• Title/Summary/Keyword: Project Plan

Search Result 2,080, Processing Time 0.032 seconds

Improved Methods of Cost Sharing in Apartment Remodeling Projects (공동주택 리모델링 사업 분담금 산정의 문제점 및 개선방안)

  • Kim, Jeong-Won;Lee, Dong-Jin;Lee, Min-Joo;Lee, Ji-Hyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.184-185
    • /
    • 2019
  • The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.

  • PDF

A Study on the Improvement of the Management Plan of City Master Planning as ODA Project (ODA 사업으로서 도시 마스터플랜 수립 사업의운영방식 개선에 관한 연구)

  • Kim, Yong-Jin;Kim, Seong-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.4
    • /
    • pp.2799-2806
    • /
    • 2015
  • This study aims to find out the better management plan for city master plannning as an ODA to accomplish the economic effect. For this study, the "Hai Phong New Town Development Project" and the "Modification of Hue City's Master Plan" were studied. The result of the case study shows that there was difference between the two projects which was the status of following projects. While those two projects were highly acclaimed, only Hue project had several projects. This is because of the understanding degree on ODA project of participants, the distinct characteristics of the recipient country; Vietnamese local and central government, and the difference of each project's main purpose. And the result of FGI shows that to accomplish economic effects of master planning project as ODA, the enthusiastic approach to find out following project from the beginning step of the master planning, the experience of project manager on ODA, the close association with the recipient country, and the positive support from the Koica especially, the local office were crucial.

Analysis of the Performance and Change of Resident Consciousness of the Fishing Village Specialization Capacity Enhancement Project through Surveys - Focusing on the Comparative Analysis of Consciousness of Inland Water and Coastal Residents - (어촌특화 역량강화사업의 성과 및 주민의식 변화분석)

  • Yang, Min-Ho;Kim, Ki-Sung;Koh, Jin-Young
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.2
    • /
    • pp.19-31
    • /
    • 2021
  • The Ministry of Maritime Affairs and Fisheries has been promoting the 'Fishing Village Specialization Capacity Enhancement Project' to pursue sustainable development of villages such as income generation by using local tangible and intangible resources led by local residents at the village level since 2013. For the fishing village-Specialization capacity enhancement project, six training sessions (mainly in the village unit) are selected by the public offering method, and the project (income generating business, village development project, etc.) is developed for the selected village residents. It has a process of establishing a village project plan (a preliminary plan for village development or a sixth preliminary industrialization plan) based on the training of experts 5 times, practice or excursion 1 time). In this study, four villages in Gangwon-do fishing villages (two coastal villages and two inland water villages) were surveyed on the perception and satisfaction of fishing village development projects before and after training. The survey analysis was conducted by dividing the analysis of resident capacity and satisfaction into personal, interpersonal, and social dimensions. The survey was conducted by distributing a survey before and after training, and a 1:1 survey was conducted according to the residents' cognitive status. Based on the survey, factor analysis, reliability analysis, and analysis using the corresponding sample t-test showed an increase of 0.02 for Yangyang Mulchi fishing village, 0.11 for Samcheok Jangho fishing village, and 0.36 for Hongcheon River fishing industry, but Yanggu Jinmok fishing industry was -0.29, unlike other regions. As a result of this analysis, it has been empirically proven that provision of training projects through resident participation is a very important factor for the success of the fishing village project. Therefore, rather than fostering local leaders, training and community activities to strengthen personal capacities of residents participating in the project, it is necessary to operate the software business with a focus.

Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF

The Establishment of Train Operation Plan in Railway System (철도시스템의 운전계획 수립)

  • 이동근;고영호;권정원
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.929-936
    • /
    • 2002
  • This paper presents a Rotem's methodology for the establishment of train operation plan in Railway system. Train operation plan is the key prior plan to proceed the design of the civil and E&M relevant subsystem. But, due to the limitation of the environmental and project condition, common consensus to the key factors which make up the operation plan have not been accomplished. So, as a result of this comparative review for the general approaching method of train operation plan and application status of the major key factors being performed by Rotem, we will get the opportunities to improve the accuracy of the train operation plan.

  • PDF

Rural Village Development Itemized Study on the Importance Analysis and Improvement (농촌마을종합개발 항목별 중요도 분석 및 개선방안에 관한 연구 - 인제군 용대권역을 중심으로 -)

  • An, Chung-Ho;Lee, Joo-Hyung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.6
    • /
    • pp.9-17
    • /
    • 2012
  • In 1960's, Korea had concentrated on economic development, in the meantime the existing problem which is an avoiding rural settlement phenomenon such as a farming population decrease, an unstabel income, poor surroundings, etc. could intensify. And because of an exodus from agricultural area caused by industrialization and a fall of agricultural farm price as a result of domestic agricultural market opening in accordance with FTA, in 2004 Korean government excuted the integrated rural-village development plan as a measure to provide more support for agricultural villages. The integrated rural-village development plan means that inter-connected with villages which have potnetial and developed it as a unit of small-zone, also we can assume it a Down-up development type because residents participate and lead this plan directly. But, this plan made progress rapidly as a countmeasure of government so, it needs to evaluate for completed project area and make an improvement for a sustainable undertaking. Therefore, this study categorized project contents systematically into two parts of Hardware and Software, after that composed of 4 large-parts, 13 mid-parts and 43 small-parts from Inje-Yongdai zone which was designated for an integrated rural-village development plan in 2004. And a result of analysis for project contents priorities by hierarchy analysis method showed the Regional capability reinforcement is selected for the most important project content by 3 stakeholders who are specialists (514pts.), Korea Rural Community Corporation staffs (694pts.), local government officers (688pts.)

