A Case on Application of the PMBOK(Project Management Body of Knowledge) Guide in Nuclear Power Plant Architect Engineering (PMBOK Guide 지식영역 적용 사례 -원전종합설계를 중심으로-)

  • Im, Jae-Min;Kim, Seong-Su
    • Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.41-45
    • /
    • 2012
  • Nowadays the Project Management is increasingly adapted into almost all the fields in business management processes among leading companies both in Korea and overseas. However its actual practices are rare to be found. Among the Project Life Cycle, this report covers the real cases of the PMBOK knowledge areas in NPP Architect Engineering. The areas of the Construction, Start-up and Operation will be exception of the cases. By way of analyzing the KEPCO ENC's Processes/Procedures/Systems and the ones in PMBOK Guide, this report will show the contents in the PMBOK Guide is rather practical than theoretical. Meanwhile, implications whether the conclusions of this report might be applied to other industries such as general construction, non-nuclear plants, etc. should be left behind to follow-up studies.

A Study on the Method of the Project for Feasibility Study to Practical Use Urban Transit Maglev Based on System Engineering (시스템 엔지니어링에 기초한 도시형 자기부상열차 실용화 타당성 조사 사업의 수행방법 연구)

  • Jeong, Gyeong-Ryeol;Yun, Se-Gyun;Park, Cheol-Ho
    • Proceedings of the KSR Conference
    • /
    • 2006.05a
    • /
    • pp.47-59
    • /
    • 2006
  • This study is about a feasibility study for the practical using Urban Transit Maglev system based on systems engineering. First of all we defined what phase is matched with the project for feasibility study in the system life cycle and identified tasks that shall be done in the phase. Finally we suggested how to do in this project. The Urban Transit Maglev system is not wholly new system. It has similar architecture to a legacy urban railway system. But it is the system that is partially introduced new technology, because there are many projects have this characteristic within the country, we expect that this study may provide references.

  • PDF

Improved Link System of Schedule and 3D Object for VR-base Construction Project (가상건설기반의 건설공사 일정 및 3D객체 연동시스템의 개선된 구축방안)

  • Kwon, Jung-Hui;Moon, Hyoun-Seok;Park, Seo-Young;Gi, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.289-294
    • /
    • 2007
  • Virtual reality (VR) technology for construction project includes 3D CAD application and 4D CAD system for visualizing construction schedule data. 3D CAD application is more important in the design phase and 4D CAD system is effective tool in the construction phase. This study suggests a methodology to develop VR functions that can be used for project life cycle. The results of this study includes composition algorithms to make VR systems such as bird's eye view system, VR drawings system, VR telepresence system and VR risk management system. Those methodologies can be used for integrated VR system with nD CAD object.

  • PDF

A Basic Study on the Development of Simulation Systems for Supporting the Pre-design Phase of Construction Projects (건축 기획 지원 시뮬레이션 시스템 개발에 관한 기초 연구)

  • Min, Kyung-Min;Ham, Nam-Hyuk;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.176-181
    • /
    • 2007
  • The widespread of IT technology caused a remarkable change in many industries and the construction industry is also one of them being influenced in the form of CIC(Computer Integrated Construction) and BIM(Building Information Modeling). Construction projects have many participants from various disciplines involved throughout the entire process. Therefore the success of the project greatly depend on the efficiency of decision-making using the information generated from each process stage. Looking from this aspect, the greatest potential value lies in the planning and pre-design stage when considering the construction life cycle. In this paper, we propose a project on developing a 3D object oriented simulation system for supporting the pre design phase. We define the needs for such system through previous case studies and suggest a to be process model. Finally we anticipate the effects that the project will eventually contribute to the construction industry.

  • PDF

A Study on Maintenance Bundle Alternatives of BTL Project for Educational Facilities Using Complete Linkage Algorithm (컴플리트 링키지 알고리즘을 이용한 교육시설물 BTL사업 유지관리번들 구성방안에 관한 연구)

  • Cho, Chang-Yeon;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.15 no.3
    • /
    • pp.4-16
    • /
    • 2008
  • BTL(Build-Transfer-Lease) Project for Education Facilities is contracted as a package which consists of several education facilities and its maintenance period is 20 years. Thus, total cost variation largely depends on the accuracy of the maintenance cost forecasting in the early stage in the life cycle of the BTL Projects. This research develops a method using complete linkage algorithm and branch & bound algorithm to help in finding optimal bundling combination. The result of this research suggests more reasonable and effective forecasting method for the maintenance bundle in BTL projects.

