This study is focused on evaluating the computer-integrated just-in-time (CI-JIT) production system of a semi-conductor manufacturing firm in Korea. Approaching the mid-1980s, the emphasis was on low price, low-cost operations, and quality, especially in USA. American companies have shifted output to low-wage countries like the Philippines, Korea, Japan, Malaysia and allied countries that can make quality products at low prices. Korea and other Asian countries forego short-term profits to gain a solid foothold in a product market, recognizing that larger market share leads to lower cost and higher profit in the long run. They bring manufacturers and suppliers together to improve material management and operation management, using project teams that investigate topics, such as Just-In-Time(JIT)manufacturing, among others. The "Kanban" word means "card" in Japanese, and is used to indicate the desired final delivery schedule. The operation for a particular item produced is scheduled for a specific time. The same process is extended to the external suppliers. More recently, the cards are gradually being replaced by electronic procedures that follow the same concept. Its capacity must be capable of handling the various transactions required by the JIT coverage as well as some allowances for expanded applications.
The 9th International Conference on Construction Engineering and Project Management
/
pp.536-542
/
2022
Cost overruns, schedule delays, and a shortage of skilled labor are common problems the construction industry is currently experiencing. Modularization and standardization strategies have the potential to resolve the various problems mentioned above and have been applied for various construction applications for a long time. However, the level of modularization remains low, and modular construction projects have not been getting the full benefits. Thus, this review investigated the cutting-edge technologies currently being utilized to develop the modular construction field. For this paper, qualified research papers were identified using predetermined keywords from previous related research papers. Identified literature was then filtered and analyzed. According to the included reviews, several technologies are being developed for modular construction. For example, automated design and monitoring systems for modularization were developed. In addition, research labs are utilizing robotic arms for modular construction to achieve a high level of completion in the construction industry, as is seen in the manufacturing industry. Despite these efforts, more research and development are necessary because some automation technologies still require manual activities. Thus, there is great potential for further development of modularization techniques, and further research is recommended to achieve high levels of modularization.
The 6th International Conference on Construction Engineering and Project Management
/
pp.336-338
/
2015
This research is to propose an applicable framework for real-time health surveillance and safety monitoring at construction sites. First this study aims at finding (1) a framework for health surveillance that is likely to benefit employers and employees in the industry, (2) a valid way to identify factors or conditions with potential health concerns that can occur under particular work conditions, (3) An effective way to apply wireless/mobile sensors to construction workers using real-time/live data transmission methods, and (4) A relationship between a worker's vital signs and job site environment. Biosensors for physiological response and devices for weather/work related data are to collect real-time data. Relationships between jobs and physiological responses are analyzed and factors that touched particularly contributing to certain responses are identified. When data are incorporated with tasks, factors affecting tasks can be identified to estimate the magnitude of the factors. By comparing work and normal responses possible precautionary actions can be considered. In addition, the study would be lead to improving (1) trade-specific dynamic work schedules for workers which would be based on various factors affecting worker health level and (2) reevaluating worker productivity with health status and work schedule, thereby seeking ways to maximize worker productivity. Through a study, the paper presents expected benefits of implementing health monitoring.
The 8th International Conference on Construction Engineering and Project Management
/
pp.409-416
/
2020
This paper proposes a study measuring productivity improvement by using a type of technology called "Machine Guidance" through work sampling in earthwork. Earthwork is the activity typically on the critical path, indicating that productivity for the activity is critical for managing schedule on time. Thanks to the development of sensing and information system technologies, productivity for earthwork has been improved. While there have been many studies investigating the application of a certain type of technology to earthwork, few studies have measured the productivity improvement and presented how the technology leads to productivity improvement. Based on the thorough literature review, it is hypothesized that Machine Guidance contributes to improving productivity of earthwork by reducing indirect workhours spent for information waiting and inspection. In addition to the literature review, this paper presents a research model to test the hypothesis by using the work sampling technique. By proving and quantifying the productivity improvement from the technology use, this study can help practitioners justify the investment for technology use, which will contribute to the deployment of technology and more effective execution of earthwork.
The 5th International Conference on Construction Engineering and Project Management
/
pp.1-6
/
2013
Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.
건설 산업은 인력 중심형 산업으로 건설현장의 기능 인력이 공사의 품질, 공기, 비용 등 생산성에 큰 영향을 미친다. 그러나 현재 건설 산업의 상황은 건설현장에서 건설기능 인력의 부족현상을 발생하고 있다. 이에 기존 건설기능 인력의 노령화가 가속되고 신규 기능 인력이 유입되지 않음으로 인해 건설 산업의 기능인력 부족현상과 기능 수준저하가 발생하고 있는 실정이다. 이를 해결하기 위해 외국인 기능 인력을 활용하는 건설 현장이 늘어나고 있다. 본 연구는 현재 건설 기능 인력과 관련된 문제점에 대한 현황을 파악하고 그 대안을 제시하기 위하여 14개 현장 43명의 현장 관리자를 대상으로 설문조사를 수행하였다. 그 결과 외국인 기능 인력은 목공과 철근공이 많았으며, 기능 수준은 낮은 것으로 나타났다. 외국인 기능 인력의 가장 큰 문제점은 언어 소통과 낮은 기능 수준이다. 그리고 노무 생산성과 안전사고 발생률도 내국인 기능 인력에 비해서 높은 것으로 나타났다. 따라서 본 논문은 응답자 의견을 근거로 기능 훈련, 언어 교육, 다문화 교육 등이 문제점 개선을 위해서 효과적이라고 제안하였다.
