• Title/Summary/Keyword: Project Integration Management

Search Result 328, Processing Time 0.03 seconds

On the Development of Reference Guidelines for Self-evaluation of Organization's Systems Engineering and Project Management Capability (조직의 SEPMC 자체 평가에 유용한 참조기준 개발)

  • Choi, Young Gil;Lee, Jae Chon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.27-36
    • /
    • 2012
  • In modern systems, the operational capability of the system to the user needs is expanding rapidly to accommodate the size of the system, functionality, and interfaces are becoming increasingly complex. Accordingly, the systematic practice of project management and systems engineering in the system development process, as an important element in successful systems development is recognized. EIA/ANSI 632, ISO/IEC15288, the leading international standard for systems engineering and is the leading international standard on project management PMBOK. CMMI is also contains information about the activities of project management and systems engineering and worldwide basis to assess the maturity of an organization's ability to develop system being used. But CMMI model is too complex of structure and there are many overlap parts of contents. So there are many problems for members of organization understanding all of CMMI model, applying organization and, achieving improvement activity. In this study, through the analysis and integration between the model and the related standard coverage activities essential for successful systems development in organizations that require systems engineering and project management capabilities(SEPMC) for self-assessment and continuous improvement activities to provide useful reference guideline.

A study on how to find new project of Six Sigma (식스 시그마 프로젝트 개발에 관한 연구)

  • Lim, Sung-Uk;Yoon, Seong-Pil;Kim, Chang-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.27-56
    • /
    • 2006
  • Prior to Six Sigma, many companies had adopted a policy management method designed to manage business performances through the top-down deployment of management policies. This policy management method and the Six Sigma CTQ Flow Down will make a good combination when their merits are developed and systemized as the management innovation program which enables to set up innovation targets along with management targets in the stage of strategic planning and to participate all the personnel from top management down in achieving th targets. This paper will help the companies implementing Six Sigma improve their management constitutions and achieve better management performances through the integration of policy management and Six Sigma.

Implementing SOA (Service Oriented Architecture) as an upcoming IT standard for Business Integration (비즈니스 통합의 표준으로서 '서비스 지향 아키텍처' 구축에 관한 연구)

  • Cho, Jae-Hun;Choi, Woo-Yong;Lee, Sang-Wan
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.10a
    • /
    • pp.182-185
    • /
    • 2005
  • To survive in rapidly changing business environment, the enterprise should adapt its business process to the changing environment. The system integration is an important issue to tackle this challenge. It is unavoidable direction that SOA (Service Oriented Architecture) is accepted as an upcoming IT standard to support flexible business processes and integration. In this paper, SOA is introduced, and the Web services and ESB (Enterprise Service Bus) ate also introduced as a foundation technology to implement SOA-enabled solutions. The pilot project, which is introduced in this paper, will be a good reference for future SOA implementation.

  • PDF

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations (금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구)

  • Kim, Hyung-Man;Seo, Guan-Hee;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.5 s.143
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

Impact of Seepage from Land Treatment of Pulp and Paper Effluent on Water Quality and Aquaculture

  • Wirojanagud, W.;Tantemsapaya, N.;Chalokpanrat, P.;Suwannakom, S.
    • Environmental Engineering Research
    • /
    • v.15 no.3
    • /
    • pp.163-166
    • /
    • 2010
  • Pulp and paper mill wastewater has been treated by biological treatment, but the secondary effluent still contains high lignin, chemical oxygen demand, color and total dissolved solids. Tertiary treatment by land application, referred to as 'Project Green,' has been implemented to treat such high quantities of undesirable matters. The impacts of seepage from Project Green diffusing into receiving streams on the water quality and fish pen aquaculture were studied via the integration of technical and social approaches. The determination of the water quality was performed for 13 sampling stations along the receiving stream, including the Chot stream, Chot lagoon and the Pong River. The water quality was generally at normal levels, with the exception of total dissolved solids. The levels of matter were higher at the Chot stream, but became more diluted at the Chot lagoon and the Pong River, respectively. The social approach was conducted through the voluntary participation of the villagers as research assistants for the fish aquaculture study. Fish could grow at three fish pens within the study sites at the location of Project Green, the Chot lagoon and the Pong River. Fish growth at the Chot lagoon was better at the site of Project Green and the Pong River. The integration of technical and social approaches was a meaningful tool not only for the technical feasibility but in helping to solve the conflict between the community and industry.

A Evaluation System Integrating Cost-Cross Effects of Big Scale R&D Projects (R&D프로젝트군의 우선순위 결정을 위한 비용 - 상호효과 통합평가시스템)

  • Kwon, Cheol-Shin;Lee, Soon-Cheon;Park, Jooh-Ho
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.32 no.2
    • /
    • pp.163-175
    • /
    • 2007
  • [ $ulcorner$ ]Cost-Effectiveness Analysis$\lrcorner$ has been wifely used to evaluate economic efficiency of R&D projects, but most of cost-effectiveness evaluation systems have some problems such as systematic method for setting and evaluating cost factors, estimation of single effect on each R&D project, and estimation of cross effects among R&D projects. To solve these problems, we have designed a new evaluation indicator called a $ulcorner$Cost-Cross Effect Integration Indicator$lrcorner$ including cross effects developed in this research. The major research findings are summarized as follows : (1) $ulcorner$Coist Estimation Model$lrcorner$, which estimates the cost factors divided into two classes of assembly product and system product and then integrates the total cost values, has been designed. (2) A new method for estimating parameters of cross effects among R&D projects has been developed. (3) $ulcorner$Cross Effects Estimation Model$lrcorner$ to estimate multi-effects and cross effects by completion time among several projects has been designed. (4) $ulcorner$Integration Estimation Indicator$lrcorner$ for setting priority on a project group has been extracted by combination of total cost value and total effect value.

