• Title/Summary/Keyword: Project Integration Management

Search Result 328, Processing Time 0.022 seconds

Information Systems in Project Management of The Public Sphere

  • Mamatova, Tetiana;Chykarenko, Iryna;Chykarenko, Oleksii;Kravtsova, Тetiana;Kravtsov, Olеg
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.8
    • /
    • pp.141-148
    • /
    • 2021
  • Project management is a current trend of management in the public sphere, based on different principles, methods and tools. The tools include information technologies providing control over time, cost, quality and planning process in order to ensure accountability to interested parties. The goal of the research was to examine the impact of the integration of information systems in project management of the public sphere on the quality of public governance and administration using the example of infrastructure projects involving the private sector in developing countries. The methodology of the research is based on the concepts of "digital-era governance" (DEG), "Information governance" and "project governance" to determine the effectiveness of information systems and technologies in the management of infrastructure projects in the public sphere. The data from the countries with Lower middle income (India, Indonesia, Philippines, Ukraine, Vietnam) and Upper middle income (Argentina, Brazil, China, Colombia, Mexico, Peru, Romania, Russian Federation, Thailand, Turkey) for 1996-2020 were used to study the effects of DEG. The results show two main trends in the countries with Lower middle income and Upper middle income. The first trend is the development of digital governance, the concept of "digital-era governance" through information systems and performance measurement of the governance system, forecasting of investment flows of infrastructure projects, measurement of payback and effectiveness parameters for investment management in the public sector, decision support. The second trend is the existence of systemic challenges related to corruption, social and institutional factors through the development of democracy in developing countries and the integration of NPM similar to developed countries. The confidence of interested parties, especially private investors, in public authorities is determined by other factors - the level of return on investment, risks and assignment of responsibility, probability of successful completion of the project. These data still remain limited for a wide range of project participants, including citizens.

The Implementation of Enterprise Application Integration System in ERP Environment (ERP 환경에서 EAI시스템 실증적 적용 사례 연구)

  • Nam, Ho-Ki;Park, Sang-Min;Kim, Jhong-Hyun;Jung, Sung-Ah
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.197-205
    • /
    • 2010
  • The company protects the information of legacy system to satisfy all member in company. Integrating between applications is increasing recently because of e-Business activation. The e-Business activation also make between extra companies and intra companies integrated. This paper suggest on implementing the ERP using Phased Approach Method and the EAI(Enterprise Application Integration) with legacy system. This paper also suggest the standard method which would be used in implementing the EAI in another company and reduce the mistake during the EAI project. Therefore, it would be the one system between complicated systems through application integration, it would be also make shop floors visualized. This research would help users and service suppliers getting more advantages of e-Business system.

A Study on the Agile Approach in Battlefield Management Information System R&D Project in Korea Military (국방 전장관리정보체계 연구개발사업의 애자일 적용 방안 연구)

  • Yun, SungHyun;Lim, GyooGun
    • Journal of Information Technology Services
    • /
    • v.20 no.1
    • /
    • pp.41-54
    • /
    • 2021
  • The SW-centered battlefield management information system R&D project takes a long period of 5-10 years or more by applying a complex and rigid batch acquisition strategy. In order to solve this problem, it is necessary to institutionalize a rapid and flexible battlefield management information system R&D project management procedure applying agile development methodology, and a government project management organization and contract management method to support it In this study, we analyzed the case of applying the Agile development method centered on Scrum to the US SW-centered weapon system R&D project and the characteristics and problems of the battlefield management information system R&D project in Korea, and suggested improvement measures as follows. First, the battlefield management information system R&D model applies the hybrid development method, and the system requirements analysis and system structure design use the existing waterfall development procedure, and the agile method is applied from the SW requirements analysis to the system integration stage. Second, flexible adjustment of performance, schedule, and cost by organizing an Agile IPT in which military (requirements) - DAPA (project management) - developer - functional specialized organizations (test and evaluation, quality, government research institutes, etc.) participate. Third, improving the Basic Order Agreement so that it can be applied to agile R&D.

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

Measuring Performance to Engage the Extended Project Team in Construction

  • Bal, Menoka;Bryde, David
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.1-10
    • /
    • 2015
  • In construction, stakeholders of extended project team play a key role in the overall project performance. Successful integration of stakeholders demands for good management practices at strategic, operational and project levels. Targets and measures to improve the stakeholder performance encourage the creativity and willingness of stakeholders of extended project team to develop the better ways to achieve the project objectives. This paper presents a generic descriptive method, showing how stakeholder's ability and influence impacts on project performance in the construction sector. The findings of a series of interviews with key informants are presented and the following main conclusion is drawn: improving project performance through stakeholder's contribution and measuring their performance can strengthen the project performance. This innovative approach which redefines the process of improving the project performance in construction projects will be of interest to those who intend to manage the projects in practice as well as to those who interested in advancing theory.

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

Design of maturity model for software project management level evaluation (소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.4
    • /
    • pp.609-615
    • /
    • 2011
  • In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.

Management and development models of software projects for system integration (시스템 통합을 위한 소프트웨어 과제 관리 및 개발 모형)

  • 한영근;이규봉;권순기
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.225-229
    • /
    • 1996
  • In order to accomplish large-size information systems successfully, one of the most improtant factor is the system integration(SI) of individual software projects which consist of the systems. A developer of each project should consider aspects of SI through the development cycle, and a manager of the entire system should manage, control, and evaluate each from a SI point of view. In this research, management models for the system managers, development models for the developers of unit projects, and standardized output documents for the management and evaluation purpose are presented based on the SI concepts.

  • PDF

Integration of multi-functional system using relational database and graphical user interface (관계형데이타베이스와 그래픽사용자 인터페이스를 이용한 설계시스템의 통합화)

  • 이종갑;서승완;김준호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.519-526
    • /
    • 1994
  • In the large and multifunctional engineering system, the heterogeneous computer system situation is inevitable. Accordingly a lot of integration efforts are being made to comply with the industrial requirement of productivity. In this paper, a practical concept of integration is introduced through the development of a prototype system for ship outfitting design which is a typical example of large/multi-functional application system. On the development of the prototype system, three points are considered as a practical concept-which are integration of database, integration of application programs, and system-user interface. The relation model based commercial database management system(RDBMS) is used to build the project integrated database, and the graphical user interface tool(OSF/Motif) on X-window system is used for the integration of application programs and the user interface.

Competency-Based Career Management System Plan for Construction Manager (건설사업관리자의 역량기반 경력관리체계 구축 방안)

  • Jung, Seo-Young;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.60-61
    • /
    • 2016
  • The specialty of Construction Manager's work is largely depends on the project progress stage and the type of management work. However, at present, career management system manages only the type and duration of the construction project, disregarding specialty and competence. However, in order to select a right construction manager for the client's needs or project characteristics, career management should be subdivided and managed according to the project progress stages or the types of management. In addition, this career management plan is essential for construction managers to receive appropriate wages for their careers and competences. Therefore, this study proposes a classification system for the integration of career, work, and competency to promote effective career management.

  • PDF