Automatic Project Planning Technique and Tool Based on Software Industry Requirements (소프트웨어 산업체 요구사항을 반영한 자동화된 프로젝트 계획 생성 지원 기법 및 도구)

  • Park, Jihun;Shin, Donghwan;Hong, Gwangui;Seo, Dongwon;Hwa, Jimin;Bae, Gigon;Seo, Yeong-Seok;Bae, Doo-Hwan
    • Journal of Software Engineering Society
    • /
    • v.26 no.4
    • /
    • pp.77-92
    • /
    • 2013
  • To plan a software project, the manager (1)make a work breakdown structure (WBS), (2) estimate efforts for each task, (3) assign employee to each task, and (4) estimate overall schedule. When software project becomes complicated, the possible combination of WBS, effort, and employee assignments dramatically becomes larger. Software planning tool can help software project managers to deal with this complexity. In this research, we discuss with a group of experts who work in software industry, to elicit practical requirements that should be considered in the software planning technique. Considering these requirements, we develop a software project planning tool APP (Automatic Project Planner) which provide effort estimation based on historical knowledge data and automatic human resource allocation. Our technique can be the basis of reasonable and practical software project planing.

  • PDF

The studies on preservation and transmission of Jing-Ju - focused on the 'China Jing-Ju Yinpeixiang project' (중국경극(京劇)의 보전(保全)과 전승(傳承) - '중국경극음배상공정(中國京劇音配像工程)'에 대하여)

  • Oh, Kyung-Hee
    • Cross-Cultural Studies
    • /
    • v.25
    • /
    • pp.421-452
    • /
    • 2011
  • This writing is about an effort to try to preserve and transmit the materials related to Jing-Ju(京劇) who is the Chinese traditional theatrical art. The plan to preserve the materials of performing arts is very important because its collection and preservation about them are much more particular than other genres. China got the great results in this field because of China Jing-Ju Yinpeixiang (中國京劇音配像) project. Jing-Ju Yinpeixiang project is a kind of project to restore and preserve the materials which reproduced Jing-Ju repertoire by inserting the performance method of Yinpeixiang (音配像: put together images to sounds) by later actors and actresses of Jing-Ju in recordings of 1950s to 1960s by remained famous ones. Also, this is the large scale culture project that more than 170 institutions and more than 3000 persons participated in during the total 21 years that it first started in 1985 and was completed in the end of 2006. Thanks to this project, China got to have the almost perfect materials which reproduced live performances to add the images of junior actors and actresses who accurately imitated performances of 115 famous actors and actresses including each type of role, schools and great actors from 1907 to the end of 20th century in their voices. This is the only method to restore the materials in this world and very creative. It's been 15 years since TV broadcasting first showed its fruition to Chinese people. The Chinese government gave the positive judgement on this project and prepared to hold the big event which celebrated itself this year. But very little is known of this process and there is no any study in Korea. This writing tried to clarify what Jing-Ju Yinpeixiang project is, what it has meant to Chinese people and what results it has gotten after it's been 15 years since the first show was on TV.

Development of a Project Design Stage BIM Guide for Project Owners (공공발주자의 설계단계 BIM 발주업무 지원을 위한 가이드 개발 연구)

  • Kim, Min-Woong;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.3
    • /
    • pp.269-280
    • /
    • 2015
  • Although BIM has been recognized as one of the main streams that advance the construction industry worldwide, it is difficult to ensure the quality of BIM data due to the problems such as internal errors of BIM tools and lack of guidelines that enhance design quality. Such problems cause designers, constructors, and project owners to hesitate applying it to their business. The main objective of this research is to develop a BIM guide for public project owners that is to be usable at the design phase of the public projects. To meet the objective, the study invited 10 BIM experts from Korean construction industry and operated workshops with focus group interview methodology. As well, a number of BIM guidelines from the BIM advanced countries were reviewed to identify valuable contents for the guide. There are four main parts in the guide developed: BIM design procurement process guide, Request for Proposal development guide for BIM design, BIM execution plan development and evaluation guide, and BIM output and deliverables review and evaluation guide.

A Case Study on the ODA for Creating Shared Value (CSV) in Agricultural Sector Based on the Value Chain Analysis - Project for Establishment of Seed-Potato Production System in Vietnam - (가치사슬분석법에 기초한 농업분야 공유가치창출(CSV) ODA 사례분석 - 베트남 씨감자 생산체계 구축사업 -)

  • Ji, Seong-Tae
    • Journal of Agricultural Extension & Community Development
    • /
    • v.25 no.1
    • /
    • pp.31-44
    • /
    • 2018
  • This is a case study on "the Project for Production Facility and Technical Support of Processed Seed-Potato (2008-2010)" based on the Value Chain Analysis (VCA) used to create and plan International development cooperation projects. The project is the earliest model of Creating Shared Value (CSV) in the agricultural sector. For the case analysis, a framework was established to assess the effectiveness and impact of the CSV project based on the main factors of the VCA. As a result of the assessment, project participation by OSI was able to increase the overall utility by developing the Vietnamese potato processing industry and meeting consumer demand. Furthermore, it formed a business model to promote win-win cooperation and upgraded the value chain of the potato industry. In addition, it contributed to the improvement of incomes and the quality of life of farmers and communities by providing technical guidance and purchase of contracts, as well as labor division and cooperation with other activity supporters.

Optimal Scheduling based on Probabilitic Estimation of Construction Duration (확률적 공기산정에 의한 공정 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-387
    • /
    • 2003
  • Construction project has many problem such as delay of the appointed date delivery, over budget, wether and site conditions. When several activities are influenced by the same factor, their duration may be delayed. This paper deals with the problem of construction duration estimating and schedule variation on the construction project. The theory of constraints technique for project management is referred to 'Critical Chain' technique. This paper shows optimal scheduling plan and time management technique, used probability construction duration estimating and scheduling buffer based on the critical chain project management.

