Risk Analysis on Offshore Windfarm Industry in South Korea: Based on the Jeonnam Offshore Windfarm Project

  • Kim, Tae Hyun;Kim, Yea-Sang;Chin, Sangyoon;Pallesen, Kristian
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.204-212
    • /
    • 2022
  • Recently, the Korean government has been actively promoting the smart city as their strategic agenda. However, to build smart cities that are greener, the authors believe it is essential to rapidly transit conventional energy sources such as fossil fuels to renewable energy. Although there is a big potential for Offshore wind in Korea, there has not been a full-scale commercial offshore wind farm until today. Since Korea is relatively a new market compared to the EU, it can be risky for developers. The authors will introduce risk management best practices in the offshore wind industry applicable to the Korean environment. This paper will mainly introduce an offshore wind project size of 99 MW. The project is expecting a Finance Close (FC) in Q3 2022, so the project team has prepared a risk register with over 150 risks and levers throughout the project lifecycle. Overall risks include risks with Development Expenditure (DEVEX) impact, a Capital Expenditure (CAPEX) impact, and an Operating Expenditure (OPEX) impact. Based on the identified risks, a more qualitative assessment of Cost and Schedule Impact was conducted. In conclusion, a Monte Carlo simulation was performed to propose a quantitative risk assessment to evaluate a benchmark contingency of the project cost.

  • PDF

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

우수유출저감 시설의 최적위치 결정 (Optimal Location of Best Management Practices for Storm Water Runoff Reduction)

  • 장수형;이지호;유철상;한수희;김상단
    • 한국물환경학회지
    • /
    • 제24권2호
    • /
    • pp.180-184
    • /
    • 2008
  • A distributed hydrologic model of an urban drainage area on Bugok drainage area in Oncheon stream was developed and combined with a optimization method to determine the optimal location and number of best management practices (BMPs) for storm water runoff reduction. This model is based on the SCS-CN method and integrated with a distributed hydrologic network model of the drainage area using system of 4,211 hydrologic response units (HRUs). Optimal location is found by locating HRU combination that leads to a maximum reduction in peak flow at the drainage outlet in this model. The results of this study indicate the optimal locations and numbers of BMPs, however, for more exact application of this model, project cost and SCS-CN reduction rate of structural facilities such infiltration trench and pervious pavement will have to be considered.

건설 프로젝트 리스크 관리 효율성 향상을 위한 성과측정시스템(PPMS) 개발 (Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics)

  • 차희성;김기현
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.82-90
    • /
    • 2013
  • 건설 산업의 속성상 프로젝트의 성과를 정량적으로 분석하기 위해서는 다양한 영향인자에 대한 고려가 필수적이다. 프로젝트의 특성과 성과와의 관계를 파악하고, 프로젝트에 가장 적합한 관리기법을 적용시켜서 프로젝트의 성과를 향상시키기 위해서는 성과관련 정보를 축적시켜 관리하기 위한 시스템적인 접근이 요구되고 있다. 그럼에도 불구하고 많은 성과관련 시스템들은 성과결과의 분석에만 치중하여 프로젝트의 특성이나 관리기법 등 성과에 영향을 미치는 인자에 대한 심도 있는 분석방법과 접근방식에 대한 고려 부족으로 인해 성과시스템의 활발한 적용을 기대할수 없었다. 이에 본 연구는 건설 프로젝트의 특성을 고려하여 성과를 사전에 예측하고 성과체계를 정량적으로 모델링할수 있는 성과정보시스템을 개발하는 데 목적을 두었다. 이를 위해 실제 사례프로젝트의 성과관련 정보를 바탕으로 성과결과와 프로젝트 특성, 관리기법 간의 상관관계를 분석함으로써 해당 프로젝트에 가장 적합한 관리기법을 도출할수 있는 방안을 수립하였다. 그 결과, 성과영역별로 다양한 관점에서 프로젝트의 성과비교가 가능할 수 있는 정량화 방안을 정립하였고, 상관관계 분석을 통해 성과예측이 가능한 모델을 제안하였으며, 기존 데이터 분석을 통해 최적 관리기법을 선정할수 있는 시스템을 개발하였다. 웹기반 프로그램으로 구축된 시스템은 향후 데이터베이스의 지속한 관리와 보완을 통해서 성과정보의 양을 확대시킨다면 통계적으로 유의미한 결과를 바탕으로 신뢰성 있는 프로젝트 성과 관리를 도모할수 있을 것으로 사료된다.

