• 제목/요약/키워드: Project Network Diagram

검색결과 11건 처리시간 0.027초

보-기둥구조 PC공동주택 골조공사 작업관계 분석 (Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building)

  • 김기호;김진원;김민준;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

원자력연구개발사업의 공정관리 적용 사례 연구 (A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project)

  • 한도희
    • 기술혁신학회지
    • /
    • 제2권3호
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF

VERT를 이용한 위험 분석 사례연구 (Case study of risk analysis using VERT)

  • 안병찬;이정구
    • 경영과학
    • /
    • 제12권3호
    • /
    • pp.77-95
    • /
    • 1995
  • This paper shows the case study of risk analysis in an weapon system research and development project. For risk analysis, an advanced stochastic networking technique-VERT (Venture Evaluation and Review Technique) is used. Assumptions for activities of network diagram and conversion methods from PERT ( Program Evaluation and Review Technique) to VERT are discussed. Also, simulation result is presented and discussed.

  • PDF

임계경로 탐색과 프로젝트 활동 일정 수립 (A Critical Path Search and The Project Activities Scheduling)

  • 이상운
    • 한국인터넷방송통신학회논문지
    • /
    • 제12권1호
    • /
    • pp.141-150
    • /
    • 2012
  • 본 논문은 프로젝트 일정을 계획하고 관리하는 PERT/GANTT 차트를 쉽게 그릴 수 있는 임계경로 탐색 알고리즘을 제안하였다. 프로젝트 일정을 결정하는 임계경로를 계산하기 위해 일반적으로 CPM (Critical Path Method)이 적용되고 있다. 그러나 CPM은 프로젝트 수행 활동들의 수행 기간과 상호 의존 관계에 따라 초기에 작성된 네트워크 다이어그램에 대해 임계경로를 계산하는데 5 단계를 수행하며, $T_E$ (The Earliest Time)을 계산하는 노드 (활동)들의 순서를 결정하는 방법을 제시하지 않아 특정 노드의 $T_E$를 정확히 계산하지 못할 수도 있다. 또한, CPM으로 얻은 네트워크 다이어그램의 활동들의 수행 순서가 시각적으로 명확히 표현할 수 없어 Lucko는 9 단계를 거치는 알고리즘을 제안하였다. 반면에, 제안된 알고리즘은 먼저, 초기에 작성된 네트워크 다이어그램에 대해 너비우선 탐색으로 노드들을 레벨로 재배치하여 수행 순서를 사전에 결정한다. 다음으로, 각 레벨에 속한 노드들을 임의로 선택하여 $T_E$를 계산하는 단계만을 거쳐 임계경로를 즉시 결정한다. 마지막으로, 각 레벨에서 임계경로에 속한 노드들의 $T_E$를 기준으로 임계경로에 속하지 않은 노드들의 $T_E$에 따라 약간의 이동으로 프로젝트 활동들의 수행 순서를 시각적으로 명확히 표현하도록 하였다. 제안된 알고리즘은 10개의 실제 프로젝트 데이터에 대해 적용성을 검증하였다. 제안된 알고리즘은 모든 프로젝트에서 임계경로를 구할 수 있었으며, 활동들의 수행 순서를 시각적으로 명확히 표현하였다. 또한, 제안된 알고리즘은 CPM의 5단계를 1단계로 단축시키는 장점과 더불어 활동들의 수행순서를 명확히 표현하기 위한 Lucko의 9 단계 수행 과정을 2단계로 간단히 하였으며, PERT/GANTT 차트로 즉시 전환시킬 수 있는 장점도 갖고 있다.

수도권 광역 순환전철 구축 전략 (A building strategy of effective metropolitan circular railways)

  • 한우진;박정수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.620-625
    • /
    • 2007
  • According to 'Metropolitan Traffic Network Plan' announced in 2001, radial railways which connect Seoul with satellite cities around Seoul appear gradually. And followed by this, social demand for circular metropolitan railways that can connect the radial railways horizontally is increasing. But existing plans about circular metropolitan railways has limits to propose only passing cities of the railways. If there is no detailed guideline for circular metropolitan railways, the each railway for circular line will be constructed individually and then it will be not effective circular railways totally. Additionally that railway project will be easily interrupted by popular complaints. Therefore "The basic plan for circular metropolitan railways" is needful to guide a right direction for circular metropolitan railways. In this paper, rough track diagram of 'node' station for circular metropolitan railways is proposed. It is essential part of the basic plan. If the track diagram of a node is publicized in advance and individually lines of circular metropolitan railways is enforced to followed it, all lines will has rich circular functionality. Finally, effective circular metropolitan railways can be built.