  • PDF

A Study on the Decision Method for CM Organization of Skyscraper Projects in Korea using the Pugh-Matrix (의사결정 매트릭스를 활용한 국내 초고층 프로젝트의 CM 조직 구성 결정방법에 관한 연구)

  • Lim, Jae-Bok;Choi, Won-Cheol;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.2
    • /
    • pp.39-47
    • /
    • 2010
  • In this study, there should be a debation on the methods, such as considerations on the CM organization of skyscraper project for the client's side, process and impact factors need to be taken, and suggesting the evaluation and selection criteria, which may lead strategic decision-making by the client. Owner of the CM organizational decision to establish a variety of alternatives, the range of CM performance characteristics of the project, considering the weight and also by evaluating the effectiveness of appropriate alternative is selected. Domestic skyscraper project, decisions about the CM organization for 'S Tower' prior to the proposed decision and the criteria was applied. As a result, domestic CM/PM companies and overseas CM/PM companies were doing business as J/V, Supervision of the integration work order types showed the highest performance levels. when they ordered CM services. The project cost reduced and organizational improvements, the results of applying alternative way, improve on-site construction plans, sharing key technologies, process improvement plan could benefit from such expectations.

A Policy Plan for Promoting the Economic Efficiency of the Development Aid Project on the Closed Mine -Focused on the Analysis of Economic Spreading Effect upon the Southern Part of Closed Mine in Gangwon Province- (폐광지역 개발 지원사업의 경제성 제고를 위한 정책 방안 -강원남부 폐광지역의 경제적 파급효과 분석을 중심으로-)

  • Yu, Won-Keun;Choi, Ho-Yeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.1
    • /
    • pp.151-159
    • /
    • 2011
  • The aim of this paper is analyzing the economic outcome of development aid project on closed mine and submitting the policy alternatives to seek for substitute industries which lead independent growth of that area. Despite the aid project deployed from 2001 to 2010, the economic result appears to be fragile. It is obvious that the contents and magnitude of aid projects has its own limitation to build independent economic structure in closed mine area. Conclusively, to overcome the regional restrictions, it is important to establish the aid project scheme to make a strategic and systematic resource distribution under the regional circumstances.

A Case Study on the Utilization of Participatory Rural Appraisal on Rural Development - Focusing on Pilot Village Development project of Happiness Program in Vietnam - (참여적 농촌평가(PRA) 활용 농촌지역개발 사례연구 - 베트남 행복프로그램 시범마을사업 중심으로 -)

  • Kim, Jae-Sun;Lee, Il-Kwon
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.2
    • /
    • pp.97-107
    • /
    • 2017
  • The purpose of this study is to introduce a rural development project utilized Participatory Rural Appraisal(PRA), which has been widely developed and applied as an approach and methods for participatory rural development since 1990's. In the ODA project titled as "Happiness Program", a comprehensive community development program designed and conducted by KOICA for underprivileged ethnic minorities in Lao Cai province, Vietnam, the villagers were able to analyse the realities of their situations, to plan, to act, and to monitor and evaluate their actions for improvement through all the processes of PRA utilization. Apart from the successful implementation of participatory rural development activities, this project also made a contribution to extending our knowledge about PRA by presenting the monitoring and evaluation system built for the project and the impact analyzed by the system such as increase in villagers' annual income, expansion of infrastructure, capacity development and etc.

민자사업의 사업관리 사례분석

  • Lee Kwan-Young;Kim Se-Jong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.13-19
    • /
    • 2004
  • In most PFI(Private Finance Initiative) projects in Korea, the project management are in charge of the Special Purpose Company(SPC) established for carrying out the project. This paper is a case study about an owner CM executed by the organizations and staffs of SPC itself. : Seoulbeltway (Ilsan $\~$ Toegaewon) Private Investment Project. In time management area, the SfC was the leader of project management throughout the life circle - plan, design, permit, construction, operation and maintenance - beyond the schedule manager's role. In cost management area, the methods of reducing the total costs by VE, new technologies, etc. has been needed assuming the construction risks were subject to SPC.

  • PDF

System Assurance and Safety Assessment Activities of Urban Marglev ATC Project based on IEC Standards (IEC 규격에 기반한 도시형자기부상열차 열차제어시스템의 시스템보증 및 안전성 평가 활동)

  • Baek, Young-Goo;Park, Hee-Jun;Gu, Jung-Suh;Seo, Do-Seok;Lee, Key-Seo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1669-1679
    • /
    • 2010
  • Related to the on-going "Train Control System Project of Pilot Line Construction for Urban MAGLEV Train", activities by each phase shall be conducted to achieve SIL4 level and obtain safety certification from the Independent Safety Assessment(ISA), based on the IEC standards((IEC 62278/62279 and IEC 62425) for the first time in Korea. This thesis describes the introduction of IEC standards, system assurance activities (such as plan, analysis, test, verification and validation) in compliance with requirements management and project life-cycle and relations with the safety assessment activities; and certification activities (such as document reviews and audits) through system RAMS activities, software quality assurance activities and safety assessment, for the purpose of achieving a successful safety certification at the time of completing the project as system assurance activities including software and safety certification activities in order to acquire the safety certification for train control system which does not exist at all in domestic cases. It is believed that overall system safety assurance activities in this project will contribute to develop more upgraded products of the domestic train control system on the quality and safety point of view, find overseas markets and establish a bridgehead in the future.

  • PDF