Prediction of Fragmentation Impact Range of Forest Development Analyzing the Pattern of Landscape Indexes (경관지수 패턴 분석을 이용한 산지개발사업의 산림파편화 영향범위 예측)

  • Ji, Seung-yong;Choi, Jaeyong;Lee, Sang-hyuk;Lee, Peter Sang-Hoon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.19 no.2
    • /
    • pp.109-119
    • /
    • 2016
  • In South Korea the need of sustainably managing development on forest lands has required to develop a new approach to estimating environmental impacts on forest surrounding development sites in a scientific manner. As for forest-related development, two types of development were selected: golf courses and industrial complexes. Using Fragstats 4.2, the fragmentation effects and patterns of each type by forest area within project sites and buffer zones ranging from the outside of project sites up to 2,000 meters were analyzed. As a result, golf courses were strongly related to a group of fragmentation indexes: CA, NP, PD, TE, LSI, TCA, NDCA and CONNECT, whereas industrial complexes were associated with CA, NP, PD, TE, LSI and CONNECT. Among them, NP, LSI, TCA and NDCA of golf courses were considered as representative indexes reflecting the average impact ranges of each sub-group by forest area, and focussing on the size of core areas. In the case of industrial complexes, PD, TE and LSI were the representatives, vulnerable to the composition of given landscape. For two case studies, one for golf courses and the other for industrial complexes, they showed there existed a difference between the average of a group and the individual results. Therefore, to minimize the variations in impact range within a group, it is needed to analyze more individual cases. This study proved there was a distinction between project types in terms of the range of environmental impact. To effectively and comprehensively manage forest development, further research on analyzing other development types related to forests with more cases is needed.

A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.

The Characteristics of Gwanghwamun reconstruction in the 1960's (1960년대 광화문 중건과정의 특성)

  • Kang, Nan-hyoung;Song, In-Ho
    • Journal of architectural history
    • /
    • v.24 no.6
    • /
    • pp.45-55
    • /
    • 2015
  • After the Korean war, two major attempts were made to reconstruct Gwanghwamun Gate as an important part of Korea's lost cultural heritage. In December 2006, the Korean government replaced the concrete gate with a wooden one, yet traces of the attempts made in the 1960s to transform Gwanghwamun Gate and the main road remain to this day. At the time, the Third Republic of Korea, sought to legitimize itself in the name of modernity, and went on to modernize the architecture and urban landscape of Seoul. The location and design selected for the rebuilt Gwanghwamun illustrated the symbolic relationship between historic heritage and urban development. The reconstruction of the gate began as part of the Third Republic's project to restore the Central Administration Building and culminated in the transformation of the main road in front of the gate. By reconstructing the traditional gate using concrete, the military government intended to convey the message that we could inherit our proud tradition using modern materials, and that we should actively adopt the new technologies of the modern era. This study begins with the premise that the Gwanghwamun reconstruction project of 1968 represents the application of new technological thinking to Korea's architectural style, and has two objectives. The first is to summarize the reconstruction process and method using the records and drawings from the 1968 project, which was then under the leadership of architect Kang Bong-jin. The second is to analyze the characteristics of the architectural style and structure of the reconstructed Gwanghwamun so as to reinterpret the relationship between Korean tradition and modern technology.

Introduction of KEPCO's distribution class SFCL fabricated for verification test (실증시험용 배전급 초전도 한류기의 특성 평가 및 운전 시험)

  • Yim, Seong-Woo;Park, Chung-Ryul;Yu, Seung-Duck;Kim, Hye-Rim;Hyun, Ok-Bae;Park, Kwon-Bae;Sim, Jung-Wook;Lee, Kyoung-Ho;Oh, Ill-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.294_295
    • /
    • 2009
  • Superconducting fault current limiter (SFCL) is an power device of a novel concept. While SFCLs generate no ohmic loss during the operation carrying normal currents, they can limit fault currents very fast making large impedance by their quench characteristics. In 2006, KEPCO has developed a distribution class hybrid type SFCL by a collaborative research project with LS industrial systems. The SFCL has merits in practical and economical points of view. In the SFCL, the superconductor just plays a role of a fault detector and the current limiting is completed by the other current limiting element made of normal metals throu호 the line commutation. As a result, the required amounts of superconductors can be reduced considerably. Consequently, the hybrid SFCL can be fabricated with small size and cost, maintaining perfect current limiting performance. Currently, KEPCO is carrying out a research project at Gochang power test center for the purpose of the verification test of the 22.9 kV/ 630 A class SFCL for the practical application in real grid. Through the project, a long term operational test and fault current test will be done. In this paper, the back ground of development and installation of the SFCL will be explained and the operation plan of the SFCL for the verification test is also introduced.

