• Title/Summary/Keyword: Project Management Framework

Search Result 499, Processing Time 0.026 seconds

A Standardized BIM Framework for Supporting Life-cycle Business Process for Port & Harbour Facilities (항만시설의 생애주기 업무 지원을 위한 BIM 표준 프레임워크 구축)

  • Moon, Hyoun-Seok;Won, Ji-Sun;Shin, Jae-Young
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.49-59
    • /
    • 2018
  • Recently, the application of BIM for port & harbour facilities has been increasing, as it is widely applied to the infrastructure field both at domestic and abroad. However, the port and harbour projects still have very poor facilities information management system and the application level of BIM is very low compared to other facilities. Even if BIM is applied for those project, it is very difficult to determine in advance what information is needed without an accurate understanding of the business process. The purpose of this study is to develop a BIM framework for port & harbour facilities and to examine its applicability. To do this, we structured the classification of the port & harbour facilities and constructed object-based classification system based on ISO12006-3 standard. We also derived the BIM framework requirements from the viewpoint of process, standard, interface, and information, and confirmed the linkage of the BIM object classification system in the framework item. The applicability of the BIM framework for inspection process cases of port & harbour was examined. Accordingly, this study can solve requirement setting method, which is the non - procedural and non - systematic project information, in the BIM application process of the port & harbour project with the BIM framework. In addition, the framework is expected to be integrated into the system to play a key role in the selection of project objectives, and the ability to clearly identify the information requirements required by the BIM manager to perform the project.

A Framework for Identifying and Analyzing IT Project Risk Factors (IT프로젝트 위험 요인 식별 및 분석 프레임워크 연구)

  • Jangho Choi;Chanhee Kwak;Heeseok Lee
    • Information Systems Review
    • /
    • v.19 no.4
    • /
    • pp.87-110
    • /
    • 2017
  • Analyzing and finding the risk factors in information technology (IT) projects have been discussed because risk management is an important issue in IT project management. This study obtained the risk factor checklists with priorities, analyzed the causal relationship of risk factors, and determined their influences on IT project management. However, only few studies systematically classified IT project risk factors in terms of risk exposure. These studies considered both the probability of occurrence and the degree of risk simultaneously. The present study determined 53 IT project risk factors on the basis of literature and expert group discussions. Additionally, this study presented clustering analysis based on the data of 140 project managers. The IT project risk factor classification framework was divided into four areas (HIHF, HILF, LIHF, and LILF). The present results can be used to help IT project managers establish effective risk management strategies and reduce IT project failures. This study also provides academic implication because it considers both the probability of occurrence and the degree of influence of risk factors.

APPLICATION OF FUZZY LINEAR PROGRAMMING FOR TIME COST TRADEOFF ANALYSIS

  • Vellanki S.S. Kumar;Mir Iqbal Faheem;Eshwar. K;GCS Reddy
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.69-78
    • /
    • 2007
  • In real world, the project managers handle conflicting goals that govern the use of resources within the stipulated time and budget with required quality and safety. These conflicting goals are required to be optimized simultaneously by the project managers in the framework of fuzzy aspiration levels. The fuzzy linear programming model proposed herein helps project managers to minimize total project costs, completion time, and crashing costs considering indirect costs, contractual penalty costs etc by practically charging them in terms of direct cost of the project. A case study of bituminous pavement under construction is considered to demonstrate the feasibility of applying the proposed model for optimization of project parameters. Consequently, the proposed model yields an efficient compromise solution and the decision maker's overall degree of satisfaction with multiple fuzzy goal values. Additionally, the proposed model provides a systematic decision-making framework, enabling decision maker to interactively modify the fuzzy data and model parameters until a satisfactory solution is obtained. The significant characteristics that differentiate the proposed model with other models include, flexible decision-making process, multiple objective functions, and wide-ranging decision information.

  • PDF

Constructing the Maintenance Management Framework for KTX trains using RCM (RCM을 이용한 한국 고속철도차량의 유지보수체계 구축)

  • 오석문;강길현;김성권;유경종;최석중
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.53-60
    • /
    • 2002
  • This paper introduces KTX RCM(Reliability-Centered Maintenance) project which is for development of a decision making support system on the KTX maintenance framework. The functionality of the system is composed of ( i ) Fundamental Data Management, ( ⅱ ) Maintenance Goal Management, ( ⅲ ) Maintenance Program Management, ( ⅳ ) Cost-Effect Analysis, ( v ) Parameter Management. This system may improve existing maintenance Management procedure for rolling stock of KNR.

  • PDF

A SOA-based Application Model for Building Intelligent Construction Supply Chain Management Framework (지능형 건설물류관리 체계 구축을 위한 SOA 적용 모델 개발)

  • Shin, Tae-Hong;Chin, Sang-Yoon;Yoon, Su-Won;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.733-737
    • /
    • 2008
  • Construction supply chain management focused on materials in construction industry plays a critical role which controls the success and failure of a project. For the efficiency of construction supply chain management, the framework which provides project participants with the information originated from whole construction logistics steps without the omission and discontinuation of information flow is required. The new management framework that can support this environment is necessary because of setting up the complicated and distributed environment including logistics information management by intelligent equipment, co-working management with pre-framework legacy system and various devices(UMPC and PDA etc.) as the information confirmation and electrical transmission tool between the project participants different from former construction supply chain management environment while recently developing ubiquitous technologies such as RFID/USN and intelligent equipment to support logistics process. Therefore, the objective of this study is to introduce the concept of SOA (Service Oriented Architecture) as an alternative of effective information integration under the complex and distributed environment and to propose the SOA-based application model for building intelligent construction supply chain management framework.

