• Title/Summary/Keyword: Project delivery

Search Result 425, Processing Time 0.029 seconds

IMPACTS OF DESIGN-BUILD DELIVERY SYSTEM ON THE CONSTRUCTION INDUSTRY IN TAIWAN

  • Min-Ren Yan;Wei Lo;Chien-Liang Lin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1007-1012
    • /
    • 2005
  • Although the design-build (DB) delivery system has been taking great strides in the world and relevant researches have also been quite abundant, few studies have dealt with its potential impacts on the construction industry as a whole. This research first identified the potential entry barrier factors, which may hinder the market access, based on the theory of industrial economics and characteristics of DB project. Then through a nation-wide questionnaire survey involving 103 construction contractors and engineering consultants, the influences of each factor on company's competitiveness and corporate strategies were scrutinized, and consequently, the evolution of the construction industry was examined. It is found that as opposed to the traditional design-bid-build delivery system, the DB delivery system elevates competitive advantages of large organizations in terms of the financial capability, working experience, human resource, and administrative strength, and among them, the financial strength was concluded to be the most significant force in differentiating corporate strategies and widening the gap of competitiveness between companies. It is inferred if the government extensively adopts DB delivery system, large organizations that already possess the competitive advantage tend to obtain both design and construction abilities, and dominate the DB market. Small and medium sized companies will find little room to maneuver and be forced to become specialty sub-contractors.

  • PDF

AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments (지자체 공공건설사업의 발주방식 선정기준에 관한 연구)

  • Choi, Eun-A;Kim, Byung-Ok;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.111-117
    • /
    • 2009
  • With the current trend in the industry toward increasingly complex, diversified and large construction projects, advanced countries in the construction field have already introduced and applied a variety of methods for placing orders in order to cope with such changes in construction circumstances. In Korea, there have been efforts to continuously improve approaches to placing an order. With the aim of diversifying the methods of Delivery Systems, the "Technical Proposal Type Bid," and the "Design Competition and Technical Proposal Type Bid" were introduced through a revision of Korea's contract law enforcement ordinance. In line with the government's efforts, criteria for a method of placing an order that is suitable for a public construction project should be presented. This study enumerates the current issues using a survey for construction projects already placed and an analysis of the current status, and presents the selection criteria for Delivery Systems by business type as an improvement for the problem.

Formulation and In vitro Evaluation of Transdermal Drug Delivery System for Galantamine

  • Hossain, Md. Kamal;Subedi, Robhash Kusam;Chun, Myung-Kwan;Kim, Eun-Jung;Moon, Hwan-Shik;Choi, Hoo-Kyun
    • Journal of Pharmaceutical Investigation
    • /
    • v.41 no.1
    • /
    • pp.1-7
    • /
    • 2011
  • The effects of different formulation variables including pressure sensitive adhesive (PSA), permeation enhancer, thickness of the matrix and loading amount of drug on the transdermal absorption of galantamine were investigated across the hairless mouse skin. The permeation profile of galantamine was different depending on the types of PSA, loading amount of drug, thickness of the matrix and type of enhancer used. Highest flux of galantamine was obtained from acrylic PSA but crystals were formed in the patch within 72 h. Among the PSAs screened, crystal formation was not observed only in the patches formulated in Styrene Butadiene Styrene (SBS) matrix. Permeation rate increased linearly as the concentration of galantamine in SBS matrix increased from 2.5 to 15% w/w. Among the enhancers screened, Brij$^{(R)}$ 30 provided highest flux of galantamine. Matrix thickness of 80 ${\mu}m$ was optimum for maintaining adhesiveness as well as consistently delivering galantamine for longer period of time.

'Knowing' with AI in construction - An empirical insight

  • Ramalingham, Shobha;Mossman, Alan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.686-693
    • /
    • 2022
  • Construction is a collaborative endeavor. The complexity in delivering construction projects successfully is impacted by the effective collaboration needs of a multitude of stakeholders throughout the project life-cycle. Technologies such as Building Information Modelling and relational project delivery approaches such as Alliancing and Integrated Project Delivery have developed to address this conundrum. However, with the onset of the pandemic, the digital economy has surged world-wide and advances in technology such as in the areas of machine learning (ML) and Artificial Intelligence (AI) have grown deep roots across specializations and domains to the point of matching its capabilities to the human mind. Several recent studies have both explored the role of AI in the construction process and highlighted its benefits. In contrast, literature in the organization studies field has highlighted the fear that tasks currently done by humans will be done by AI in future. Motivated by these insights and with the understanding that construction is a labour intensive sector where knowledge is both fragmented and predominantly tacit in nature, this paper explores the integration of AI in construction processes across project phases from planning, scheduling, execution and maintenance operations using literary evidence and experiential insights. The findings show that AI can complement human skills rather than provide a substitute for them. This preliminary study is expected to be a stepping stone for further research and implementation in practice.

