• Title/Summary/Keyword: Project delivery system

Search Result 226, Processing Time 0.025 seconds

The Prediction of the Apartment Construction Project Cashflow with Changing Sales Point (분양시기 변동에 따른 공동주택 건설공사 현금흐름 예측)

  • Bae Jun-Ho;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.234-237
    • /
    • 2003
  • The Korean housing supply have been provided by the Pre-construction sales system. The Pre-construction sales system contributed to large housing supply. But it followed by the market anomaly. Along the housing market is changing to tile market for consumers, it requires new policy and regulations. This market changes and needs to modify the policy make a discussion about introducing the Post-construction sales system. it concerns to change the time to sale. This paper analyzes the present feasibility study and makes a tool to predict construction cashflow considering changed sales point. The sales timing leads to decide the amount of financial costs in the construction project and that cost affects to the feasibility. The accurate cashflow prediction is required for a successful apartment construction delivery.

  • PDF

Identifying the perception on the introducing of Construction Management(CM) in the civil infrastructure project delivery system (사회간접자본 프로젝트의 CM제도 활성화방안에 대한 인식분석 연구)

  • Jang, Won-Suk;Lee, Sang-Uk;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.91-100
    • /
    • 2013
  • Current environment in civil and construction industry has changed to actively adopt construction management (CM) in various areas. While it is found that exemplary CM projects have been carried out in many civil engineering sectors, concrete system framework has not been suggested due to ambiguous boundary between CM and supervision system, unclear perception of CM's role, and inexperienced organization and regime. This paper investigated the challenges faced in civil and construction industry, and analyzed the strategy that could improve the current immature CM system by conducting questionnaire survey from experts in various construction sectors. The results could provide valuable information that can involve diverse opinions and view points in project participants.

A Phenomenological Study on the Subsidiary Program of Health Management in Small Scale Industries (소규모사업장 보건지도사업내용의 현상학적 연구)

  • Cho Yoo-Hyang;Lee Myung-Sook;Kim Myung-Soon;Kim Hyun-Li
    • Journal of Korean Public Health Nursing
    • /
    • v.12 no.1
    • /
    • pp.1-12
    • /
    • 1998
  • This study was conducted to grasp the progress of the health management program in small scale industries with phenomenological approach. The industrial health care system compose of manpower, devices, and facilities such as medical resources, organization, service delivery system, financial resources, payments, and management system is important for the industrial health. Especially health management program should be provided feasible conditions to workers. The data collection period was 2 months from September 1 to October 30, 1997. The indepth interview results for health monitor, labors, and occupational health nurses were analyzed by Giorgis' phenomenological method. The major results were as follows: 1. The workers, health monitors and nurses felt that the subsidiary program of health management in small scale industries were necessary. This project for small-size industry can be set-up through complementary education for health monitors and resolvement of nurses' six suggestions. It is necessary to provide followings ; 1) Properly devision of industry 2) More clear guidance for health management at visiting time 3) Legitimate incentive system 4) Health education materials and devices 5) Change of fee and material payments at visiting 6) Budgets and system for medication and vaccination at visiting 2. Above all, it is suggested that the strategics of the health management program should be developed.

  • PDF

Characteristics of AS9100 Rev. C Quality Management System and Its Implementation (AS9100 Rev. C 규격의 특징과 적용 방안)

  • Yeo, Eung-Mo;Byun, Jai-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.39 no.4
    • /
    • pp.516-526
    • /
    • 2011
  • The AS9100 standard builds upon the ISO 9001:2000 quality management system requirements(in their entirety) and defines additional quality management system requirements for the aerospace industry. The 9100 standard on quality management system requirements is intended to be used at all levels of the supplier chain. The International Aerospace Quality Group has released a revision to 9100 for the aviation, space and defense industries. This change aims at improvement on quality, schedule and cost performance by adopting new requirements based on stakeholders' needs. This paper is to review how the AS9100 QMS Requirement has been established and improved, and to communicate the significant changes from AS9100, Rev. B to Rev. C focusing on reasons for revisions. The proposed schedule and considerations on the transition of the changes to Rev. C are also dealt with in this paper.

