• Title/Summary/Keyword: Project Stakeholders

Search Result 308, Processing Time 0.024 seconds

Communication-Centered Project Management for Requirements Definition Phase

  • Ishii, Nobuaki;Muraki, Masaaki
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.39-47
    • /
    • 2012
  • Requirements definition, which determines a project baseline, has a strong impact on the success of a project. However, since in-depth requirements are gradually revealed through the requirements definition process, the requirements definition is not a straight forward process and often falls into disorder. Thus project management standpoints are critical for the success of the requirements definition. In this paper, we present a framework and mechanisms of communication-centered project management, which controls the requirements definition process based on the situation of communication-oriented activities among stakeholders. In addition, we present a communication-centered project plan with a planning method. The project plan, which represents a time schedule of requirements definition activities, is made by a simulation-optimization algorithm using a stakeholder matrix showing the relations of requirements domains and relevant stakeholders. The effectiveness and the significance of communication-centered project management at the requirements definition phase are demonstrated by numerical examples.

Evaluation of the ODA Forest Cooperation Projects in Korea through Stakeholder and Visitor Survey - A Case Study of the Rumpin Seed Source and Nursery Center Projects in Indonesia - (이해관계자와 이용객 설문 조사를 통한 국내 ODA 산림협력사업 평가 연구 - 인도네시아 룸핀양묘장 사업을 대상으로 -)

  • Lee, Hyun-Jung;Kim, Whee-Moon;Kim, Kyeong-Tae;Kim, Young;Choi, Jae-Yong;Song, Won-Kyong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.24 no.2
    • /
    • pp.19-37
    • /
    • 2021
  • It is essential that the evaluation of official development assistance (ODA) projects is conducted based on empirical research for the performance and improvement of the project. This study intended to quantitatively figure out the actual status and performance of ODA projects. The performance of the Rumpin Seed Source and Nursery Center project implemented by the KOICA was evaluated in items of relevance, efficiency, effectiveness, impact, sustainability, which are OECD Development Assistance Committee(DAC) evaluation criteria. From August 26, 2019 to August 29, 2019, a survey was conducted on 50 visitors and 54 stakeholders of the Rumpin Seed Source and Nursery Center. Through on-site survey, problems in the donation project and operation in Indonesia were identified and measures for improvement was grasped. As a result of the study, the value scored by OECD DAC evaluation criteria of the Rumpin Seed Source and Nursery Center project based on the Economic Development Cooperation Fund(EDCF) evaluation grade was evaluated as a very successful class in all items. The average score of the recognition question was 4.08 points for visitors and 4.08 points for stakeholders, and the average score for the satisfaction question was 4.37 points for visitors and 4.11 points for stakeholders, which were high overall in both groups. The main factor that affects the project awareness of the visitors was the fact that the Rumpin Seed Source and Nursery Center was created based on Korean technology, and it was confirmed that Indonesia's own items related to similar projects had a great influence on the project satisfaction. In the case of stakeholders, project support in Korea affected their recognition, and it was found that relevance, efficiency, effectiveness items had the greatest impact on the level of project satisfaction of stakeholders derived from the DAC individual evaluation results. Efforts are required to increase the main factors by reflecting the results of each item and to preserve and maintain the project. This study is significant in determining the performance of the ODA project based on empirical data, and it is believed that it can be used as basic data for supplementing and strengthening the project in the future.

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

Critical Review about the Character of Communication among Participating Stakeholders in the Improving Alley Landscapes in Residential Neighborhoods Project (주거지골목길 경관개선사업에서 참여 이해관계자의 의사소통 특성)

  • Kim, Yun-Geum;Lee, Ai-Ran
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.2
    • /
    • pp.25-36
    • /
    • 2016
  • This paper discusses the character of communication among participating stakeholders in the Improving Alley Landscapes in Residential Neighborhoods project. The participation of diverse stakeholders in conventional urban redevelopment is considered to delay and complicate the progress of a project. However, in urban regeneration, a field-oriented operating system and collaboration between diverse stakeholders is considered critical to building a sustainable community. A stakeholder is defined as "a person or organization that can influence decision-making or be influenced by it." This paper uses a case study to examine what types of stakeholders participate and what communicative processes and ideas are shared among them. Six neighborhoods were selected out of a total of 26 of Seoul's 2014 Improving Alley Landscapes project. This research was developed through interviews and a review of the literature. The character of communication among stakeholders in the case study is as follows. Firstly, the administration initiated the project but did not show leadership. This was caused by a gap in understanding about the project between city and borough administrations, Further, the city administration lacked experience with projects that placed an emphasis on fieldwork. Tongjand and Banjang, at ancillary institutions, acted as spokespersons and helped people in the community to understand the administrative process. However, because they led communication and used personal relationships to ensure they communicated effectively, the communication process had limits from the perspective of democratic process. Diverse stakeholders expressed their opinions in the public sphere and communicated about them using diverse media. Finally, experts produced the output, facilitated communication, and mediated in conflicts. Because new experts acted as facilitators and mediators, there was a great deal of trial and error. This project has particular significance: Seoul's city government deals with urban space rather than parks and green space, which are limited by boundaries; and whether "green" can be used for urban renovation was tested by several landscape architects, who sought to identify a new role in urban renovation, namely, the role of landscape and landscape architecture. However, the project has some limitations, including an insufficiently detailed project plan, a lack of common understanding among stakeholders, and a short timeframe. A number of stakeholders overcame these limitations to a certain degree. Officials of the Borough and the Dong managed the project and resolved civil complaints. Experts provided special information, and contributed to the design and construction of improvements.