  • PDF

A Heuristic Algorithm for Resource-Constrained Multi - Project Scheduling (자원제약하의 복수 프로젝트 일정계획을 위한 휴리스틱 알고리즘)

  • Kong, Myung-Dal;Kim, Jung-Ja
    • IE interfaces
    • /
    • v.13 no.1
    • /
    • pp.110-119
    • /
    • 2000
  • Resource-constrained project scheduling is to allocate limited resources to activities to optimize certain objective functions and to determine a start time for each activity in the project such that precedence constraints and resource requirements are satisfied. This study suggests a multi-project scheduling model which can level work loads, make the most of production capacity and restrain the delay of delivery by developing a heuristic algorithm which minimizes the project completion time and maximizes the load rate under resource constraints.

  • PDF

A study on the Application of Operation Model for Technical Proposal-Based Tender of Large Construction Project (대형공사에 효율적인 기술제안형 입찰방식 적용에 관한 연구)

  • Cho, Sung;Cho, Yong;Paek, Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.591-596
    • /
    • 2008
  • Success or failure highly depends on delivery method in construction projects. This paper mainly focused on operation model for technical proposal in Large construction projects. This operational model uses Technical Proposal-Based Tender. This project studied order and delivery method in large construction projects. And delivery systems of international and domestic market are researched, and then condition of delivery system and problems are derived from them. Especially, it researched that it is hard to reflect special feature in large construction projects. As a result of having referenced idea as describe above, this paper will be studied by this process. First, definition of delivery method and large construction projects is researched. Second, delivery systems of international and domestic market are checked. Third, problems and condition of delivery system in large construction projects are investigated. Fourth, application of operation model for technical proposal-based tender are presented in large construction projects.

  • PDF

AUTOMATIC DATA COLLECTION TO IMPROVE READY-MIXED CONCRETE DELIVERY PERFORMANCE

  • Pan Hao;Sangwon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.187-194
    • /
    • 2011
  • Optimizing truck dispatching-intervals is imperative in ready mixed concrete (RMC) delivery process. Intervals shorter than optimal may induce queuing of idle trucks at a construction site, resulting in a long delivery cycle time. On the other hand, intervals longer than optimal can trigger work discontinuity due to a lack of available trucks where required. Therefore, the RMC delivery process should be systematically scheduled in order to minimize the occurrence of waiting trucks as well as guarantee work continuity. However, it is challenging to find optimal intervals, particularly in urban areas, due to variations in both traffic conditions and concrete placement rates at the site. Truck dispatching intervals are usually determined based on the concrete plant managers' intuitive judgments, without sufficient and reliable information regarding traffic and site conditions. Accordingly, the RMC delivery process often experiences inefficiency and/or work discontinuity. Automatic data collection (ADC) techniques (e.g., RFID or GPS) can be effective tools to assist plant managers in finding optimal dispatching intervals, thereby enhancing delivery performance. However, quantitative evidence of the extent of performance improvement has rarely been reported to data, and this is a central reason for a general reluctance within the industry to embrace these techniques, despite their potential benefits. To address this issue, this research reports on the development of a discrete event simulation model and its application to a large-scale building project in Abu Dhabi. The simulation results indicate that ADC techniques can reduce the truck idle time at site by 57% and also enhance the pouring continuity in the RMC delivery process.

  • PDF

A Case Study on the CM Effect Analysis According to Project Delivery Methods in Private Projects (민간 프로젝트에서의 발주방식에 따른 CM효과 분석에 관한 사례연구 -전통적 방식과 발주자형 CM을 중심으로-)

  • Lee Hee-Chang;Kim Young-Il;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.278-281
    • /
    • 2003
  • The purpose of this study is to analyze CM effects between traditional and owner CM types according to project delivery methods in private projects. The research method of this study includes case studies and survey from construction management experts. The results of this study are as follows: 1)The owner CM type is proved to be much more effective than traditional method in various management function areas. 2)Planning, design, and quality management areas are proved to be very strong in the case of owner CM type.

  • PDF

Necessity Review of IPD(Integrated Project Delivery) for Free-Form Building in Domestic (비정형건축물의 IPD(Integrated Project Delivery) 도입 필요성 검토)

  • Kim, Sung-Jin;Park, Sung-Jin;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.308-309
    • /
    • 2014
  • A lot of very complex free-form buildings such as Seoul City Office and DDP(Dongdaemun Design Plaza) have been recently built nowadays in domestic. However, as construction methods and cost data are decided without enough discussion and collaboration with specialized subcontractors during design stage, construction quality problems and cost overrun of the free-form buildings are thus occurred during construction stage. Therefore design system and process or contract and ordering system should be developed participating the specialized subcontractors during design stage in order to perfect the free-form design and construction. Especially US has thus an effort to apply IPD(Integrated Project Delivery) system which can solve the problems of construction quality, productivity decrease and cost overrun by constructing the buildings based on exact drawings and collaboration as well as activating BIM(Building Information Modeling). Therefore this study reviews cases of the free-form buildings in domestic and then presents necessity review of IPD in domestic.

  • PDF

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.