• Title/Summary/Keyword: Project course

Search Result 439, Processing Time 0.031 seconds

Cooperative Design Method for Building Projects (건축 프로젝트의 협력설계 방안)

  • Kim, Eun-Youn;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.67-76
    • /
    • 2011
  • Two main features of the recent building project are the enlargement of the size and the technological complexity. Due to these features, the number or the size of organizations participating in building project is also increasing and the relationships between the organizations are becoming more interdependent than ever. Owing to these features, some delays or errors in the decision-making process in the phase of planning of a building project may influence many subjects related to the project. The most important factor for a successful project is to arbitrate confrontations and build cooperative relationships between parties who have different interests with one another in the project. Efforts were made to find out general features of building project and the features in the phase of planning in order to set a direction of this research. To solve problems in the phase of planning, the concept of 'cooperative design', which means that different features and interests of various organizations should be reflected from the phase of planning, was introduced. By introducing cooperative design in building projects, more rapid and objective decision-makings are possible.

  • PDF

DEVELOPMENT OF GENERAL PHYSICS CAI PROGRAM FOR UNIVERSITY SCIENCE AND ENGINEERING STUDENT (이공계(理工系) 학생을 위한 일반물리학 CAI 프로그램의 개발)

  • Kim, Chang-Sik;Yoon, Sung-Ro;Cho, Young-Suk;Kim, Chul-Sung
    • Journal of The Korean Association For Science Education
    • /
    • v.9 no.1
    • /
    • pp.53-67
    • /
    • 1989
  • General Physics CAI Program was developed for university science and engineering student. The program was restricted in the field of mechanics and was mainly aimed for individual tutorial. This project was supported by Government. Department of Education, physics attending their general physics classes in university. The program was written in BASIC and constructed by frame, 4 professors and 6 graduate students were involved in the project. Summary of this study is as follows. 1. The theory of CAI was illuminated from a new point of view to enhance usefullness of CAI. Also the structure of frame type CAI was studied. 2. The program was developed as follows 1) The program consisted of main program, pretest routine, tutorial routine, final test routine, and several other routines for program control. Whole program was written in BASIC. 2) 20 problems for pretest, 90 problems and subsequent hints and solutions for tutorial, 20 problems for final test were developed. 3) According to student's pretest result, tutorial course was routed through several different courses which contain different number of problems 4) The expected rate of achievment for final test was set to 75%. 5) Data of students response to problems including number of tries and time used were recorded for the purpose of achievment analisys 3. 22 students went through whole course and the results were as follows. 1) Pretest marks were widly distributed from 20 points to 100. It means that achievement of high school physics course were not enough. 2) Throughout tutorial course, students who had got higher mark in pretest answered correctly in the first trial at a higher rate of 78 %. Overall rate of correct answer in the second trial was distributed appropriatly. 3) Average mark of final test was 78.8 points, rather a higher rate of achievement than expected. This means that the program was constructed well.

  • PDF

Case Study on Industry-Academia Cooperation Capstone Design: Focusing on Information and Communication Engineering (산학협력 캡스톤디자인 운영사례 연구: 정보통신공학 중심으로)

  • Bokrae Jung
    • Journal of Practical Engineering Education
    • /
    • v.15 no.1
    • /
    • pp.45-51
    • /
    • 2023
  • The graduation project, which is the final results of the capstone design course, is not only the highest peak in university major education, but also criteria of the practical skills of fourth grader who is supposed to get a job in the future. Therefore, it is needed to operate a capstone design course that reflects industry requirements and its support system for cooperation with industry. In this study, we present a case of the capstone design course and the industry-academic capstone design program at the department of Information and Communication Engineering in Sungkyul University. At the time being transitioned from offline to online class due to COVID-19, we evaluate results of the capstone design class over the past three years and induce improvements for the further operation of the class. This study may contribute to be a practical reference for ICT-related departments that attempt to apply social demands in their capstone design course through industry-academic cooperation

The Suggestion of Direction for Improvement Through Achievements Diagnosis of Pilot Operation of High-Skilled Meister Course in Degree-Linked Work-Study in Parallel (학위연계형 일학습병행 고숙련마이스터 과정의 시범 운영 성과 진단을 통한 개선 방향 제안)

  • Seung-Hee Kim;Jun-Ki Min
    • Journal of Practical Engineering Education
    • /
    • v.16 no.4
    • /
    • pp.499-512
    • /
    • 2024
  • In this study, we diagnosed the results and achievements of pilot operation of high-skilled meister course in degree-linked work-study in parallel, which has been carried out, and suggested of direction for improvement and desirable implementation. In the achievement diagnosis, the results of training served by the university operating this course, the performance and recognition of expert activities after graduation, the self-efficacy in the degree of strengthening one's capabilities as a corporate field teacher, and the self-efficacy for the degree of strengthening the company's human capabilities, and the government performance was diagnosed. Based on the analysis, various operational improvement directions were derived to revitalize high-skilled meister courses in degree-linked work-study in parallel. This study increased the reliability of the study by diagnosing and examining the empirical performance of the entire Advanced Meister Course pilot project through actual performance aggregate data and graduates who participated in the project. It also provides a theoretical basis for policy decisions by verifying implications and desirable directions for improvement through expert advice.

