• Title/Summary/Keyword: Project Plan

Search Result 2,080, Processing Time 0.023 seconds

Influence Factors Analysis on the Productivity of Management Manpower (건축현장 관리인력의 생산성 영향요인 조사 연구)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Sohn, Hyo-Won;Kim, Sun-Hyung;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.153-157
    • /
    • 2010
  • As the recent economic downturn continues to undermine the profits of construction industry in Korea, it has become ever more pressing to improve productivity of the industry. Since construction site management manpower staffing plan has close bearing on the productivity of construction projects, it is essential to estimate and mobilize adequate number of resources as per conditions and characteristics of each construction site. However, there are no reference approaches in practice to provide baseline for site management manpower staffing plan or estimation of manpower requirement. Therefore, this study aims to examine factors affecting productivity that warrants first and foremost consideration in development of site management manpower staffing plan during the initial phase of building construction project by conducting survey on industry stakehoders with hands-on responsibilities in construction sites and analyzing their responses. Conclusions herein will provide basic inputs for subsequent studies on development of site management manpower staffing plan as per project characteristics.

  • PDF

A Study on Model Development of Cooperative Urban Housing by Neighborhood Agreement - Case Study on the Inner Residential Area, Sunchon City - (이웃협정에 의한 협조형 도시주택의 모델개발에 관한 연구 -순천시의 도심주택지에 있어서 케이스스터디 -)

  • 김영석
    • Journal of the Korean housing association
    • /
    • v.14 no.6
    • /
    • pp.193-204
    • /
    • 2003
  • In connection with the plan for improving the residential environment gradually by analyzing the present condition of the reconstruction and parcel form of the housing area in a inner area, the main objective of this research is to develop a cooperative urban housing model based on the neighborhood agreement. The parcel form has a structure that is inappropriate for individual reconstruction; thus, the substantial improvement only through the residential environment improvement project has its limitations. As an alternative plan to resolve such limitations, I proposed a system that enables step-by-step reconstruction within the small-scaled blocks through the annexation of the land based on the neighborhood agreement. Nonetheless, I realized that it is difficult to apply such reconstruction system to individual housing. Therefore, I presented a design concept on the cooperative urban housing project as a residential form for the reconstruction inside blocks. A model plan vouches for its effectiveness. To apply substantially the cooperative urban housing plan based on the neighborhood agreement, we need to supplement the sectional plan system.

A Study on Decisions of Selection Factors in the Fishing Village New-deal 300 Project Using the Analytic Hierarchy Process (계층의사분석 기법을 적용한 어촌뉴딜 300사업의 선정 결정요인 연구)

  • Kim, Dong Min;Kim, Gunwoo
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.5
    • /
    • pp.692-699
    • /
    • 2022
  • The fishing village new-deal 300 project covers 300 fishing villages and ports for integrated development including reforming backward facilities and utilizing regionally indigenous resources for specialized programs. An analysis was conducted to decide selection factors in the fishing village new-deal 300 project through the expert interview based on AHP(Analytic Hierarchy Process). The results of high-class appraisal items showed that the weights were ranked in the order of the development conditions and basic plan, project effects, project plan, and project execution and management. The project effect obtained 15.57 point in the AHP analysis, whereas the guideline stipulated the point as 6 point for the project effect item, The derived weights for each appraisal item in this study will hereafter be referred in determining the assessment points for the fishing village and port development projects.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

A Study on the Partnership for Activating of University Town in Seoul - Focused on Campus Fence Afforestation Project and the District Unit Plan for Renovating Campus Town Streets of Hanyang University - (서울시 대학가 활성화 계획과정의 파트너십 연구 - 한양대학교 대학가 환경정비형 지구단위계획 및 담장개방녹화사업 중심으로 -)

  • Park, Jin-A;Mok, Ik-Su;Kang, Woo-Seok
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.15 no.4
    • /
    • pp.26-37
    • /
    • 2008
  • Because the university campuses in Seoul have changed to the urban campus type that the boundary of the campus is close to the urban tissue, the relationship between local societies and universities has got more important than before. Recently, through the support of Seoul metropolitan government, some projects for activating campus towns in Seoul have been proceeded. There are two distinctive projects. One is the campus fence afforestation project, and another is the district unit plan for the physical environment improvement of commercial streets around the campus in Seoul. The goal of this study is to analyze the government-university-community partnership for implementation of these two projects related to the model projects and the Hanyang university campus town as the exemplary government-university-community partnership, and to make practical application of other campus town projects to need the harmonious partnership between university neighborhoods and universities.

The Development of a Standardized Work Process for Planning of Plant Project - Focus on Excavating and Investing Participation Plan - (플랜트 프로젝트 사업기획단계 표준 업무 프로세스 개발 - 사업발굴 및 사업참여 결정을 중심으로 -)

  • Lee, Do-yun;Choi, Chang-Hoon;Won, Seo-kyung;Cho, Moon-Young;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.3-11
    • /
    • 2016
  • Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work.