Evaluation of Management Performance for Heritage Buildings Case Study: Greco-Roman Museum - Alexandria, Egypt

  • Adel El-Menchawy;Wael Kamel;Amal Mamdouh;Mirna Eskander
    • Architectural research
    • /
    • 제25권3호
    • /
    • pp.41-51
    • /
    • 2023
  • Building restoration is a complex process with a high level of uncertainty. Restoration professionals can significantly benefit from the well-established discipline of project management to achieve their targets; however, available evidence shows that the use of the project management body of knowledge in restoration projects is far from the desired level. Several historical organisations have since been established with the goal of preserving and governing cultural identity, and numerous studies have supported the need of preserving architectural heritage. Many owners, investors, academics, and developers believe that it would be considerably more expensive to renovate and restore an old building than to create a new one. Although the project management process is generally recognised, the concept of project management for architectural heritage projects differs due to the uniqueness of each project. It differs from many construction projects in terms of the need for research-based practices to define scope, planning, scheduling, supervision,decision-making,and also performance. The Greco-Roman Museum in Alexandria's planning, design, and building phases are being studied with the aim of identifying and analysing the variables that contribute to project delays. Three project management pillars were established as a result of gathering this data from the project's stakeholders: the first pillar addresses time management for the existing phase and how it will be incorporated into the new extension phase; the second pillar addresses performance in relation to project management issues in the delivery of the best quality of a construction project; and the third pillar addresses the scope of the new extension because it will significantly impact the other two pillars. This paper argues that a contemporary perspective which utilizes project management tools and techniques can contribute to the conservation of architectural heritage in line with the conservation principles.

CM의 핵심석공요인 체크리스트 개발을 통한 CM적용효과 평가기법 개발 기초연구 (The Basis research Developing Assessment tool for Construction Management through Check List of Critical Success Factor)

  • 이태식;최재호;김영현;박장희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.337-340
    • /
    • 2003
  • 최근 건설사업관리(Construction Management : 이하 CM) 발주방식이 늘어 나고 있다. 해외 선진국에서는 건설 산업 전반에 걸쳐 핵심 성공요인과 모범사례를 활용을 극대화 하여 다양한 건설산업의 핵심 성과지표 향상에 기여하고 있고 표준지표를 제시하여 산업계의 벤치마킹 자료로 활용하고 있는 반면 국내에서의 연구개발은 개념 정립 단계이다. 그래서 본 연구는 CM적용 모범사례 및 핵심성공요인 체크리스트 개발을 통한 산업계 수행능력 향상 및 CM적용효과 평가 기법을 개발해 CM사업의 성공적인 국내 도임에 일조하고자 한다.

  • PDF

자동차 부품업체를 위한 웹 기반 통합 신제품 개발 BPM 시스템 Framework (Web-base integrated BPM system framework for the new product development of automotive suppliers)

  • 유석규;최병규;황현철;사공극
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2003년도 춘계학술대회 논문집
    • /
    • pp.34-37
    • /
    • 2003
  • This paper proposes a BPM(Business Process Management) system framework for the NPD(New Product Development) of automotive suppliers. Recently many enterprises change their organization from function-oriented to process-oriented through BPR (Business Process Reengineering). Especially, based on quality systems like QS9000, it is required to documented business processes and continuously improve these processes for customer satisfaction. NPD, the most significant function for industrial competition, is reinforced by the best practices business process to satisfy the requirements of quality systems. The main objective of the paper is the development of the information system that supports the best practices process management. For this, first, we define the requirements of BPM system for NPD based on the viewpoint analysis, and then propose a DES (Design Execution System) framework based on dynamic workflow engine. The DES is addressed in the characteristics of a NPD business process, integrated project management, and process execution. A prototype DES system has been developed in the web environment. Its validity is demonstrated by applying it to an automotive supplier.