Virtual Learning Environments for Statistics Education and Applications for Official Statistics

  • Mittag Hans-Joachim
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2004.11a
    • /
    • pp.307-312
    • /
    • 2004
  • In our fast-moving information and knowledge society, skills and know-how rapidly become outdated. Virtual learning environments play a key role in meeting today's growing demand for customized educational and vocational training and lift-long teaming. The scope of multimedia-based and web-supported education is illustrated by means of an interdisciplinary multimedia project 'New Statistics' funded by the German government. The project output contains more than 70 learning modules covering the complete curriculum of an introductory statistics course. All modules are based on a statistical laboratory and on a multitude of Java applets, animations and case studies. The paper focuses on presenting the statistical laboratory and the applets. These components present the main project pillars and are particularly suitable for international use, independently from the original project framework. This article also demonstrates the application of Java applets and other multimedia developments from the educational world to official statistics for interactive presentation of statistical information.

  • PDF

A study on the problem and Counter measure of plant Construction project. -Based on tile work of both civil engineering and steel structure in the plant construction project of On-San Refinery- (PLANT 건설공사의 문제점과 대책에 관한 고찰 (온산동련소 건설의 토건공사및 철골공사 사례를 중심으로))

  • 유광수
    • Journal of the Korean Professional Engineers Association
    • /
    • v.16 no.1
    • /
    • pp.13-19
    • /
    • 1983
  • As one of staff members participated in the full course of the plant construction project of On-san Refinery to its successful completion. I had my past expierence that the plant construction project was so complicated, and a Long period required, and thus there were so money problems to be solved. Among the problem, I mainly noticed that the following listed points were solved and improved. 1. Each drawing should be in every accuracy possible. 2. Contract should be specified in every detail possible. 3. All invoiced prices of breack down list should be coped with the current market prices. 4. All execution of work should be in the most accuracy. A. Planing execution of work. B. Coordination with supervisor group. C. Economical method for execution of work. D. Safety control. 3, Calculation work field should be established seperately 6. Each staff members should be work at the best of his pride.

  • PDF

The application of the Intuitive Method to Evaluate Feasibilities of Railway Project (철도사업에의 직관적 타당성 평가모형 적용)

  • Kim, Hyun-Woong;Hyeon, Jae-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.437-441
    • /
    • 2010
  • The SOC project such as road and railway performs a preliminary feasibility study according to the priority of the individual projects after establishing the master plans. For a preliminary feasibility study, feasibility evaluation should be performed according to the transport demand estimation and economic analysis. The feasibility of individual project will be performed by focussing on the results of analyzing economic feasibility. In case that analysis of the traffic demand and the economic feasibility every phase is performed, a lot of time and expense will be required in the course of promoting projects. So this study could give help to determine the priority of the project by intuitive method only in the phase to establish the master plan and a preliminary feasibility study.

  • PDF

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

PROBLEMS AND SOLUTION OF IDENTIFICATION AND APPROVAL OF PRIVATELY FINANCED INFRASTRUCTURE PROJECTS IN CHINA

  • Xiangrong Du;Tsunemi Watanabe
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.731-736
    • /
    • 2005
  • The governmental attitude toward private investment and financing for infrastructure projects has changed from the initial prohibition to the current encouragement in China, which has been embodied in the legal documents and administrative process. However, the problem of identification, bidding, and approval procedure for privately financed infrastructure projects has been observed in policies and administrative measures promulgated by different or even the same government branches, which is prohibitive factors for smooth project implementation. After analysis of the identification, bidding, and approval process of infrastructure projects, the authors proposed a simplified and alternative procedure and clarified the key points of relevant project documents.

  • PDF

Comparing Efficiencies of R&D Projects Using DEA : Focused on Core Technology Development Project (DEA를 이용한 R&D 사업의 효율성 비교 : 원천기술개발사업을 중심으로)

  • Kim, Heung-Kyu;Kang, Won-Jin;Park, Jung-Hee;Yeo, In-Kuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.3
    • /
    • pp.126-132
    • /
    • 2013
  • In this paper, efficiencies of core technology development projects, conducted by Ministry of Trade, Industry and Energy, are compared. In the process, DEA (Data Envelopment Analysis) is utilized as a main technique for comparing efficiencies. For DEA, input oriented BCC Model is adopted with government grant, recipient expenditure, the number of participating institutions, and project duration as input factors, and the number of patents, the number of papers, and occurred sales as output factors. As a result, next generation mobile communication project turns out to be the most efficient project of all. Therefore, next generation mobile communication project should be benchmarked for the other projects to follow. However, these results should be used only for reference data since every project has a different objective and, of course, is run under a different environment.