A Study on the Estimation of the Contingency by the Regression Analysis on the Apartment (회귀분석을 통한 공동주택 공사예비비 산정에 관한 연구)

  • Lee Man-Hee;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.226-229
    • /
    • 2003
  • Construction manager must consider the possibility on the failure of the project in advance and the contingency to provide against the situation, those of which is a dangerous condition not to predict. If they have a quick decision without understanding the contingency, the over-cost in the total cost would be continuously accumulated, and be a barrier at a project going in progress. A various risk could not be coped with at a time to decide either going or sloping the project until the contingency is applied from the first step to progress the project. But a case to apply the contingency to the construction for the investment or the analysis of the project is a little. The process to evaluate it is also absent. The propose of this paper is the followed ; To establish the total cost including the risk first of all, devide into plus or minus factor of the cost, and then the process to calculate the contingency must be suggested by the regression analysis.

  • PDF

A Web Based System for Usability Project Planning and Testing (사용성 평가 계획 및 수행을 위한 웹 기반 시스템)

  • Park, Danbee;Hong, Ki-Hyung
    • KIISE Transactions on Computing Practices
    • /
    • v.21 no.4
    • /
    • pp.308-314
    • /
    • 2015
  • Usability has become an important consideration for product development, and as a result, there is a growing need for systems and tools that can support usability test projects. However, few studies so far have developed such systems and tools. During a usability test project, many participants take up different roles, such as project managers, usability testers, and subjects. We implement a web-based usability test system with which a project manager can manage and control all participants and documents throughout the entire usability test process, from the design of a usability test project to the analysis of the test results. A usability test generates many documents, such as subject agreement forms and before/after questionnaires. Since many different subjects can participate in a usability test, consistency during testing with different participants and efficient document management are the keys to success for a usability test. Since all users that participate in usability test projects can access web-based usability test systems through a web browser, regardless of the place where they are, the reliability of the testing results can improve since the tests are conducted in the locations where the target products are meant to be used. In particular, our system is useful for disabled individuals who cannot move.

A Standardized BIM Framework for Supporting Life-cycle Business Process for Port & Harbour Facilities (항만시설의 생애주기 업무 지원을 위한 BIM 표준 프레임워크 구축)

  • Moon, Hyoun-Seok;Won, Ji-Sun;Shin, Jae-Young
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.49-59
    • /
    • 2018
  • Recently, the application of BIM for port & harbour facilities has been increasing, as it is widely applied to the infrastructure field both at domestic and abroad. However, the port and harbour projects still have very poor facilities information management system and the application level of BIM is very low compared to other facilities. Even if BIM is applied for those project, it is very difficult to determine in advance what information is needed without an accurate understanding of the business process. The purpose of this study is to develop a BIM framework for port & harbour facilities and to examine its applicability. To do this, we structured the classification of the port & harbour facilities and constructed object-based classification system based on ISO12006-3 standard. We also derived the BIM framework requirements from the viewpoint of process, standard, interface, and information, and confirmed the linkage of the BIM object classification system in the framework item. The applicability of the BIM framework for inspection process cases of port & harbour was examined. Accordingly, this study can solve requirement setting method, which is the non - procedural and non - systematic project information, in the BIM application process of the port & harbour project with the BIM framework. In addition, the framework is expected to be integrated into the system to play a key role in the selection of project objectives, and the ability to clearly identify the information requirements required by the BIM manager to perform the project.