A Study on the Design and Implementation of Coordination Agent System in e-SCM (e-SCM에서의 Coordination Agent 시스템 설계 및 구현에 관한 연구)

  • 임상환;김영훈;엄완섭
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.11a
    • /
    • pp.246-251
    • /
    • 2003
  • 공급체인관리는 개별적 기업 에이전트(마케팅, 자재, 구매, 생산, 유통등)를 통합하여 운용하도록 하는데, 이러한 통합은 한 기업에서 국한되는 것이 아니라 공급자로부터 소비자까지의 공급체인의 모든 에이전트에게 적용된다. 공급체인의 에이전트들 간의 통합이 실질적으로 효과를 나타내기 위해서는 상호 정보 공유 및 조정된 방법으로 운영되어야 한다. 전자거래에 대한 요구가 증대되면서 새로운 변화에 유연하게 대처하고 예측하지 못했던 상황, 즉 Order에 대한 주문량 변경/취소, 새로운 고객 등장(긴급을 요구하는 Project등)으로 새로운 Order 생성, 계절적 요인으로 인한 주문량 폭주, Event에 의한 특정 상품에 대한 Cost Down 및 Cost 복원, 원자재/제품의 불량처리에 대한 Delivery 일정 수정 등과 같은 사건에 능동적으로 대처할 수 있도록 공급체인 내에서 Intelligent 기능을 가진 Coordination Agent의 도입이 요구되고 있다. 따라서 본 연구에서는 전자거래와 공급체인을 연계한 e-SCM에서의 조정 에이전트 시스템을 구현하고 Agent의 Coordination 능력을 분석한다.

  • PDF

A Framework for Hierarchical Production Planning and Control in Make-to-Order Environment with Job Shop (Job Shop 형태를 갖는 주문생산 환경에서의 계층적 생산계획 및 통제 Framework의 설계)

  • 송정수;문치웅;김재균
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.16 no.2
    • /
    • pp.125-125
    • /
    • 1991
  • This paper presents a framework for the hierarchical PPC(Production Planning and Control) in make-to-order environment with job shop. The characteristics of the environment are described as : 1) project with non-repetitive and individual production, 2) short delivery date, 3) process layout with large scales manufacturing. 4) job shops. The PPC in a make-to-order typically are organized along hierarchical fashions. A model is proposed for the hierarchical job shop scheduling based on new concepts of production system, work and worker organization. Then, a new integrated hierarchical framework is also developed for the PPC based on concepts of the proposed job shops scheduling model. Finally, the proposed framework has been implemented in the Electric Motor Manufacturing and the results showed good performance.

A Study on IT Service Management Based on ITIL with Consideration of IT Governance Structures : Focused on A Case Study of Manufacturing Company (IT 거버넌스 체계를 고려한 ITIL 기반의 IT 서비스 관리에 관한 연구 : 제조업 사례 중심으로)

  • Oh, Hwa-Seog;Cho, Chi-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.1
    • /
    • pp.149-159
    • /
    • 2010
  • Unknowingly, the relationship between IT departments and their internal customers becomes that of client-supplier based on the mechanisms of marketing and competition. In addition, due to enhanced focus on the customer in the planning, development, and delivery of information service, IT service management(ITSM) has become increasingly important. These days IT management is focusing particularly on the 'de-facto' standard ITIL (IT Infrastructure Library) for implementing ITSM. It is linked as a part of CobiT’s 'deliver and support' domain, which is a framework of IT governance, and ISO/IEC 20000 is a unique international certification standards on the ITSM. This paper proposes the strategy and procedure for ITSM implementation based on ITIL with consideration of IT governance structure for manufacturing industries. It also presents a case study to share the lessons learned and results of an ITSM project.

