• Title/Summary/Keyword: Project Cost Calculation

Search Result 106, Processing Time 0.026 seconds

A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Safety Management Cost Accounting for Underground Electric Power Transmission Facility Construction (전력구 설치 공사의 안전관리비 계상 기준에 관한 연구 )

  • Min Ho, Kim;Sung Woo, Shin
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.50-59
    • /
    • 2022
  • In the Construction Technology Promotion Act (CTPA) of the Republic of Korea, safety management cost is enforced as a statutory cost that must be included in the budget of construction projects. However, the construction of underground electric power transmission facilities (UEPTFs) is not included in the category of construction works defined in the CTPA. Consequently, the statutory safety management cost does not apply to the construction of UEPTFs. To overcome this limitation, the clients of UEPTF construction projects generally provide internal guidelines enabling the addition of the safety management cost in the project budget. Nevertheless, even after the execution of the internal guidelines, some important cost items are omitted from the budget owing to the incompleteness of the guidelines. In this context, this paper proposes a complete set of accounting items and their calculation methods for appropriate budgeting of the safety management cost of UEPTF construction projects. To this end, the current budgeting method of the safety management cost of UEPTF construction projects is analyzed, and a questionnaire study is performed to confirm the necessary cost items and their appropriate calculation methods. Based on the results of the questionnaire study, a set of accounting items and their calculation criteria for the budgeting of the safety management cost of UEPTF construction projects are proposed.

An Analysis on the Importance of the Risk Factors Considering the Reasons for the Increase of the Subcontract Construction Project Bid Cost (건설프로젝트 하도급 입찰금액 상승요인을 고려한 리스크인자의 중요도에 관한 분석)

  • Lee, Sung-Goo;Shin, Hyun-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.1 s.23
    • /
    • pp.63-70
    • /
    • 2007
  • The aims of this study are to draw the project risk factors by grasping the relation especially between the construction preparation cost calculation and the project risk factors in the project's bidding stage, and to draw the cost estimate based on the risk when the orderer or the constructer performs the project and the main factors in calculating the most suitable construction cost by clarifying the understanding degree of the influence between the risk factors and the construction cost. In addition, this study can give a help to the proper decision -making through the prediction of the construction preparation cost, and this study is expected to give the basic data in developing the assessment tool for the most suitable construction cost of the project.

Cost Calculation of the Implementation Project for the Management of Total Maximum Daily Loads (수질오염총량관리 시행계획 이행평가 사업의 대가산정 방안에 관한 연구)

  • Kim, So Hee;Baek, Song Yi;Jung, Na-ria;Hyun, Jae-Myung
    • Ecology and Resilient Infrastructure
    • /
    • v.9 no.3
    • /
    • pp.174-182
    • /
    • 2022
  • The existing cost calculation standard for the implementation project to manage total maximum daily loads calculates cost by considering the area scale and the population based on the basic cost. This method renders it difficult to calculate cost when the detailed characteristics of a business are considered. Therefore, in this study, we proposed a costing method that applied the standard fee calculation, reflecting the area scale, a number of human and livestock, wastewater discharge facilities, etc. And, through the review of related order cases, the suitability of factors affecting the implementation project is verified and the appropriateness of the cost calculation method is verified.

An Estimation of the Standard Cost of Project Management of Empowerment Sector in Comprehensive Rural Village Development Project (일반농산어촌개발 지역역량강화사업비의 적정요율 산정)

  • Choi, Young-Wan;Park, Hyun-Yong;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.3
    • /
    • pp.131-144
    • /
    • 2013
  • The existing standard cost of project management of empowerment sector in general rural development project has problems with standard cost system without considering characteristics of empowerment project and unclear division of works. These problems are a lot of trouble to fulfill the project. Thus, it needs an arrangement of standard cost considering detailed characteristics of project management in the empowerment sector. The contents and results of this study can be summarized as follows. 1) To set accurate standard cost, we carried out three-step processes, such as elicitation of standard works, calculation of workload and determination of standard cost. (1) In an investigation of 30 rural area dividing 8 parts about an workload of empowerment project, an average workload is 1,499 hours. (2) Based on this results, the standard cost is calculated at 15% of project cost in over 600 million won, at 28.75% of project cost in under 500 million won, by standards of empowerment project cost. 2) It set the responsibility management cost to 15% of empowerment project cost considering existing awareness, workload and work professionalism of project management. Based on the results, It suggested the practical use as basis for efficient management of the future empowerment projects. To achieve this, It needs to promote maximizing results on the whole project through the legalization processes including amendment of existing regulations.

Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project (장기계속계약공사의 공기연장 추가간접비 산정 개선방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.30-37
    • /
    • 2017
  • In Korea, additional indirect costs generated from the time period extension of public construction projects have been studied. Practical claims against such costs are increasing. There are no clear criteria for calculating the delay cost caused by the extension, and thus calculation methods differ across entities. Logical valid calculation methods have also not been researched. Further, there are no Korean studies on the additional indirect cost caused by a suspension in a public construction project on a long-term continuing contract. The purpose of this research is to propose a method of calculating the indirect cost incurred by construction time extension that reflects the characteristics of Korean public construction projects. The cost patterns generated during construction periods were analyzed, and then the current criteria of calculating the indirect costs caused by the extension were examined. Following this, actual conditions and practices in the field were surveyed and the current calculation method was applied to a model case to compare the actual cost and that determined from the current calculation method. Issues with the current method were identified by this comparison. Based on this, this research proposes a method of calculating the total actual cost caused by a suspension in a public construction project that is appropriate for calculating the additional indirect cost generated by a suspension in a public construction project on a long-term continuing contract.

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob;Kim, Doo-Young;Hwang, Kwang-Won;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.2
    • /
    • pp.119-125
    • /
    • 2017
  • Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.