A Priority Analysis on Influential Factors for Invigorating Project Management Office (PMO) in Public Sectors based on Analytic Hierarchy Process (AHP) (계층분석과정을 이용한 공공분야 PMO 제도 활성화요인 우선순위 분석)

  • Back, Hyungchung;Kang, Pilsung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.42-53
    • /
    • 2014
  • This study identifies influential factors for invigorating the public management office (PMO) system for system integration (SI) projects in public sectors and analyzes the priority of each factor from the point of different stakeholders, i.e., owners, SI company, and PMO. Based on the literature review, four first-level influential factors are identified: legal system maintenance, owner's capability, SI company's capability, and PMO's capability. Among them, the PMO's capability is determined as the most critical factor by all the stakeholders. Among the second-level influential factors, the capabilities of professional engineers and project managers are considered as important among the PMO's capability, whereas the reasonable consulting fee is considered as the most critical factor among the legal system maintenance. With respect to each stakeholder, project management capability is considered as the most important factor for owners, while the reasonable consulting fee is considered as the most important factor for PMO.

'Knowing' with AI in construction - An empirical insight

  • Ramalingham, Shobha;Mossman, Alan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.686-693
    • /
    • 2022
  • Construction is a collaborative endeavor. The complexity in delivering construction projects successfully is impacted by the effective collaboration needs of a multitude of stakeholders throughout the project life-cycle. Technologies such as Building Information Modelling and relational project delivery approaches such as Alliancing and Integrated Project Delivery have developed to address this conundrum. However, with the onset of the pandemic, the digital economy has surged world-wide and advances in technology such as in the areas of machine learning (ML) and Artificial Intelligence (AI) have grown deep roots across specializations and domains to the point of matching its capabilities to the human mind. Several recent studies have both explored the role of AI in the construction process and highlighted its benefits. In contrast, literature in the organization studies field has highlighted the fear that tasks currently done by humans will be done by AI in future. Motivated by these insights and with the understanding that construction is a labour intensive sector where knowledge is both fragmented and predominantly tacit in nature, this paper explores the integration of AI in construction processes across project phases from planning, scheduling, execution and maintenance operations using literary evidence and experiential insights. The findings show that AI can complement human skills rather than provide a substitute for them. This preliminary study is expected to be a stepping stone for further research and implementation in practice.

  • PDF

The Effects of the Project Managers' Competency and Leadership Style on the Performance and the Customer Satisfaction of SI Projects (SI 프로젝트에 있어서 프로젝트 관리자의 역량과 리더십 유형이 프로젝트 성과와 고객만족에 미치는 영향)

  • Kim, Eun-Hong;Kim, Wha-Young
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.31 no.4
    • /
    • pp.157-179
    • /
    • 2006
  • Recently, as business becomes more dependent on information technology for their operations, SI project managers are under increasing pressure to implement SI projects on time and within budget, and to satisfy customer requirements. For the success of SI projects and customer satisfaction, SI project managers should master the critical shills and knowledge requirements and consider the proper leadership style to lead the team members and to manage SI projects. The leadership style includes four categories, such as directive leadership, supportive leadership, participative leadership, and achievement-oriented leadership. This study has examined the project managers' competency and suggests the three competency factors, which are technical, human, and conceptual shills, for the success of SI projects and customer satisfaction. The study suggests that SI project managers should master the three critical skills and knowledge requirements, and consider the proper leadership style for the successful implementation of SI projects. Also SI project managers should consider contingency factors such as project size and duration and outcome variables such as protect performance and customer satisfaction so as to enhance the leadership effectiveness.

Earned Value Management Application Issues and Consideration for Weapon System Development Project (무기체계 연구개발 사업에서의 사업성과관리 적용 이슈 및 고려사항)

  • Kuk, Seung Hak;Kim, Yun Hee;Kim, Yongsin;Ju, You Yi
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.41-48
    • /
    • 2015
  • It is generally recommended to use EVM as an efficient means for measuring project performance and progress so that the EVMS user could manage his project successfully. In spite of it's favorable intention, most project participants think it as a heavy load or a sub practiced job with low responsibility. Especially in a weapon system R&D project, the manager should consider a possibility to change plans in the middle of the project because of uncertainty coming from properties of the R&D project. Even though there are lots of variables triggering unpredictable troubles in EVM application, EVM still could be a valuable project health indicator. In this paper we introduce a case study of EVM application for weapon system development project. Furthermore, we suggest several solutions for the issues occurring in utilizing EVM.