Development plan for a persistent 1.3 GHz NMR magnet in a new MIRAI project on joint technology for HTS wires/cables in Japan

  • Yanagisawa, Y.;Suetomi, Y.;Piao, R.;Yamagishi, K.;Takao, T.;Hamada, M.;Saito, K.;Ohki, K.;Yamaguchi, T.;Nagaishi, T.;Kitaguchi, H.;Ueda, H.;Shimoyama, J.;Ishii, Y.;Tomita, M.;Maeda, H.
    • Superconductivity and Cryogenics
    • /
    • v.20 no.2
    • /
    • pp.15-22
    • /
    • 2018
  • The present article briefly overviews the plan for a new project on joint technology for HTS wires/cables and describes the development plan for the world's highest field NMR magnet, which is a major development item in the project. For full-fledged social implementation of superconducting devices, high temperature superconducting (HTS) wire is a key technology since they can be cooled by liquid nitrogen and they can generate a super-high magnetic field of >>24 T at liquid helium temperatures. However, one of the major drawbacks of the HTS wires is their availability only in short lengths of a single piece of wire. This necessitates a number of joints being installed in superconducting devices, resulting in a difficult manufacturing process and a large joint resistance. In Japan, a large-scale project has commenced, including two technical demonstration items: (i) Development of superconducting joints between HTS wires, which are used in the world's highest field 1.3 GHz (30.5 T) NMR magnet in persistent current mode; the joints performance is evaluated based on NMR spectra for proteins. (ii) Development of ultra-low resistive joints between DC superconducting feeder cables for railway systems. The project starts a new initiative of next generation super-high field NMR development as well as that of realization of better superconducting power cables.

  • PDF

Right Guarantee Level of Job Creation Project for the Elderly by Participation Type : Focused on Madrid International Plan of Action on Ageing (노인일자리사업의 참여유형별 권리보장 수준에 관한 연구 -고령화에 관한 마드리드 국제행동계획을 중심으로-)

  • Yoon, Young-Ji;Lee, Sun-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.5
    • /
    • pp.219-227
    • /
    • 2015
  • This study analyzes the right guarantee level of Job Creation Project for the Elderly by participation type based on Madrid International Plan of Action on Ageing. The analysis is conducted using '2012 Job Creation Project for the Elderly Participants Survey' of Korea Labor Force Development Institute for the Aged. The major findings are as follows: First, "social contribution" type's implementation level of "active participation in society and development" is not high enough. Second, considering the average age of the participants, the level of "work and the ageing labor force" is high enough while the practical level is not high in market. Third, the level of "access to knowledge, education and training" is not enough within "market entrance" participants. Fourth, the level of "poverty reduction" and "income security" is not high. Based on the results, this study proposes that the quality of "social contribution" type's occupations and "market entrance" type's education should be improved. Also, the wages of the entire occupations provided by this project need to be raised.

A Study of Useability of Ecosystem Service Assessment on Strategic Environmental Assessment (전략환경영향평가 시 생태계서비스 평가 결과의 활용가능성에 관한 연구)

  • Park, Yoon-Sun;Kim, Choong-Ki;Lee, Who-Seung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.24 no.2
    • /
    • pp.115-126
    • /
    • 2021
  • Strategic Environmental Impact Assessment (SEA) is a decision-making process taking into account the environmental impact, economic and social impact of policies, plans, and programs at the higher stage prior to the project plan for promoting sustainable development. In this study, we analyzed the process and criteria for selecting appropriate alternatives when establishing development plan in SEA. First, the criteria for estimating changes in ecosystem services following the implementation of development project of industrial complex were presented. Second, alternative evaluations were conducted through an analysis of ecosystem service scenarios to explore suitable alternatives in Anseong. As a result, the environmental quality of selected area as the existing project site deteriorated according to the implementation of the project, and the dimensional reduction technique confirmed that the change in ecosystem service factors in project area was the optimal location. In addition, the results of the scenario assessment to explore suitable alternatives in Anseong City showed that the existing site had large capacity in terms of water quality control services (scenario 1), scenario 2 in terms of preconditioning services, and scenario 3 in terms of water supply services. The guidance of Ecosystem service assessment is expected to be available in decision-making of large-scale strategies (e.g., SEA) and projects by presenting more quantitative criteria for determining the adequacy and location feasibility of development plans and policy plans. This is expected to require various support, including legislation and revision of related laws, believed to be supported by advanced research.

A Study on The Effective Technology Readiness Assessment Method for System Development Project (체계개발 사업의 효과적인 기술성숙도 평가방법에 대한 연구)

  • Kim, Hyun Woo;Ko, Jeong Hwan;Chung, Eui Seung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.2
    • /
    • pp.144-149
    • /
    • 2015
  • In this study, the effective technology readiness assessment (TRA) method for system development project is suggested. We analyze the domestic and foreign TRA practice and derive the new idea to resolve the problems found from the analysis. Domestic and foreign organizations develop and use checklist for the precise TRA, but the checklist has some problems in type of questions and analysis of assessment. TRA method using the original TRL definition or the checklist should be selected depending on the project characteristic. Questions of the checklist should be classified into critical or non-critical according to their importance. Finally, Test and evaluation master plan (TEMP) in system engineering process can provide an obvious criteria to assess technology readiness level (TRL) of critical technology elements (CTE) composing the system.