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

A Study on the Consultation for Technology Leakage Victim Using NLP

  • KANG, In-Seok;LIM, Heon-Wook
    • The Journal of Industrial Distribution & Business
    • /
    • v.11 no.2
    • /
    • pp.33-39
    • /
    • 2020
  • Purpose: The purpose of this study is that victims of technology leaks and people concerned about leaks complain of stress over security concerns. However, there are no psychological treatments among the government's comprehensive plans to prevent technology leaks. Therefore, the government intends to present education methods using the NLP (Neuro Linguistic Program), a collective counseling technique, to heal the psychological injury of the victims. Psychological counseling methods include cognitive behavioral therapy, psychoanalytic behavioral therapy, humanism therapy, art therapy, and other psychological therapies. Among them, NLP (Neuro Linguistic Programming) method was used. NLP has three concepts: neuron, language, and programming, and is used as a general method for group counseling. Research design, data and methodology: In relation to composition, Chapter 1 explained the purpose and necessity of the study, Chapter 2 explained the types of psychological counseling and NLPs to help understand the study, introduced the prior study related to the development of collective counseling programs through NLP, and Chapter 3 developed a security psychological counseling education program. In addition, FGI(Focus Group Interview) was conducted for professionals. Results: Corporate counseling considered most in this study should satisfy client, counselor and manager differently from individual counseling. For this purpose, the result was composed of 11 times. In order to derive personal problems for clients, they consisted of finding, loving, expressing, and emancipating self. And, It solved the leakage anxiety to suggest a professional solution for the counselor. In addition, this course helps them become familiar with counseling techniques for becoming a good security administrator. Lastly, it was configured to leave the result for the manager to suggest the organizational development method through this training. The implication of this study is to derive psychological counseling methods for security officers. Most companies in the field of security counseling complain about technology leakage stress. There is currently no psychotherapy support project under the policy. And It was developed because it can expect sales improvement from security consultation. Conclusions: In conclusion, the results were organized to be left to the manager so that he could suggest how to develop the organization through this time.

Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF

An Empirical Study on the Importance of Psychological Contract Commitment in Information Systems Outsourcing (정보시스템 아웃소싱에서 심리적 계약 커미트먼트의 중요성에 대한 연구)

  • Kim, Hyung-Jin;Lee, Sang-Hoon;Lee, Ho-Geun
    • Asia pacific journal of information systems
    • /
    • v.17 no.2
    • /
    • pp.49-81
    • /
    • 2007
  • Research in the IS (Information Systems) outsourcing has focused on the importance of legal contracts and partnerships between vendors and clients. Without detailed legal contracts, there is no guarantee that an outsourcing vendor would not indulge in self-serving behavior. In addition, partnerships can supplement legal contracts in managing the relationship between clients and vendors legal contracts by itself cannot deal with all the complexity and ambiguity involved with IS outsourcing relationships. In this paper, we introduce a psychological contract (between client and vendor) as an important variable for IS outsourcing success. A psychological contract refers to individual's mental beliefs about his or her mutual obligations in a contractual relationship (Rousseau, 1995). A psychological contract emerges when one party believes that a promise of future returns has been made, a contribution has been given, and thus, an obligation has been created to provide future benefits (Rousseau, 1989). An employmentpsychological contract, which is a widespread concept in psychology, refers to employer and employee expectations of the employment relationship, i.e. mutual obligations, values, expectations and aspirations that operate over and above the formal contract of employment (Smithson and Lewis, 2003). Similar to the psychological contract between an employer and employee, IS outsourcing involves a contract and a set of mutual obligations between client and vendor (Ho et al., 2003). Given the lack of prior research on psychological contracts in the IS outsourcing context, we extend such studies and give insights through investigating the role of psychological contracts between client and vendor. Psychological contract theory offers highly relevant and sound theoretical lens for studying IS outsourcing management because of its six distinctive principles: (1) it focuses on mutual (rather than one-sided) obligations between contractual parties, (2) it's more comprehensive than the concept of legal contract, (3) it's an individual-level construct, (4) it changes over time, (5) it affects organizational behaviors, and (6) it's susceptible to organizational factors (Koh et al., 2004; Rousseau, 1996; Coyle-Shapiro, 2000). The aim of this paper is to put the concept, psychological contract commitment (PCC), under the spotlight, by finding out its mediating effects between legal contracts/partnerships and IS outsourcing success. Our interest is in the psychological contract commitment (PCC) or commitment to psychological contracts, which is the extent to which a partner consistently and deeply concerns with what the counter-party believes as obligations during the IS project. The basic premise for the hypothesized relationship between PCC and success is that for outsourcing success, client and vendor should continually commit to mutual obligations in which both parties believe, rather than to only explicit obligations. The psychological contract commitment playsa pivotal role in evaluating a counter-party because it reflects what one party really expects from the other. If one party consistently shows high commitment to psychological contracts, the other party would evaluate it positively. This will increase positive reciprocation efforts of the other party, thus leading to successful outsourcing outcomes (McNeeley and Meglino, 1994). We have used matched sample data for this research. We have collected three responses from each set of a client and a vendor firm: a project manager of the client firm, a project member from the vendor firm with whom the project manager cooperated, and an end-user of the client company who actually used the outsourced information systems. Special caution was given to the data collection process to avoid any bias in responses. We first sent three types of questionnaires (A, Band C) to each project manager of the client firm, asking him/her to answer the first type of questionnaires (A).

