexity, causes lots of problems under construction. In particular, the integration between design phase and construction phase highly affects a construction project in terms of cost and time. To possibly make the flexible response and preliminary verification against the construction planning problems in high rise building project, this paper proposes the Engineering-Construction Management System based on 4D CAD that put the time factor together with 3D CAD. The usefulness of this system has been verified through the actual project. It could helps the reducing trials and errors during construction phase by catching the factors on problems of project. Ultimately it will allow users to save project cost and duration by field application.

  • PDF

Uncertainty Factors affecting Bid Price from Pre-bid Clarification Document of Transport Construction Projects

  • Jang, YeEun;Kim, HaYoung;Yi, June-Seong;Lee, Bum-Sik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.238-244
    • /
    • 2022
  • Civil projects are associated with many uncertainties because they involve a long duration, many resources, a large area, and many supply chains. Therefore, the price of a civil project is not simply proportional to the quantity and unit price of the item but has a variable value, including uncertainty risk. This study investigates the influence of the uncertainty factors in the pre-bid clarification document on bid price formation during the project bidding phase. To this end, civil projects from the California Department of Transportation (Caltrans) were used as research data. This study randomly selected fifty sample data from each of twelve counties from 2008-to 2020: six hundred. The authors observed that each project sample had 0 to n query cases due to uncertainty. Then, this study examined the project uncertainty cases and categorized them into the following four uncertainty factors: 'conflict' (UF1), 'impossibility' (UF2), 'lack' (UF3), and 'missing' (UF4). Under the extracting process, the cases are classified into four uncertainty factors. With the project not containing any uncertainty factors as a control group, the project containing these uncertainty factors was designated as an experimental group. After comparing the bidder's price, the experimental group's bid price was higher than the control group's. This result suggests that uncertainty factors in bid documents induce bidders to set a high bid price as a defense against uncertainty.

  • PDF