A Framework for Hierarchical Production Planning and Control in Make-to-Order Environment with Job Shop (Job Shop 형태를 갖는 주문생산 환경에서의 계층적 생산계획 및 통제 Framework의 설계)

  • 송정수;문치웅;김재균
    • Korean Management Science Review
    • /
    • v.16 no.2
    • /
    • pp.125-135
    • /
    • 1999
  • This paper presents a framework for the hierarchical PPC(Production Planning and Control) in make-to-order environment with job shop. The characteristics of the environment are described as : 1) project with non-repetitive and individual production, 2) short delivery date, 3) process layout with large scales manufacturing. 4) job shops. The PPC in a make-to-order typically are organized along hierarchical fashions. A model is proposed for the hierarchical job shop scheduling based on new concepts of production system, work and worker organization. Then, a new integrated hierarchical framework is also developed for the PPC based on concepts of the proposed job shops scheduling model. Finally, the proposed framework has been implemented in the Electric Motor Manufacturing and the results showed good performance.

  • PDF

Code coverage Testing in Next Generation Banking System Project (코드 커버리지 테스팅 기법의 금융권 차세대 프로젝트 적용사례)

  • Kim, Hee-Yeong;Yang, Sang-Tae
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.343-350
    • /
    • 2009
  • 대규모 금융권 차세대 프로젝트에서 테스트에 대한 중요성은 재무RISK 관점에서 뿐만 아니라 소프트웨어 품질향상을 위한 결함의 제거 관점에서도 그 의미가 크다. 대규모 차세대 프로젝트는 일반 프로젝트에 비하여 개발되는 소프트웨어의 양이 방대하고 개발참여인원도 일반적인 관리수준을 넘어 수작업에 의한 테스트만으로는 충분한 품질을 보장하지 못한다. 또한 테스트를 수행한 이후에도 지속적으로 변경이 발생하고 이를 반영하는 과정에서 많은 결함이 유입되는 현재의 SI 프로젝트 특성상 지속적인 테스트 및 반복적인 검증만이 소프트웨어의 품질을 보장할 수 있다. 본 논문에서는 code coverage testing기법을 활용하여 동적 테스트 수행결과를 log로 도출하고, log 분석 결과를 통해 소프트웨어 품질의 향상을 기대할 수 있는 방안을 제시한다.

  • PDF

Critical Success and Failure Factors of e-Government Project Implementation in Kenya (케냐의 전자정부 프로젝트 핵심 성공 및 실패 요인)

  • Wamoto, Francis O.K.;Hwang, Gee-Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.119-128
    • /
    • 2016
  • Use of ICT in Government has ability to improve service delivery to its citizens, and yet many developing countries have lagged behind in the implementation of e-Government. Many e-Government initiatives also failed to achieve their objectives in developing countries. This paper therefore aims to identify critical failure or success factors in Kenya, using Heeks' Factor Model. A survey questionnaire was developed and data were collected and analyzed from officials and interested citizens. The analysis results enabled to highlight seven specific success and failure factors, and their constituent elements in Kenya. The Kenyan overall e-Government implementation score belongs to the Zone of Improvement (3.52 of total 5.0), which means partial success or failure. The enablers of e-Government projects are good strategy formulation, and internal and external drive, whereas main failures of e-Government are weak ICT infrastructure. The areas for improvement are project management, design, competencies and funding. Data analysis highlights both strengths and weaknesses for each factor or variable. In particular, Kenyan government excels at the drive for change by top to bottom government officers as well as external stakeholders, while the government officers who are using e-Government are satisfied with the availability of vision, strategy and plan of e-Government implementation. Both technologies and e-transactions laws were the worst of all the variables in e-Government implementation. Two areas should be improved using immediate corrective action. In-depth study reveals that government officers and citizens can't fully use their laptop and mobile devices due to the lack of both ICT network and its operating technology, and legal system associated with the transaction of business information. Finally, the study ends up with recommendations for policy makers to shape the future of e-Government system in both developing and developed countries.