A Study on the Performance Analysis and Improvement of the Book Sharing Regular Delivery Project for Pre-schoolers in Gyeonggi Province (경기도 유아 책꾸러미 정기배송 사업에 대한 성과 분석 및 개선방안 연구)

  • Gum-Sook Hoang;Soo-Kyoung Kim;Sung-Une Yoon
    • Journal of Korean Library and Information Science Society
    • /
    • v.53 no.4
    • /
    • pp.71-100
    • /
    • 2022
  • The purpose of this study is to analyze the performance of the Gyeonggi province book sharing regular delivery project for pre-schoolers in 2021, analyze the problems of the project, and suggest improvement measures to help the preparation of policies for the promotion of reading culture in Gyeonggi province. As a result of the survey, the necessity and satisfaction of the project were found to be very high for both the caregivers and the reading coaches. In particular, in the case of caregivers, the higher the amount of reading after the project, the higher the need for and satisfaction with the project. It was found that they wanted to participate in programs such as regular book delivery. Even in the convergence of expert opinions, it was evaluated that there was a positive change in the perception of parenting by reading by caregivers, and that the necessity and satisfaction of this project were very high due to the development of infant-parent interaction. However, in the self-evaluation of the project manager and the implementing organization, it was evaluated that better results could be achieved only when the project was carried out through thorough planning and preparation in advance. Through this, for the continuity of Gyeonggi province regular delivery of children's book packages, improvement plans were presented and Gyeonggi-do's reading culture promotion policy was proposed.

Document Flow for the Research Reactor Project in ANSIM Document Control System (ANSIM 문서관리시스템에서 연구로사업 문서흐름)

  • Park, Kook-Nam;Kim, Kwon-Ho;Kim, Jun-Yeon;Wu, Sang-Ik;Oh, Soo-Youl
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.4
    • /
    • pp.18-24
    • /
    • 2013
  • A document control system (DCS), ANSIM (KAERI Advanced Nuclear Safety Information Management) was designed for the purpose of documents preparation, review, and approvement for JRTR (Jordan Research and Training Reactor) project. The ANSIM system consists of a document management, document container, project management, organization management, and EPC (Engineering, Procurement and Construction) document folder. The document container folder run after specific contents, a revision history of the design documents and drawings are issued in KAERI. The EPC document work-scope is a registry for incoming documents in ANSIM, the assignment of a manager or charger, document review, preparing and outgoing PM memorandum as attached the reviewed paper. On the other hand, KAERI is aiming another extra network server for the NRR (New Research Reactor) by the end of this year. In conclusion, it is the first, computation system of DCS that provides document form, document number, and approval line. Second, ANSIM increases the productivity of performance that can be recognized the document work-flow of oneself and all participants. Finally, a plenty of experience and knowledge of nuclear technology can be transmitted to next generation for the design, manufacturing, testing, installation, and commissioning. Though this, ANSIM is expected to allow the export of a knowledge and information system as well as a research reactor.

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF