A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

THE APPLICATION OF THEORY OF CONSTRAINT IN SCHEDULING

  • Tsung-Chieh Tsai;Min-Lan Young
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.902-907
    • /
    • 2005
  • This study was undertaken to develop a comprehensive scheduling method which applied the core concept(DBR) of TOC to PERT, and to combine Monte Carlo Simulation to revise the uncertainties of activities then to eliminate project duration uncertainty. Most of the project duration overlooks the fact that in spite of minimizing the project duration, the uncertainty of constrained resources still puts the reliability of project duration in jeopardy. For the contractor, however, the most important thing is to comply the project scheduling with the planning to reduce the uncertainty of the project activities, operational interaction and project duration. In order to demonstrate that the model can be used in construction project, the scheduling of a steel-structure project was used as a case study to verify the validity of this model.

  • PDF

부분적으로 반복되는 프로젝트를 위한 프로젝트 내$\cdot$외 학습을 이용한 프로젝트기간예측과 위험분석 (Project Duration Estimation and Risk Analysis Using Intra-and Inter-Project Learning for Partially Repetitive Projects)

  • 조성빈
    • 한국경영과학회지
    • /
    • 제30권3호
    • /
    • pp.137-149
    • /
    • 2005
  • This study proposes a framework enhancing the accuracy of estimation for project duration by combining linear Bayesian updating scheme with the learning curve effect. Activities in a particular project might share resources in various forms and might be affected by risk factors such as weather Statistical dependence stemming from such resource or risk sharing might help us learn about the duration of upcoming activities in the Bayesian model. We illustrate, using a Monte Carlo simulation, that for partially repetitive projects a higher degree of statistical dependence among activity duration results in more variation in estimating the project duration in total, although more accurate forecasting Is achievable for the duration of an individual activity.

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • 제14권3호
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • 토지주택연구
    • /
    • 제2권4호
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

IT프로젝트 관리자의 리더십 유형별 역량이 프로젝트 성과에 미치는 영향 (The Project Managers' Competency by Leadership Style to Succeed the IT Projects)

  • 김화영;강소라
    • 한국IT서비스학회지
    • /
    • 제7권2호
    • /
    • pp.95-111
    • /
    • 2008
  • The objective of this study is to suggest the effects of the fit between project managers' competency and leadership style on the performance of IT projects. Also, this study examine that the project duration among the project's characteristics moderates the impact of the managers' competency and leadership style on the performance of IT projects. As the results of analysis, we found that the participative leadership and the supportive leadership of project manager is affected by the human and the conceptual skills, and the directive-achievement leadership is affected by the technical skills positively. The project duration moderates the impact of the fit between the participative leadership and the technical skills. and the fit between the directive-achievement leadership and the technical and the human skills positively.

Time-Profit Trade-Off of Construction Projects Under Extreme Weather Conditions

  • Senouci, Ahmed;Mubarak, Saleh
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권4호
    • /
    • pp.33-40
    • /
    • 2014
  • Maximizing the profitability and minimizing the duration of construction projects in extreme weather regions is a challenging objective that is essential for project success. An optimization model is presented herein for the time-profit trade-off analysis of construction projects under extreme weather conditions. The model generates optimal/near optimal schedules that maximize profit and minimize the duration of construction projects in extreme weather regions. The computations in the model are organized into: (1) a scheduling module that develops practical schedules for construction projects, (2) a profit module that computes project costs (direct, indirect, and total) and project profit, and (3) a multi-objective module that determines optimal/near optimal trade-offs between project duration and profit. One example is used to show the impact of extreme weather on construction time and profit. Another example is used to show the model's ability to generate optimal trade-offs between the time and profit of construction projects under extreme weather conditions.

제한된 프로젝트 기간을 고려한 품질 기반 소프트웨어 프로젝트 계획 생성 기법 (Quality-Based Software Project Staffing and Scheduling with Project Deadline)

  • 서동원;신동환;배두환
    • 정보과학회 논문지
    • /
    • 제42권7호
    • /
    • pp.878-888
    • /
    • 2015
  • 소프트웨어 프로젝트 계획은 각 작업의 공수를 예측하고, 적절한 인력을 할당한 뒤 일정을 산출하는 과정을 포함한다. 프로젝트의 규모가 커질수록 가능한 개발 계획의 경우의 수가 많아지기 때문에 관리자가 합리적인 결정을 내리기 어렵다. 이를 지원하기 위해 프로젝트 계획 생성 기법들이 제안되어왔다. 제안된 대부분의 기법들은 전체 프로젝트 일정의 최소화를 계획 생성의 가장 중요한 목표로 사용한다. 하지만 일정 최소화를 달성하는 계획은 개발되는 소프트웨어의 품질을 고려하지 못하기 때문에 이러한 부분을 함께 반영한 프로젝트 계획 생성이 필요하다. 본 연구에서는 합리적인 프로젝트 계획을 생성하기 위하여 소프트웨어 프로젝트 계획에 따른 소프트웨어 품질 점수를 정의하고 동시에 전체 일정 목표를 고려할 수 있는 프로젝트 계획 생성 기법을 제안한다. 관리자는 본 기법을 사용하여 전체 소프트웨어 개발 프로젝트에 요구되는 기한 안에 해당 소프트웨어의 품질을 최대하는 계획을 생성할 수 있다.

확률적 연결관계 평가기법(PLET)에 의한 사업공기 추정 (Estimation of Project Duration by Probabilistic Linkage Evaluation Technique (PLET))

  • 김선규
    • 한국건설관리학회논문집
    • /
    • 제15권6호
    • /
    • pp.44-52
    • /
    • 2014
  • 일반적으로 공정계획을 수립할 때 가장 어려운 업무가 작업별 공기와 작업간 연결관계를 추정하는 것이다. 왜냐하면 사업에 잠재된 위험요인들로 인해 작업공기와 작업간 연결관계가 불확실성에 노출될 가능성이 높기 때문이다. 따라서 사업공기를 확률적으로 추정할 경우 작업공기에 대한 확률적인 추정뿐만 아니라 작업간 연결관계에 대한 확률적인 추정도 반드시 고려해야 한다. 확률적으로 사업공기를 추정하는 대표적인 방법인 PERT기법은 작업간 연결관계를 'FS0'로 확정하고 작업공기만을 확률적으로 추정하므로 작업관계의 불확실성을 고려할 수 없었다. 본 연구에서는 BDM기법의 연결관계를 확률적으로 추정함으로써 전체 사업공기를 확률적으로 추정하는 새로운 방법인 PLET기법을 제안하고, 이를 통해 사업공기에 대한 보다 폭넓고 다양한 확률적인 정보를 제공하는데 목적이 있다.