Critical Success Factors of Large Design-Build Projects in Vietnam

  • Dang, Chau Ngoc (University of Technology, National University of Hochiminh City) ;
  • Le-Hoai, Long (Faculty of Civil Engineering, University of Technology, National University of Hochiminh City) ;
  • Lee, Young-Dai (Dept. of Civil and Construction Engineering, Pukyong National University)
  • Received : 2012.07.15
  • Accepted : 2012.08.08
  • Published : 2012.09.01

Abstract

Design-build (D&B) has been broadly perceived as an effective project delivery method and become popular in the world. However, the implementation process of this innovative procurement method in Vietnam encounters difficulties due mainly to unfamiliarity and inexperience with the approach. Critical success factors (CSFs) which could be used to enhance the project execution are useful to practitioners in Vietnam if identified. A questionnaire survey was employed to identify CSFs of D&B projects in Vietnam. Parties' competence, especially financial capability, and contract documentation are the most important factors significantly affecting project success. It was also shown that the perspectives of two principal parties in D&B projects on the CSFs are statistically correlated. The identified CSFs were then validated with some various D&B projects. The execution results of CSFs' were compared with the projects' performance measured try key performance indicators (KPIs). The most important success factors of this study were also compared with other countries'. The validation and comparison results provide project participants with some useful information to perform D&B projects better. Practitioners should well perform the identified CSFs to enhance the chance of the success of D&B projects in Vietnam. The findings of this study are useful not only to Vietnamese practitioners but also to others who are concerned about D&B method and plan to employ it in Vietnam in future.