3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique (파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링)

  • Tanoli, Waqas Arshad;Raza, Hassnain;Lee, Seung-Soo;Park, Sang-Il;Seo, Jong-won
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

Business Process Model for Urban Regeneration Project using BPMN Modeling Method (BPMN 모델링 방식을 활용한 도시환경정비사업 업무프로세스 모델)

  • Kim, Jae-Wook;Ryu, Han-Kuk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.41-50
    • /
    • 2010
  • From 2000s, the development to improve space use of urban area has been requested because of unorganized urban development in 1960~70s. For this reason Urban Redevelopment projects have been changed to urban regeneration project based on the renewed law. Recent urban regeneration Projects are bigger and more complex than ever. These kinds of projects need good communication between projects stakeholders, however there are problems in processing project for the lack of standardized business process. The purpose of this study is to provide common business process of urban regeneration projects for stakeholders to improve understanding project business process through analyzing association way of urban regeneration project and modeling business process by BPMN (Business Process Modeling Notation) method. And also it is expected to improve communication between stakeholders and to shorten project time through prompting project participation with the proposed business process.

Path-Analysis for Minimize a Conflict on Urban Regeneration Project (도시재생사업의 갈등 최소화를 위한 경로분석)

  • Kim, Ka-Ram;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.181-184
    • /
    • 2011
  • The earlier studies which are related to conflict management for urban regeneration project were based on limited case-studies on a specific phase. In addition, those studies did not considered a multidisciplinary approach for critical factor of conflict occurrence. In this reason, to establish a practical management or a policy is limited. In this paper, 'Good communication and information sharing' and 'Cooperativeness of stakeholders on project' are defined by critical factors for minimization of conflict between stakeholders. Furthermore we analysis the influence of those factors to minimization of conflict using path-analysis. This paper contributes to increase the efficiency of conflict management through understanding influence of each factors.

  • PDF

A Preliminary Study of the evaluating and improving WLCM for construction project based on BIM (BIM기반 프로젝트의 WLCM (Whole Life-Cycle Management) 적용모델 개발을 위한 기초연구)

  • Lee, Geun-Ho;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.13-14
    • /
    • 2011
  • The main purpose of this research is to propose standardization of construction components design with BIM and to develop WLCM Framework and Application System for supply chain management on interaction of stakeholders based on proposed standard component. To accomplish main purpose of this research, we planned three years period, in first year, we will develop model for building lifecycle based on BIM, and this model can give the chance of collaboration with stakeholders of building project. In second year, we will develop WLCM system with model, and to improve performance of application model/system. This study can contribute on reduction of whole lifecycle cost, with preventing omission of factors on cost reduction possibility, develop concurrent engineering framework for construction stakeholders with proposed BIM.

  • PDF

Contaminated Land: A Site Auditor's Perspective\ulcorner

  • Ross McFarland
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.09a
    • /
    • pp.63-66
    • /
    • 2002
  • Developers have, for some time now, recognised the benefits of acquiring "brownfields" sites for future urban development. The term “brownfield” generally refers to sites that have been previously occupied and in most cases this occupation has been for industrial usage. A key issue that developers face when considering the acquisition of a former industrial site is contamination and the costs associated with remediating the land to a level that renders the site suitable for its proposed use. Understanding all of the issues and implications associated with the remediation of contaminated land can be quite daunting. The process of remediation brings together a number of stakeholders that all have some influence on the outcome of the works. The stakeholders include the vendor, the purchaser, the regulatory authorities i.e. EPA and council, the Site Auditor and local residents. Careful planning and negotiation with the above stakeholders should be considered before committing to any remediation project.n project.

  • PDF

Delays and its Analysis: Indian Residential Construction Projects

  • Metha, Rakesh L.;Gaikwad, Suraj V.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.4
    • /
    • pp.20-28
    • /
    • 2017
  • In almost every construction project, delay is an inevitable yet controllable phenomenon. The Indian construction industry encounters an enormous amount of delays in projects. Delay affects both time and money in the forms of schedule and cost overruns, respectively. Due to impressive and dynamic growth in the Indian construction sector, planned efforts are essential to limit these undesirable delays. On account of the surge in the rate of residential building construction, the task of identification and analysis of the delays in residential projects in India has been attempted by the authors. A questionnaire survey was conducted involving 100 stakeholders. Further analysis included an Importance Index to rank the identified delays, Principle Component Analysis for advanced statistical analysis, and Correlation Analysis to check the extent of agreement amongst stakeholders. Conclusions drawn with reference to the analysed data eventually reflected finance-related issues, as well as labour related problems as the dominating causes of delays. The aim of the research is to provide insight to the construction stakeholders and researchers, on an international scale, with the obtained results.