  • PDF

A study about determination of preliminary design & minimum reinforcement ratios

  • KOC, Varol;EMIROGLU, Yusuf
    • Computers and Concrete
    • /
    • v.17 no.5
    • /
    • pp.673-692
    • /
    • 2016
  • In the standards, minimum reinforcement ratios are presented as the least reinforcement ratios that bearing elements should have in a way to include all systems and in general. However, naturally these general minimum ratios might be presented as being lower than the normally required reinforcement ratios by criteria such as system size, bearing system arrangement, section situation and distributions of the elements and earthquake effect. In this case, minimum reinforcement ratios may remain as meaningless restrictions. Then grouping the criterion that might affect reinforcement ratios according to certain parameters and creating minimum reinforcement ratios regarding preliminary design will provide ease and safety during the project designing. Moreover, it will enable fast and simple examinations in the beginning of project control and evaluation process. By means of the data which could be defined as "preliminary design & minimum reinforcement ratios", a more realistic and safe restriction compared to general minimum reinforcement ratios could be presented. As a result of numerous comprehensive studies, reinforcement ratios to include all certain systems might be obtained. Today, thanks to the development level of finite elements programs which can make reinforced concrete modelling, with the studies that are impossible to carry out beforehand, this deficiency in the minimum reinforcement ratios in the standarts may at least be partially made up with the advisory regulation of preliminary design & minimum reinforcement ratios. As the structure of the system to be examined and the diversity of the parameters range from the specific to the general, preliminary design & minimum reinforcement ratios will approximate to general minimum reinforcement ratios in real terms. By focusing on a more specific system structure and diversity of the parameters, preliminary design and even design reinforcement ratios will be approximated. In this preliminary study, a route between these two extremes was attempted to be followed. Today, it is possible to determine suggested practical ratios for project designs through carrying out numerous studies.

Economic Order Quantity(EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard Availability (일일 수요량 변동성과 가용야적면적을 고려한 건설 자재의 경제적주문량(EOQ) 산정 프로세스)

  • Yun, Jung-Sook;Yu, Jung-Ho;Kim, Chang-Duck
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.33-42
    • /
    • 2011
  • Part of material and inventory management is one of important factor for business interests. But importance of material and inventory management in domestic construction project has been relatively devalued. The existing study of inventory has been studied with limited individual factor about inventory management. Therefore construction material management needs improvement via an accurate prediction with whole and systematic process viewpoint. and existing theory of material and inventory introduction to construction from manufacturing needs reflecting characteristics about construction project. This paper suggests material management process for economic material management. This paper to make a unit curtain wall of case construction project comparison between total cost of existing material management process and total cost of economic order quantity of proposal material management process To verify usefulness of order point and order quantity determination process.

Interface Management Practices for Minimizing Design Change - Focusing on the Case Study - (설계간섭 최소화를 위한 인터페이스 관리방안 - 사례현장 적용 내용을 중심으로 -)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.22-29
    • /
    • 2013
  • As construction projects are getting larger, more complex and specialized, the size and scale of the structures are increasing and large-scale projects with multiple participants involved have continuously been ordered. Due to the nature of a large-scale construction project, when there are interferences and conflicts in process, schedule and area among project participants, the project requires more time and efforts to resolve the issues as it progresses further. This study suggests the interface management model that is time-saving and physically beneficial in solving interface issues based on case study. This study provides a practical management model including the organization of interface consultative group, checklist preparation, LIST management and PMIS application, which will be useful for the construction sites seeking effective know-how to manage design interferences and changes.

Developing a Real-time Cashflow Management System for National R&D Management (국가 연구 개발 프로젝트 실시간 자금 관리 시스템 개발에 관한 연구)

  • Han, Seung-Youp;Lee, Hyejung;Lee, Jungwoo
    • Journal of Information Technology Services
    • /
    • v.13 no.3
    • /
    • pp.343-357
    • /
    • 2014
  • As science and technology infiltrates every aspects of modern society in terms of economic and social growth and development, funding for research and development (R&D) is growing rapidly. Republic of Korea is not an exception in this trend and the R&D funding in Korea has been grown about 10% every year, recently. However, as the scope and size of funding grows exponentially, need for monitoring and managing these R&D projects becoming more and more imminent. Though different types of project management systems were developed by a variety of agencies and departments and used in monitoring and managing, these systems were developed as standalone silo type systems. These systems are not connected to each other while the same researchers may involved in different projects across agencies and department. Also, these management systems are not linked to the banking systems in which real transactions of funding occurs, such as cost reimbursement and financial audit of each R&D accounts. Historically, a few fraud and malappropriation cases were found and indicted. However, as the number of these incidents grows along with the growth of R&D funding, a large scale integration/linking of project management systems and banking systems. Realizing the importance of systems integration among agencies as well as with the banking systems, situational requirements analyses were conducted concerning the current state of R&D management system. As a results, a Real-time Case Management System (RCMS) was proposed as a solution to current problems. In this paper, the collected systems requirements were documents with analyses of the situation, the architecture of the integrated systems with more user-friendly technological alternatives. This large scale linkage requires interface standardization as well as modularization of interfaces. Proposed systems architecture is introduced here with technical details of Jex Framework used,, followed by resulting technical and economic performance of the Realtime Cashflow Management System (RCMS).

INTRODUCTION OF THE G-7 PROJECT: Integrated System of Water Quality Management (G-7 과제에 대한 소개 : 수질관리를 위한 통합 시스템)

  • Kim, Kye-Hyun;Kim, Eui-Hong;Lee, Hong-Keun;Lee, In-Seon;Ryu, Joong-Hi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.1 no.2 s.2
    • /
    • pp.143-152
    • /
    • 1993
  • A long-term water quality study has been initiated by the Korean Ministry of Environment(MOE) - The G-7 Project--in cooperation with two national research institutes, an University research tn and a consulting firm. This study includes the development of computer software for total water quality management system, so called ISWQM (Integrated System of Water Quality Management). ISWQM includes four major components: a GIS database; two artificial intelligence (AI) based expert systems to estimate pollutant loadings and to provide cost-effective wastewater treatment system for small and medium size urban areas; and computer programs to integrate the database and expert systems. ISWQM is to provide user-friendly Decision Support System (DSS) for water quality planners. A GIS was used to create spatial database which stores all the necessary data to n DSS. GIS was also used to integrate the four components of ISWQM from data creation to decision making through Graphic User Interface (GUI). The results from the first phase of this study showed that GIS would provide an effective tool to build DSS using expert system.

  • PDF

Implementation of Z-Factor Statistics for Performance Evaluation of Quality Innovation in the High Throughput Process (High Throughput 프로세스에서 품질혁신의 성능평가를 위한 Z-Factor의 적용방안)

  • Choi, Sung-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.1
    • /
    • pp.293-301
    • /
    • 2013
  • The purpose of this study is to introduce the limit of previously used six sigma quality process evaluation metrics, $Z_{st}$ and $P_{pk}$, and a solution to overcome this drawback by using a metric based on performance evaluation of Z-factor quality innovation. Case analysis on projects from national six sigma contest from 2011 to 2012 is performed and literature review on new drug development HTS (High Throughput Screening) is used to propose innovative performance evaluation metrics. This research shows that experimental study on six sigma evaluation metric, $Z_{st}$ and $P_{pk}$, have no significance difference between industrial type (Manufacturing, Semi-Public Institute, Public Institute) and CTQ type (Product Technology Type CTQ, Process Technology Type CTQ). Following discovery characterize this quality improvement as fixed target type project. As newly developed moving target type of quality innovation performance metric Z-Factor is used for evaluating experimental study, hypothetical analysis suggests that $Z_{st}$ and $P_{pk}$ share different relationship or even show reciprocal relationship. Constraints of the study are relatively small sample size of only 37 projects from past 2 years and conflict on having interview and communication with six sigma quality practitioner for qualitative experimental study. Both moving target type six sigma innovation project and fixed target type improvement project or quality circle enables efficient ways for a better understanding and quality practitioner use by applying quality innovation performance metric. Downside of fixed target type quality performance evaluation metric, $Z_{st}$ and $P_{pk}$, is presented through experimental study. In contrast, advantage of this study is that high throughput requiring product technology, process technology and quantum leap typed innovation effect is evaluated based on precision and accuracy and Z-Factor that enables relative comparison between enterprises is proposed and implemented.