The Guideline for Management of Software Project and Its Application (소프트웨어 사업 관리를 위한 지침과 적용방안)

  • Yoo, Cheon-Soo;Lee, Sang-Ho;Sim, Seung-Bae;Cho, Sung-Rim;Song, Ki-Ho;Hur, Jung
    • Journal of Information Technology Services
    • /
    • v.8 no.1
    • /
    • pp.125-142
    • /
    • 2009
  • The Ministry of Information and Communication announced "The Guideline for Management of Software Project" in October 2006. The public employees(acquirer) have to manage software projects with this guideline. The guideline was based on the International standard(ISO/IEC 12207) and IEEE standard(IEEE/EIA 12207), and was developed by considering the domestic software industry environment. The guideline can help to establish a software acquisition process for appropriate management of software projects, and the process can increase the management productivity of software projects. This study provides the explanation about the guideline with terms of 5W1H(who(user), what(summary), when(time to apply), where(domain of application), why(objective), how(method of use)) for understanding of the guideline.

A study on Development of train performance analysis model for the high-speed electric multiple unit 400km/h experimental (차세대 고속열차 성능해석 모델 개발)

  • Lee, Tae-Hyung;Park, Choon-Soo;Kim, Young-Guk;Choi, Sung-Hoon;Kim, Sang-Soo;Han, In-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.524-528
    • /
    • 2008
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperimental) project starts in 2007. It is required to analysis and simulate the train performance throughout the project life cycle for a successful completion of the project. This paper is devoted to the development of a train performance analysis model for the high-speed electric multiple unit 400km/h experimental. The model consist of running resistance model, train model, traction model and braking model. So, this paper represents the results of the train performance analysis.

  • PDF

Analysis of the BIM technology status and the development strategy in Korea

  • Yun, Seok-Heon;Kim, Sang-Chul;Lee, Namhun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.648-649
    • /
    • 2015
  • BIM could be used for integrating project information through life cycle of building facilities. Also it could improve the accuracy and work efficiency through data interoperability with other disciplines. However, these benefits from adopting BIM could not be attained easily in real project cases. In order to make the most use of BIM and get the maximum benefits from it, the environments such as standards, guidelines and the related technologies are also could be supported. Therefore many countries are developing or already developed the technology roadmap for BIM. In this study, we tried to analyze the BIM technology status and develop the strategy for improve usability of BIM in Korea.

  • PDF

BIM for Construction Quality Record

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.252-254
    • /
    • 2015
  • Building Information Modeling (BIM) encourages effective information share and utilization among project participants during entire life cycle of facility. This paper presents a method that keeps track of the historical quality records involved in construction operations and facilitates using BIM. The method is coded into BIM based Quality Record Traceability (BIM-QRT) System that makes use of historical records obtained from database administrating construction operations. This study is of value to practitioners because the method makes clear the project participants' responsibility relative to the quality of each and every element of the facility. The main objective of this research is to develop an accurate, fully automated method for construction Quality Record Tracking by using a BIM along with construction operations data obtained by information technology. Test cases verify the usability and validity of the methods implemented in the system.

  • PDF

Guide-line for Developing a Maintainability Program (보전성 경영 프로그램 개발을 위한 지침)

  • 이낙영;김종걸;권영일;홍연웅;전영록;나명환
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.269-269
    • /
    • 2001
  • Maintainability refers to the ease with which maintenance work can be done. It involves the process of ensuring that products can be easily and safely maintained and that the maintenance support requirement is minimized. When a product has a reasonably long life, the cost of operation and support during that life can greatly exceed the initial capital cost. The value to the customer of optimizing maintainability should be evident. Some effort and expense applied to achieving a product which can be easily and cheaply maintained will make very significant savings in the life cycle costs. In this paper, the International Standard IEC 60300-3-10, which is the application guide for maintainability, is considered. This standard can be used to implement a maintainability program covering the initiation, development and in-service phases of a product. It provides guidance on how the maintenance aspects of the tasks should be considered in order to achieve optimum maintainability. The elements of a maintainability program, which are maintenance policy and concept, maintainability studies, project management, design for maintainability, analysis and prediction methods, maintenance verification and validation, analysis of life cycle cost, maintenance support planning, and collection and analysis of maintenance data, are fully discussed in this paper.