On the Plans of Gyeongju Seokguram Grotto Restoration Project (1961-1962) by Kim Chung Up (김중업의 「경주 석굴암 보수공사 설계」(1961-1962)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-hyung
    • Journal of architectural history
    • /
    • v.30 no.4
    • /
    • pp.41-52
    • /
    • 2021
  • This study examines the Gyeongju Seokguram Grotto restoration project (1961-1962) by architect Kim Chung Up (1922-1988) and introduces the documents he wrote at the time of planning. The study highlights Kim's Plan attempt to adopt Buckminster Fuller's idea of the Geodesic Dome, while inheriting the architect Pai Ki Hyung's previous design plan which was nullified. As Seokguram Grotto's water leak and deterioration issues have been brought up, the four-times survey was carried out by experts team between 1958 and 1960, under Ministry of Education's direction. Pai designed an initial restoration plan based on the survey's result, which was a double-dome structure with a concrete film on the outer periphery as a way to protect Seokguram Grotto in January 1961. However, as drawbacks, such as the heavy load of the concrete dome, and non-installation of entrance hall, have been indicated in the review process, the Cultural Properties Committee rejected the plan. Subsequently, Kim was appointed as the supervisor of the second restoration project. Kim drew up a process management schedule to be implemented from August 1961 to December 1963 and designed the conception plans for the second restoration design. This study analyzes Kim's Plan by examining sketches, site plans, floor plans, and sections. Kim planned to maintain the idea of the double-dome structure proposed by Pai while applying Buckminster Fuller's idea of the Geodesic Dome. Kim planned to lighten the dome structure by applying a steel-frame Geodesic Dome so that the dome structure could be supported by its own. The study is expected to reclaim the omitted parts from Seokguram Grotto's historical description and Kim's careers.

Implications of the Survey on Empty House Using Local Government Data: The Case of M okpo City in Jeollanamdo (지자체 자료를 활용한 빈집 실태조사에 따른 시사점: 전남 목포시 사례)

  • Jimin Chae
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.26 no.1
    • /
    • pp.40-54
    • /
    • 2023
  • The purpose of this study is to present implications using local government data, focusing on the occurrence of empty houses, one of the serious social problems emerging due to population extinction and aging. The subjects of the study were Mokpo-si, which has the highest percentage of empty houses in the country, and the spatial distribution status was identified by schematizing the status of empty houses by grade on a map through data from the local government's survey on empty houses. As a result of the survey on vacant houses, it was confirmed that 90% of empty houses in Mokpo City were included in the project district of the urban regeneration strategy plan underway in Mokpo City. Currently, the empty house maintenance project is difficult to proceed smoothly due to difficulties in purchasing empty houses and lack of budget for local governments, so in order for the project to proceed quickly, it is necessary to come up with a plan to promote the project in connection with the urban regeneration strategy plan in Mokpo.

A Consideration on the Approach of Urban Stream Landscape Restoration - The Case of the Chungkye Stream Restoration Project - (도시하천경관복원 접근방법에 관한 고찰- 청계천 복원사업을 사례로 -)

  • Shin Dong-Hoon;Lee Kyoo-Seock
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.4
    • /
    • pp.39-48
    • /
    • 2004
  • In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.

A study of actual planning how to increase IT productivity by COCOMO II Model (IT산업 생산성 향상을 위한 프로젝트 실행계획 수립 방안 연구 - COCOMO II 적용사례)

  • Park, Cheol-Gu;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.2
    • /
    • pp.147-152
    • /
    • 2010
  • Project implementation plan is a blueprint that confirms project performance activities and specifies required man-hour, period and resource imput ratio. Various figures, the results of implementation plan, are predicted through estimation, and because of superiority of objectivity and repeatability, numerical formula-based estimation model is often used overseas. COCOMO model is the representative estimation model whose theories and formulas are publicized and it predicts the total man-hour required for software system development. This model is publicized in "Software Engineering Economics" written by Professor Barry Boehm of the U.S., and is the most widely applied numerical formula-based estimation model. This study is conducted to provide a series of methods that are optimal for KTDS environment by choosing COCOMO II model among various types of COCOMO models. In establishing implementation plan, COCOMO II model alone is not sufficient, it is necessary to link with and apply standard WBS system and standard man-hour. In establishing specific implementation plan, phased standard WBS system in order of the first phase of all the activities implemented in the project, Activity, Task, and Role, and the man-hour put into this should be distributed according to standard ratio from COCOMO II model's total man-hour. This study provides explainations by establishing standard WBS system and linking with COCOMO II model.