  • PDF

Safety Management Framework for Information Handover Effectiveness in the Construction Industry (건설 안전관리 개념적 틀 및 정보이양 효율성 분석)

  • JIN, Zhenhui;JUNG, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.50-61
    • /
    • 2020
  • Safety management has been one of the most critical issues in the construction industry for a long time. Despite continuous efforts, it still shows a higher accident rate than other sectors. To reduce the accident rate, a lot of studies have been performed, mostly focused on contractors or construction phase. Although the initial stage of the construction project has the most significant impact on construction safety and decision-makers at the initial stage play an important role, the safety management system throughout the project entire life-cycle is still insufficient. In addition, although a great deal of information is generated in the construction project and the value is increasing, while it shows an inefficient aspect. This is believed to be due to insufficient information exchange and a lack of standards. In this context, this study aims to analyze the efficiency of information handover in construction safety. For this purpose, a safety management framework for systematically and efficiently managing and utilizing for construction safety information is referred to as 'safety business functions', 'project life-cycle', and 'industrial hierarchy'. The 'safety business functions' are classified into three levels. And then, in order to analyze the efficiency of safety information handover, 'importance of safety business function' and 'efficiency of safety information handover' were evaluated by interviewing with experts. This study can be used as reference data for implementing systematical and efficient safety management, and can also increase construction safety competency.

A Case Study on EAI Implementation for Enterprise Process Integration: Focusing on EAI Project in Deakyo Co (기업 프로세스 통합을 위한 EAI 구축사례: 대교(주)의 EAI 프로젝트를 중심으로)

  • Yoon, Cheol-Ho;Choi, Hea-Seong
    • Journal of Information Technology Services
    • /
    • v.5 no.3
    • /
    • pp.109-119
    • /
    • 2006
  • The company cannot optimize its computing environment just with individual solutions such as ERP(enterprise resource planning), SCM(supply chain management), CRM(customer relationship management), and KM(knowledge management). EAI(enterprise application integration) has emerged as an alternative that can optimize computing environment of the company through integrating such solutions and systems of distributed computing and mainframe environment. This paper reports the case study of Deakyo Co. in successfully implementing EAI. It describes project goal, project organization, project plan, the implemented EAI configuration and its features, the EAI effectiveness to the firm, and the critical success factors of the EAI project. This case study is thought to be useful as a practical guideline in carrying out EAI project of the company and to provide significant basis for constructing the theoretical framework of EAI project methodology.

A Study of Pre-assessment Framework for Business Environment for Delivering Projects in a New Overseas Market (해외 신규 시장의 프로젝트를 수행하기 위한 사업환경 사전조사 프레임웍에 관한 연구)

  • Oh, Jungkeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.78-90
    • /
    • 2015
  • Due to a significant decrease in the number of construction projects in the domestic market of Korea, overseas expansion of the Korean construction companies has been accelerated in recent years. However, the practice of bidding at a low price and lacking information about foreign new markets caused many companies to fail in their entries to these markets. As a measure to prevent such failures, this study has developed a framework which first defines the key research items that must be identified beforehand and then classifies them into a structured way so that the construction companies can actually use this framework to be better prepared for their forays into the new markets. The framework was actually applied for a construction project in Morocco, and its usefulness was proven by the user's successful participation into the project, nevertheless the application and result was limited. Although perhaps this framework should be applied to many more construction projects for its validity to be verified and for its structure to be better standardized, the framework still has its value due to the following two reasons: first, it has systemized the research items that had been only conceptually defined but had never been organized, and second it can be utilized as a investigation tool at the marketing stage.

FRAMEWORK FOR HIGHLY INTEGRATED, INTEROPERABLE CONSTRUCTION SIMULATION ENVIRONMENTS

  • Simaan M. AbouRizk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.71-82
    • /
    • 2009
  • This paper describes the use of a highly interactive and inter-operative application for complex simulation environments, or Synthetic Environments (SE), as deployed for construction as Construction Synthetic Environments (CSE). Based on the High Level Architecture (HLA), this research focuses on implementing simulation technology in a software environment, COSYE, that will be the foundation for building CSE applications. This framework is discussed in the context of tunneling and industrial construction applications, including steel fabrication and pipe-spool manufacture. The framework is demonstrated using the NEST sanitary tunnel project in Edmonton, Canada, in which COSYE was used for scenario-based analysis and planning.

  • PDF

Economic Evaluation of Early Detection System for Warranty Issues (품질보증 이슈 조기감지 시스템의 경제성 평가)

  • Jung, Sung-Hwan
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.1
    • /
    • pp.39-48
    • /
    • 2012
  • An early detection system for warranty issues periodically collects customers' claim data and automatically reports alarms about emerging issues based on statistical algorithms. It helps companies to reduce an issue definition time and save the handling cost of warranty claims. This paper provides an evaluation framework to validate the economic effect of an early detection system project. For this purpose, we present economical index of a project with explicit formulas such as ROI(return on investment), PP(payback period), NPV(net present value), PI(profitability index) and IRR(internal rate of return) and analyze the sensitivities of the index according to the variation of project input parameters. The proposed analysis framework is expected to be used for evaluating economic values of various system integration projects.