• 제목/요약/키워드: Project Schedule Management

검색결과 497건 처리시간 0.026초

An Empirical Study about Assessment of the JIT System: on korean semi-production firm

  • Lee, Eung-Kweon
    • 통상정보연구
    • /
    • 제7권2호
    • /
    • pp.75-94
    • /
    • 2005
  • This study is focused on evaluating the computer-integrated just-in-time (CI-JIT) production system of a semi-conductor manufacturing firm in Korea. Approaching the mid-1980s, the emphasis was on low price, low-cost operations, and quality, especially in USA. American companies have shifted output to low-wage countries like the Philippines, Korea, Japan, Malaysia and allied countries that can make quality products at low prices. Korea and other Asian countries forego short-term profits to gain a solid foothold in a product market, recognizing that larger market share leads to lower cost and higher profit in the long run. They bring manufacturers and suppliers together to improve material management and operation management, using project teams that investigate topics, such as Just-In-Time(JIT)manufacturing, among others. The "Kanban" word means "card" in Japanese, and is used to indicate the desired final delivery schedule. The operation for a particular item produced is scheduled for a specific time. The same process is extended to the external suppliers. More recently, the cards are gradually being replaced by electronic procedures that follow the same concept. Its capacity must be capable of handling the various transactions required by the JIT coverage as well as some allowances for expanded applications.

  • PDF

Cutting-edge Technologies to Achieve a Higher Level of Modular Construction - Literature Review

  • Lee, Seungtaek;Choi, Jin Ouk;Song, Seung
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.536-542
    • /
    • 2022
  • Cost overruns, schedule delays, and a shortage of skilled labor are common problems the construction industry is currently experiencing. Modularization and standardization strategies have the potential to resolve the various problems mentioned above and have been applied for various construction applications for a long time. However, the level of modularization remains low, and modular construction projects have not been getting the full benefits. Thus, this review investigated the cutting-edge technologies currently being utilized to develop the modular construction field. For this paper, qualified research papers were identified using predetermined keywords from previous related research papers. Identified literature was then filtered and analyzed. According to the included reviews, several technologies are being developed for modular construction. For example, automated design and monitoring systems for modularization were developed. In addition, research labs are utilizing robotic arms for modular construction to achieve a high level of completion in the construction industry, as is seen in the manufacturing industry. Despite these efforts, more research and development are necessary because some automation technologies still require manual activities. Thus, there is great potential for further development of modularization techniques, and further research is recommended to achieve high levels of modularization.

  • PDF

Architecture for Integrated Real-Time Health Monitoring using Wireless/Mobile Devices

  • Ryoo, Boong Yeol;Choi, Kunhee
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.336-338
    • /
    • 2015
  • This research is to propose an applicable framework for real-time health surveillance and safety monitoring at construction sites. First this study aims at finding (1) a framework for health surveillance that is likely to benefit employers and employees in the industry, (2) a valid way to identify factors or conditions with potential health concerns that can occur under particular work conditions, (3) An effective way to apply wireless/mobile sensors to construction workers using real-time/live data transmission methods, and (4) A relationship between a worker's vital signs and job site environment. Biosensors for physiological response and devices for weather/work related data are to collect real-time data. Relationships between jobs and physiological responses are analyzed and factors that touched particularly contributing to certain responses are identified. When data are incorporated with tasks, factors affecting tasks can be identified to estimate the magnitude of the factors. By comparing work and normal responses possible precautionary actions can be considered. In addition, the study would be lead to improving (1) trade-specific dynamic work schedules for workers which would be based on various factors affecting worker health level and (2) reevaluating worker productivity with health status and work schedule, thereby seeking ways to maximize worker productivity. Through a study, the paper presents expected benefits of implementing health monitoring.

  • PDF

Measuring productivity improvement by Machine Guidance through work sampling in earthwork

  • Eom, Julee;Kang, Youngcheol;Lee, Yongsei;Choi, Pyungho
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.409-416
    • /
    • 2020
  • This paper proposes a study measuring productivity improvement by using a type of technology called "Machine Guidance" through work sampling in earthwork. Earthwork is the activity typically on the critical path, indicating that productivity for the activity is critical for managing schedule on time. Thanks to the development of sensing and information system technologies, productivity for earthwork has been improved. While there have been many studies investigating the application of a certain type of technology to earthwork, few studies have measured the productivity improvement and presented how the technology leads to productivity improvement. Based on the thorough literature review, it is hypothesized that Machine Guidance contributes to improving productivity of earthwork by reducing indirect workhours spent for information waiting and inspection. In addition to the literature review, this paper presents a research model to test the hypothesis by using the work sampling technique. By proving and quantifying the productivity improvement from the technology use, this study can help practitioners justify the investment for technology use, which will contribute to the deployment of technology and more effective execution of earthwork.

  • PDF

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

외국인 건설 근로자 현황 및 개선방안 (Current Status and Improvement Plan for Foreign Construction Laborer)

  • 박희성
    • 한국콘텐츠학회논문지
    • /
    • 제15권9호
    • /
    • pp.555-561
    • /
    • 2015
  • 건설 산업은 인력 중심형 산업으로 건설현장의 기능 인력이 공사의 품질, 공기, 비용 등 생산성에 큰 영향을 미친다. 그러나 현재 건설 산업의 상황은 건설현장에서 건설기능 인력의 부족현상을 발생하고 있다. 이에 기존 건설기능 인력의 노령화가 가속되고 신규 기능 인력이 유입되지 않음으로 인해 건설 산업의 기능인력 부족현상과 기능 수준저하가 발생하고 있는 실정이다. 이를 해결하기 위해 외국인 기능 인력을 활용하는 건설 현장이 늘어나고 있다. 본 연구는 현재 건설 기능 인력과 관련된 문제점에 대한 현황을 파악하고 그 대안을 제시하기 위하여 14개 현장 43명의 현장 관리자를 대상으로 설문조사를 수행하였다. 그 결과 외국인 기능 인력은 목공과 철근공이 많았으며, 기능 수준은 낮은 것으로 나타났다. 외국인 기능 인력의 가장 큰 문제점은 언어 소통과 낮은 기능 수준이다. 그리고 노무 생산성과 안전사고 발생률도 내국인 기능 인력에 비해서 높은 것으로 나타났다. 따라서 본 논문은 응답자 의견을 근거로 기능 훈련, 언어 교육, 다문화 교육 등이 문제점 개선을 위해서 효과적이라고 제안하였다.

클라이언트/서버 시스템 환경에 기초한 정보시스템 구축에 관한 사례연구-P 대학의 종합정보시스템을 중심으로- (A Case Study on the Development of Information Systems based on the Client/Server System)

  • 한용호;류영태
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제10권1호
    • /
    • pp.27-50
    • /
    • 2001
  • The purpose of this study was to examine some of the most important factors for the development of information systems with today's fast-paced, ever-changing, and exciting information system environment. Especially, it was focused to investigate current information technology related to develop information systems, to find some important problems during the development process, and to suggest solutions for the problems. Case research methodology was used because a natural setting was needed and a focus was on contemporary events for this study. Similarly, research phenomena was not supported by a strong theoretical base. The case was the development of an integrated information systems in a specific university. Multiple-case designs were desirable, but single-case study was used because of limitations of site selection. Multiple data collection methods were employed in this study such as documentation, interviews, and direct observation. Some major problems were found during the system development. First, the schedule to complete a project was delayed over six months. Second, the system did not ensure to align organizational goals and information systems goals based on BPR (Business Process Reengineering). Third, there was a difficulty in evaluating request for proposal (RPR) returns and choosing a vendor. Finally, information technology is changing too fast. So, it was very difficult to get the transparency of new technology The study has suggested a few solutions: top management support, matching If planning with business planning, complete project plan and control, user participation, and training Finally, joint application development (JAD) is strongly recommended, which is a workshop that unites management, IT specialists, and knowledge workers to define and specify the logical requirements and technical alternatives for a proposed system.

  • PDF

몬테카를로 시뮬레이션과 선형계획법을 이용한 최적의 일정 및 비용 산정방법 (A method of Calculating Optimal Duration and Cost Using Monte Carlo Simulation and Linear Programming)

  • 김용득;이영대
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.210-215
    • /
    • 2004
  • 프로젝트의 계획단계에서 명확한 업무의 정의와 업무간의 상관관계, 자원계획 및 일정계획이 수행되지 않으면, 공사의 진행 시에 많은 변경과 일정 $\cdot$ 비용 상의 문제를 가져올 수 있다. 그래서 본 연구에서는 사례연구를 중심으로 프로젝트 계획단계에서 최적의 소요공기 산정을 위해서 몬테카를로 시뮬레이션과 선형계획법을 적용한 결과, 다음과 같은 결론을 얻었다. 몬테카를로 시뮬레이션을 사용함으로써 각각의 활동이 독립적이고, 프로젝트 소요시간에 대해서 정규분포를 따른다는 가정의 제약조건을 해소함으로 보다 신뢰한 만한 일정 추정이 가능하였으며, 주 경로와 주 경로에 근접한 경로에 신뢰할 만한 일정편차를 계산할 수 있었다. 또한, 선형계획법을 동해서 최적의 소요비용 산정이 가능하였으며, 프로젝트 목표소요공기의 변동에 따른 최적의 목표공기를 산정할 수 있었다.

  • PDF

이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 - (Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM)

  • 노주희;박문서;이현수
    • 한국건설관리학회논문집
    • /
    • 제21권5호
    • /
    • pp.11-19
    • /
    • 2020
  • 시공 현장 일단위의 진도 관리는 프로젝트 전체의 일정 관리와 성공적인 건설 프로젝트 완료에 상당한 영향을 미친다. 그러나 현재의 현장 진도 관리는 작업 담당자에 의하여 수기로 작성되기 때문에 객관적 입장의 유지가 어렵고, 일과 후 추가업무로 작성되어 내용의 누락 등 오류가 발생하는 경우가 있다. 인적 오류로 인한 잘못된 기록 작성의 문제를 해결하기 위하여 기존 연구들은 객체 인식 기반 현황의 시각화 또는 자동 BIM 데이터 수정 기술을 개발하였다. 그러나 특정 장비의 사용 또는 고정된 위치에서 장비사용을 전제로 하는 방법적 한계로 인하여 건물 시공 현장 전체를 파악하는 데에는 제약이 있다. 이러한 한계를 극복하기 위하여 본 연구는 작업자가 휴대하는 스마트기기를 활용하여 촬영한 사진의 객체 인식 기술과 WIFI 기반의 실내 사용자의 측위 기술을 활용하여 추출된 정보를 BIM 데이터의 속성으로 반영하고 즉각적인 현황 파악과 향후 지속적 데이터 활용이 가능한 방법을 제안한다. 실제 시공 현장 관리에 적용 가능한 방법과 기술의 성능을 확인하였고, 기존 개발된 기술 대비 실용도가 높아 건설 현장 관리의 신속화와 정보 작성과 처리의 정밀화에 이바지할 것으로 기대된다.

자원기준 상대가치를 이용한 정신과의 간호활동비용 산정 (Estimation of Psychiatric Nursing Costs by Using the Resource-Based Relative Value Scale(RBRVS))

  • 김은경;권영대;김윤
    • 대한간호학회지
    • /
    • 제30권6호
    • /
    • pp.1580-1591
    • /
    • 2000
  • This study was conducted to assess the amount of nursing services for psychiatric inpatients and to estimate psychiatric nursing costs by using the RBRVS. Full details of medical services, including physician and nursing services, for psychiatric inpatients were surveyed and data of general characteristics of hospitals and patients were also collected. The cost of nursing activities was estimated by the multiple conversion factor which was drawn from the Korean RBRVS Development Project to the RBRVS score of each nursing activities, which was drawn from the results of Korean Nurses Association (KNA)'s projects about nursing RBRVS development and cost of nursing activities. The data about 89 inpatients from 3 general hospitals with psychiatric departments were analyzed. The total cost of nursing activities for each patient per admission day was from KRW 22,185 to KRW 27,954 by hospital, and KRW 25,220 in average. The percent of nursing cost to the total cost of medical services was from 36% to 48% by characteristics of patients and 41.4% in average. The cost of nursing activities estimated in this study was between the existing NHI fee schedule and the one suggested by KNA. It is considered as appropriate and acceptable level compared to the total amount of medical services. In the process of KNA's activities to get nursing fee in NHI fee schedule, results of additional studies to estimate the cost of nursing activities balanced with total cost of medical services in every departments should be found and utilized.

  • PDF