  • PDF

JarBot: Automated Java Libraries Suggestion in JAR Archives Format for a given Software Architecture

  • P. Pirapuraj;Indika Perera
    • International Journal of Computer Science & Network Security
    • /
    • 제24권5호
    • /
    • pp.191-197
    • /
    • 2024
  • Software reuse gives the meaning for rapid software development and the quality of the software. Most of the Java components/libraries open-source are available only in Java Archive (JAR) file format. When a software design enters into the development process, the developer needs to select necessary JAR files manually via analyzing the given software architecture and related JAR files. This paper proposes an automated approach, JarBot, to suggest all the necessary JAR files for given software architecture in the development process. All related JAR files will be downloaded from the internet based on the extracted information from the given software architecture (class diagram). Class names, method names, and attribute names will be extracted from the downloaded JAR files and matched with the information extracted from the given software architecture to identify the most relevant JAR files. For the result and evaluation of the proposed system, 05 software design was developed for 05 well-completed software project from GitHub. The proposed system suggested more than 95% of the JAR files among expected JAR files for the given 05 software design. The result indicated that the proposed system is suggesting almost all the necessary JAR files.

작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법 (Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities)

  • 이규진
    • 한국건설관리학회논문집
    • /
    • 제1권3호
    • /
    • pp.75-80
    • /
    • 2000
  • 공간의 분할이 많은 건축공사에서는 반복적 특성으로 인해 공정계획상에 다수의 대안이 존재한다. 공사기간은 각 액티비티의 기간뿐 아니라 반복되는 액티비티의 배열방법에 의해서도 많은 영향을 받는다. 본 연구는 각 액티비티에 적정한 선행 액티비티를 할당함으로써 여유시간을 최소화하는 공정계획기법을 제시하는 것을 목적으로 진행되었다. Line of Balance 기법을 기본으로 하는 기존연구와는 달리 본 연구에서는 AON방식의 네트워크 기법을 기본으로 하여 공간과 자원의 두 축 사이에 액티비티를 배열하였다. 각 액티비티별로 자원과 공간의 양방향으로 가장 적절한 선행 액티비티를 검색하여 여유시간을 최소화한다. 본 연구에서 제시한 액티비티 배열방법을 공동주택공사 건설공사를 대상으로 적용한 결과, 액티비티 배열을 달리함에 따라서 다수의 대안이 존재함을 확인할 수 있었으며 그중 적정대안을 찾아낼 수 있었다. 본 기법은 공동주택공사와 같은 다수의 유사공간으로 구성된 건설공사의 공정 계획에 도움을 줄 수 있을 것으로 판단된다.

  • PDF

초급 건설사업관리기술자(CMr)의 요구역량 추출 및 ANP 중요도 분석 (An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer)

  • 양진국;김세범;이상범
    • 한국건설관리학회논문집
    • /
    • 제18권1호
    • /
    • pp.58-64
    • /
    • 2017
  • 건설관리 (CM)는 효율적인 프로젝트 관리 시스템으로서 활용되고 있다. 건설관리 시스템은 과학적 관리 기법을 제공할 뿐만 아니라, 전문 지식을 가진 전문가의 서비스를 제공한다. 따라서 CM 서비스 수요는 건설 프로젝트에서 지속적으로 증가하고 있다. 건설사업관리기술자의 등급은 건설 기술자 역량지수 (ICEC)에 의해 구분된다. 건설사업관리기술자는 다른 분야보다 높은 점수를 필요로 한다. 하지만 초급 건설사업관리기술자는 교육과 자격에 따라 등급을 획득할 수 있다. 본 연구는 현행 건설사업관리기술자 등급 시스템의 문제점을 분석한 후 초급 건설사업관리기술자를 대상으로 인터뷰를 실시하였다. 그 결과 본 연구에서는 23가지의 요구역량 요인들을 추출하였다. 그리고 요구역량은 친화도법을 사용하여 5가지 영역으로 그룹화 하였다. 다음으로, ANP 기법을 이용하여 중요도를 분석하였다. 그 결과 우선 순위가 높은 영역이 프로젝트 관리와 관련된 품질 및 비용 영역으로 분석되었다.