Keywords

References

  1. C. Ameyaw, "Comparative performance evaluation of the traditional design-bid-build (DBB) and design-build (DB) procurement methods in Ghana", Master Thesis, University of Science and Technology, Kwame Nkrumah. available at: http://dspace.knust.edu.gh/dspace/handle/123456789/1173, 2009. (accessed March 2011).
  2. D. Baccrini, "The logical framework method for defining project success", Project Management Journal, vol. 30, no. 4, pp. 25-32, 1999.
  3. A.P.C. Chan, "Framework for measuring success of construction projects", Report 2001-003-C-01, available at: http://eprints.qut.edu.au/26531/, 2001. (accessed March 2011).
  4. A.P.C. Chan, D.K.C. Ho, C.M. Tam, "Design and build project success factors: Multivariate anlysis", Journal of Construction Engineering and Management, vol. 127, no. 2, pp. 93-100, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:2(93)
  5. D.L. Fox, "FY06 MILCON dirtkicker sward criteria", MAJCOM/A7/A7C, HQ USAF/ILE, Wash, 2006.
  6. D.R. Hale, P.P. Shrestha, G.E. Gibson, G.C. Migliaccio, "Emprirical comparison of design/build and design/bid/build project delivery methods", Journal of Construction Engineering and Managemet, vol. 135, no. 7, pp. 579-587, 2009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000017
  7. M. Konchar, V. Sanvido, "Comparison of U.S. project delivery systems", Journal of Constructiion Engineering and Management, vol. 124, no. 6, pp.435-444, 1998. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(435)
  8. E.W.M. Lam, A.P.C. Chan, D.W.M. Chan, "Benchmarking design-build procurement systems in construction", Benchmarking: An International Journal, vol. 11, no. 3, pp. 287-302, 2004. https://doi.org/10.1108/14635770410538763
  9. E.W.M. Lam, A.P.C. Chan, D.W.M. Chan, "Determinants of successful design-build projects", Journal of Construction Engineering and Management, vol. 134, no. 5, pp. 333-341, 2008. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:5(333)
  10. L. Le-Hoai, Y.D. Lee, J.Y. Lee, "Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries", KSCE Journal of Civil Engineering, vol. 12, no. 6, pp. 367-377, 2008. https://doi.org/10.1007/s12205-008-0367-7
  11. L. Le-Hoai, Y.D. Lee, J.J. Son, "Partnering in construction Investigation of problemtic issues for implementation in Vietnam", KSCE Journal of Civil Engineering, vol. 14, no. 5, pp. 731-741, 2010. https://doi.org/10.1007/s12205-010-0916-8
  12. F.Y.Y. Ling, G. Ofori, S.P. Low, "Importance of design consultants' soft skills in design-build projects", Construction and Architectural Management, vol. 7, no. 4, pp. 389-398, 2000.
  13. F.Y.Y. Ling, "How project managers can better control the performance of design-build projects", International Journal of Project Management, vol. 22, no. 6, pp. 477-488, 2004. https://doi.org/10.1016/j.ijproman.2003.09.003
  14. F.Y.Y. Ling, M. Liu, "Using neural network to predict performance of design-build projects in Singapore", Building and Environment, vol. 39, no. 10, pp. 1263-1274, 2004. https://doi.org/10.1016/j.buildenv.2004.02.008
  15. K.R. Molenaar, A.D. Songer, "Model for public secto design-build project selection", Journal of Constructuion Engineering ad Management, vol. 124, no. 6, pp. 467-479, 1998. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(467)
  16. K.R. Molenaar, A.D. Songer, M. Barash, "Public-sector design/build evolution and performance", Journal of Management in Engineering, vol. 15, no. 2, pp. 54-62, 1999. https://doi.org/10.1061/(ASCE)0742-597X(1999)15:2(54)
  17. N.D. Nguyen, S.O. Ogunlana, D.T.X. Lan, "A study on project success factors in large construction projects in Vietnam", Engineering, Construction and Architectural Management, vol. 11, no. 6, pp. 404-413, 2004. https://doi.org/10.1108/09699980410570166
  18. J.W. Rosner, A.E.J. Thal, C.J. West, "Analysis of the design-build delivery method in Air Force construction projects", Journal of Construction Engineering and Management, vol. 135, no. 8, pp. 710-717, 2009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000029
  19. J.W. Rosner, A.E.J. Thal, C.J. West, "Anlaysis of the design-build delivey method in Air Force construction projects", Journal of Construction Engineering and Management, vol. 134, no. 8, pp. 710-717, 2009.
  20. V. Sanvido, F. Grobler, K. Pariff, M. Guvents, M. Coyle, "Critical success factors of construction projects", Journal of Construction Engineering and Management, vol. 118, no. 1, pp. 94-111, 1992. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(94)
  21. Z.P.E. Satterfield, "Design-build," The National Environmental Services Center, vol. 9, no. 2, pp. 1-4, 2009.
  22. J.E. Schaufelberger, "Success factors for design-build contracting", Journal of Construction Engineering and Manageent, Record, ASCE Conference Procurement, 2004.
  23. A.D. Songer, K.R. Molenaar, "Project characterstics for successful public-sector design-build", Journal of Cosntruction Engineering and Managemet, vol. 123, no. 1, pp. 34-40, 1997.
  24. A.D. Songer, K.R. Molenaar, G.D. Robinson, "Selection factors and susccess criteria for design-build in the U.S. and U.K.", availablet:http://colorado.edu/engineering/civil/db/papers/usuk/, 1997. (accessed May 5 2010)
  25. B. Xia, A.P.C. Chan, J.F.Y. Yeung, "Identificaton of key competences of design-buiders in the construction market of the People's Republic of China (PRC)", Construction Management and Economics, vol. 27, no. 11, pp. 1141-1152, 2009. https://doi.org/10.1080/01446190903280476
  26. B. Xia, A.P.C. Chan, "Key competece of design-build clients in China", Journal of Facilities Management, vol. 8, no. 2, pp. 114-129, 2010. https://doi.org/10.1108/14725961011041161

Cited by

  1. Critical success factors for implementation process of design-build projects in Vietnam vol.14, pp.1, 2016, https://doi.org/10.1108/JEDT-04-2013-0029