The purpose of this study was to examine some of the most important factors for the development of information systems with today's fast-paced, ever-changing, and exciting information system environment. Especially, it was focused to investigate current information technology related to develop information systems, to find some important problems during the development process, and to suggest solutions for the problems. Case research methodology was used because a natural setting was needed and a focus was on contemporary events for this study. Similarly, research phenomena was not supported by a strong theoretical base. The case was the development of an integrated information systems in a specific university. Multiple-case designs were desirable, but single-case study was used because of limitations of site selection. Multiple data collection methods were employed in this study such as documentation, interviews, and direct observation. Some major problems were found during the system development. First, the schedule to complete a project was delayed over six months. Second, the system did not ensure to align organizational goals and information systems goals based on BPR (Business Process Reengineering). Third, there was a difficulty in evaluating request for proposal (RPR) returns and choosing a vendor. Finally, information technology is changing too fast. So, it was very difficult to get the transparency of new technology The study has suggested a few solutions: top management support, matching If planning with business planning, complete project plan and control, user participation, and training Finally, joint application development (JAD) is strongly recommended, which is a workshop that unites management, IT specialists, and knowledge workers to define and specify the logical requirements and technical alternatives for a proposed system.
프로젝트의 계획단계에서 명확한 업무의 정의와 업무간의 상관관계, 자원계획 및 일정계획이 수행되지 않으면, 공사의 진행 시에 많은 변경과 일정 $\cdot$ 비용 상의 문제를 가져올 수 있다. 그래서 본 연구에서는 사례연구를 중심으로 프로젝트 계획단계에서 최적의 소요공기 산정을 위해서 몬테카를로 시뮬레이션과 선형계획법을 적용한 결과, 다음과 같은 결론을 얻었다. 몬테카를로 시뮬레이션을 사용함으로써 각각의 활동이 독립적이고, 프로젝트 소요시간에 대해서 정규분포를 따른다는 가정의 제약조건을 해소함으로 보다 신뢰한 만한 일정 추정이 가능하였으며, 주 경로와 주 경로에 근접한 경로에 신뢰할 만한 일정편차를 계산할 수 있었다. 또한, 선형계획법을 동해서 최적의 소요비용 산정이 가능하였으며, 프로젝트 목표소요공기의 변동에 따른 최적의 목표공기를 산정할 수 있었다.
시공 현장 일단위의 진도 관리는 프로젝트 전체의 일정 관리와 성공적인 건설 프로젝트 완료에 상당한 영향을 미친다. 그러나 현재의 현장 진도 관리는 작업 담당자에 의하여 수기로 작성되기 때문에 객관적 입장의 유지가 어렵고, 일과 후 추가업무로 작성되어 내용의 누락 등 오류가 발생하는 경우가 있다. 인적 오류로 인한 잘못된 기록 작성의 문제를 해결하기 위하여 기존 연구들은 객체 인식 기반 현황의 시각화 또는 자동 BIM 데이터 수정 기술을 개발하였다. 그러나 특정 장비의 사용 또는 고정된 위치에서 장비사용을 전제로 하는 방법적 한계로 인하여 건물 시공 현장 전체를 파악하는 데에는 제약이 있다. 이러한 한계를 극복하기 위하여 본 연구는 작업자가 휴대하는 스마트기기를 활용하여 촬영한 사진의 객체 인식 기술과 WIFI 기반의 실내 사용자의 측위 기술을 활용하여 추출된 정보를 BIM 데이터의 속성으로 반영하고 즉각적인 현황 파악과 향후 지속적 데이터 활용이 가능한 방법을 제안한다. 실제 시공 현장 관리에 적용 가능한 방법과 기술의 성능을 확인하였고, 기존 개발된 기술 대비 실용도가 높아 건설 현장 관리의 신속화와 정보 작성과 처리의 정밀화에 이바지할 것으로 기대된다.
This study was conducted to assess the amount of nursing services for psychiatric inpatients and to estimate psychiatric nursing costs by using the RBRVS. Full details of medical services, including physician and nursing services, for psychiatric inpatients were surveyed and data of general characteristics of hospitals and patients were also collected. The cost of nursing activities was estimated by the multiple conversion factor which was drawn from the Korean RBRVS Development Project to the RBRVS score of each nursing activities, which was drawn from the results of Korean Nurses Association (KNA)'s projects about nursing RBRVS development and cost of nursing activities. The data about 89 inpatients from 3 general hospitals with psychiatric departments were analyzed. The total cost of nursing activities for each patient per admission day was from KRW 22,185 to KRW 27,954 by hospital, and KRW 25,220 in average. The percent of nursing cost to the total cost of medical services was from 36% to 48% by characteristics of patients and 41.4% in average. The cost of nursing activities estimated in this study was between the existing NHI fee schedule and the one suggested by KNA. It is considered as appropriate and acceptable level compared to the total amount of medical services. In the process of KNA's activities to get nursing fee in NHI fee schedule, results of additional studies to estimate the cost of nursing activities balanced with total cost of medical services in every departments should be found and utilized.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.