공급사슬기반의 육상물류중개시스템 개발에 관한 연구 (Inland Logistics Forwarding System based on Supply Chain Management : ILOF)

  • 박남규;최형림;김현수;박영재;손형수
    • 정보기술응용연구
    • /
    • 제3권2호
    • /
    • pp.67-82
    • /
    • 2001
  • 오늘날 날로 증가하는 물류비는 개별 기업은 물론 국가 전체의 수출 경쟁력을 약화시키는 주요 원인으로 지적되고 있다. 그러나 특히 육상물류의 경우 그 비중이 전체 화물 운송의 60% 이상을 차지함에도 불구하고 심각한 교통체증 및 물류기반 시설의 미비, 효율적인 정보시스템의 미비 등으로 인하여 물류비가 계속 증가하는 양상을 보여 왔다. 따라서 본 논문에서는 우리나라 육상물류산업이 안고 있는 문제점의 해결을 위한 방안들 중의 하나로 공급사슬관리(Supply Chain Management) 개념을 운송산업에 적용한 e-logistics 시스템 개발 프로젝트의 길과를 소개하고 있다. 본 논문에서 소개하는 육상물류중개시스템은 공급사슬개념을 운송산업에 적용하여 화주, 물류중개회사 및 운송사 사이의 업무처리 프로세스 및 데이터 베이스를 공유하면서 차량의 흐름과 정보흐름을 원활하게 하여, 고객에 대한 서비스를 제고하는 한편 인건비, 통신비, 차량유지비 등을 절감할 수 있게 한다. 특히 육상물류중개시스템은 화물의 운송과 관련하여 발생하는 다양한 정보들을 데이터베이스에 저장하여 두었다가 세관 및 터미널에 대한 각종 신고업무에 이용할 수 있으며, 이밖에도 교통정보 및 화물 위치정보 등 다양한 서비스를 제공해 주고 있다. 육상물류중개시스템은 현재 개발중인 항만물류통합데이터베이스를 기반으로 한 항만물류원스톱서비스 시스템과 연계되어 차후에는 물류원스톱시스템으로 발전할 수 있을 것이다.

  • PDF

4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스 (4D BIM based Workspace Planning Process in Building Construction Project)

  • 최병주;이현수;박문서;김현수;황성주
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.175-187
    • /
    • 2013
  • 건설프로젝트에서는 다양한 참여자들이 제한된 공간에서 각자의 작업공간을 차지하며 작업을 수행한다. 작업공간에 대한 부적절한 계획은 건설프로젝트의 생산성 감소, 작업 위험 증가 및 품질 저하 등의 문제로 이어지기 때문에 작업공간은 건설프로젝트에서 고려하여야 할 중요한 요소 중 하나이다. 그러나 기존의 건설프로젝트 공사 계획 수립을 위한 방법들은 건설프로젝트에서의 작업공간을 고려하지 못하는 한계가 있었다. 따라서 본 연구에서는 체계적이지 못한 작업공간 계획으로 인하여 발생하는 작업공간 간섭 문제를 예방하기 위하여 4D BIM(Building Information Model) 기반의 작업공간 계획 프로세스를 제안한다. 제안된 프로세스는 각 작업공간의 특성과 공사수행계획을 반영하여 각 액티비티의 작업공간 점유상태를 표현하고 이를 바탕으로 발생 가능한 작업공간 간섭을 발견한다. 또한 각 액티비티와 작업공간의 특성 그리고 공사수행계획 등을 고려하여 발견된 작업공간 간섭에 대한 해결책을 도출한다. 본 연구의 결과를 바탕으로, 프로젝트 관리자는 본 공사 수행 이전에 공사에 필요한 작업공간을 미리 계획함으로써 서로 다른 액티비티 작업공간 사이의 간섭을 예방하고 건설프로젝트에서의 불필요한 손실을 예방할 수 있다.