  • PDF

선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안 (Modular Building Construction Process Development by Benchmarking International Best Practices)

  • 신현규;안용한
    • 한국건설관리학회논문집
    • /
    • 제17권6호
    • /
    • pp.3-12
    • /
    • 2016
  • 본 연구의 목적은 모듈러 건축 프로젝트를 수행하는데 발생할 수 있는 위험요인을 도출하고, 해외 선진사례 분석을 통해 도출한 관리요소를 벤치마킹함으로써 국내 적용 가능한 모듈러 건축 시공 프로세스를 제안하는 것이다. 본 연구를 수행하기 위해 해외 대표적인 모듈러 건축 사례인 미국 애틀랜틱 야드 B2 프로젝트를 분석하고 내용분석법을 통해 모듈러 건축 시공 단계에서 발생할 수 있는 위험요인을 도출하였다. 본 연구결과인 모듈러 건축 시공 프로세스를 기반으로 모듈러 건축 설계, 제작 단계부터 시공 단계에 발생되는 위험요인을 고려하여 관리한다면, 시공 과정에서 발생할 수 있는 잠재적인 위험요인을 사전에 방지하고, 시행착오를 줄여 모듈러 건축 시공성도 향상시킬 수 있을 것이다. 또한, 모듈러 건축 프로젝트를 효율적으로 관리함으로써 모듈러 공법의 장점인 공기 단축 및 공사비 절감을 실현하고, 결과적으로 시공품질을 확보하여 모듈러 건축 활성화에 기여할 수 있을 것이다.

Lessons learned from Multinational Parties Involved Program Management Consortiums in Korea

  • KO, Ok-Yeol
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.32-36
    • /
    • 2015
  • This study explores the issue of program management consortia involving multinational participants. The aim of this research was to leverage advantages in program management (PM) skills and PM model improvement in product line construction in mega scale construction programs, typically funded by public funds. Such ventures involve multinational parties using dedicated partnering based on a program management consortium (PMC) to reduce confrontation between parties in complex circumstances, allowing an open and non-adversarial approach to project management. This research also seeks to implement an ongoing feedback program of best practices and lessons learned to minimize the repetition of mistakes and to reduce costs in sequenced construction. Recently, the Korean government has planned to undertake three large new projects: the Korean Peninsula major river maintenance, the reclamation of Se-Mangum, and the Science/Business City. This paper starts by providing a framework for the cost-reduction strategy for the United States Forces Korea (USFK) Relocation Program, which will be funded with public funds and a private fund investment (PFI) that combines programs executed by two governments as owners and multinational stakeholders, joined in the PMC. The establishment of project-oriented consortia is an innovative and non-adversarial approach to massive international construction projects. Such projects have used various tools effectively and skillfully. This experience may offer an opportunity to practice new and advanced program management delivery methods, and it is expected that Korea will gain a competitive advantage in the international construction market.

  • PDF

Improving the Contractor-subcontractor Relationship Through Partnering on Construction Projects in Zambia

  • Mudzvokorwa, Tafadzwa;Mwiya, Balimu;Mwanaumo, Erastus M.
    • Journal of Construction Engineering and Project Management
    • /
    • 제10권1호
    • /
    • pp.1-15
    • /
    • 2020
  • With the increased dependence on subcontracting in the construction industry, the operational relationship between main contractors and subcontractor plays an imperative role in successful project delivery. Consequently, improving this relationship increases the probability of project success and enhancing project performance. A wide range of research has confirmed that partnering improves the main contractor-subcontractor relationship. Though the positive impact of partnering on project performance is supported by a plethora of evidence, the guiding theory on practical partnering process steps is limited. The study aimed at improving subcontracting in the construction industry through a partnering process relevant to Zambia guided by factors obtained from industry expects. Questionnaire surveys and Semi-structured interview were adopted to investigate the perception of construction industry professionals and academics towards the main contractor-subcontractor relationship along with improvement factors. The findings showed that the relationship between main contractors and subcontractors on most projects in Zambia is unsatisfactory therefore justifying attention. Top factors that can enhance the main contractor-subcontractor relationship were identified. From the factors deduced and guidelines on partnering best practices, a project partnering model was developed.