Critical Success Factors of Large Design-Build Projects in Vietnam

  • Dang, Chau Ngoc;Le-Hoai, Long;Lee, Young-Dai
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.30-39
    • /
    • 2012
  • Design-build (D&B) has been broadly perceived as an effective project delivery method and become popular in the world. However, the implementation process of this innovative procurement method in Vietnam encounters difficulties due mainly to unfamiliarity and inexperience with the approach. Critical success factors (CSFs) which could be used to enhance the project execution are useful to practitioners in Vietnam if identified. A questionnaire survey was employed to identify CSFs of D&B projects in Vietnam. Parties' competence, especially financial capability, and contract documentation are the most important factors significantly affecting project success. It was also shown that the perspectives of two principal parties in D&B projects on the CSFs are statistically correlated. The identified CSFs were then validated with some various D&B projects. The execution results of CSFs' were compared with the projects' performance measured try key performance indicators (KPIs). The most important success factors of this study were also compared with other countries'. The validation and comparison results provide project participants with some useful information to perform D&B projects better. Practitioners should well perform the identified CSFs to enhance the chance of the success of D&B projects in Vietnam. The findings of this study are useful not only to Vietnamese practitioners but also to others who are concerned about D&B method and plan to employ it in Vietnam in future.

A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises (중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안)

  • Oh, Joseph;Kim, Bo-Hyun;Baek, Jae-Yong;Jung, So-Young;Choi, Young-Jae
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

An Overview of Time Estimation in the Appraisal of Completeness for Software

  • Kim, Yukyong
    • Journal of Software Assessment and Valuation
    • /
    • v.16 no.1
    • /
    • pp.21-26
    • /
    • 2020
  • The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.

Development of ROS2-on-Yocto-based Thin Client Robot for Cloud Robotics (클라우드 연동을 위한 ROS2 on Yocto 기반의 Thin Client 로봇 개발)

  • Kim, Yunsung;Lee, Dongoen;Jeong, Seonghoon;Moon, Hyeongil;Yu, Changseung;Lee, Kangyoung;Choi, Juneyoul;Kim, Youngjae
    • The Journal of Korea Robotics Society
    • /
    • v.16 no.4
    • /
    • pp.327-335
    • /
    • 2021
  • In this paper, we propose an embedded robot system based on "ROS2 on Yocto" that can support various robots. We developed a lightweight OS based on the Yocto Project as a next-generation robot platform targeting cloud robotics. Yocto Project was adopted for portability and scalability in both software and hardware, and ROS2 was adopted and optimized considering a low specification embedded hardware system. We developed SLAM, navigation, path planning, and motion for the proposed robot system validation. For verification of software packages, we applied it to home cleaning robot and indoor delivery robot that were already commercialized by LG Electronics and verified they can do autonomous driving, obstacle recognition, and avoidance driving. Memory usage and network I/O have been improved by applying the binary launch method based on shell and mmap application as opposed to the conventional Python method. Finally, we verified the possibility of mass production and commercialization of the proposed system through performance evaluation from CPU and memory perspective.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

Improving Maintenance Management Practices for Building Facility

  • Ismail, Zul-Atfi
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.21-32
    • /
    • 2014
  • The practiced conventional methods for maintenance management in Malaysian Polytechnic faced many issues due to poor service delivery, inadequate finance, poor maintenance plan and maintenance backlogs. The purpose of this study is to improve the conventional method practices which tend to be ineffective in Malaysian Polytechnic. The case studies were conducted with eight Polytechnics and are selected based on conventional method practices and its major problems. There are around 32 Polytechnics in Malaysia and almost are using conventional methods. The number is considered very big indicating that the use of modern Information and Communication Technology (ICT) is still very limited compared to other institutions of higher learning in Malaysia. The overall findings of this research indicated; poor service delivery, inadequate financial, poor maintenance planning and maintenance backlogs. There is also need to overcome less man power competencies of maintenance management practices which existed with all eight Polytechnics. The proposed system is intended to be used for maintenance management practices at Malaysian Polytechnics in order to provide high-quality of building facility with safe and healthy environments.

A Study of the Construction Contracts and Delivery System for Nuclear Power Plant (원전건설 발주 및 계약체계에 대한 고찰)

  • Seo, Yong-Tok;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.233-235
    • /
    • 2012
  • Continually having growed up overseas construction market for new Nuclear Power Plant(NPP), the exports of Korean Reactor emerges as the key task of National Nuclear Business. The objective of this study is to strengthen the competitiveness of Korean Reactor through the improvement of Construction Project Contract & Delivery System for NPP. This study suggests the method for increasing Korean Reactor's competitiveness of exports by analyzing the business environment of foreign market and comparing Contract & Delivery System between domestic and foreign.

  • PDF

BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client (발주처 관점의 시설물 생애주기 관리를 위한 BIM 기반 건설 프로젝트 사례 분석)

  • Ham, Nam-Hyuk;Kim, Woong-Gi;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.12-21
    • /
    • 2020
  • From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.

Decision Making Model for a Public Construction Project Delivery Method Selection based on Analytic Hierarchy Process (AHP를 이용한 공공공사 입찰 방식 의사결정지원 모델)

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.559-566
    • /
    • 2017
  • The bidding method of public works is decided based on the experience of the officials in charge and the convenience of the work, but the validity of decision making process for the bidding method has not been verified. Another challenge in the bidding method selection is its objective validation is not easy because the decision making is based on experience, when a new type of project is ordered or a new bidding method is applied In this study, therefore, a decision making model to facilitate the selection of a public construction project delivery method was developed and examined with its applicability. This model was developed using the Analytic Hierarchy Process and was verified through 32 persons who were actually in charge of the works. As a result of applying this model, 5 of the 32 persons showed consistency in using the model. and they expressed positive opinions about the model. The model can provide a guide while recognizing the fact that they cannot depend entirely on the model. Therefore, the model proposed in this study is expected to reduce the work-related burden of the persons who are involved in the related work and help the objective performance of their tasks when a new bidding method or project appears in the future.