PMO의 제반 역할의 중요성에 대한 PM과 PMO의 인식 차이 (Differences in the Perceptions of PMs and PMOs on the Importance of the Role of PMO)

  • 윤태호;최성욱;김수연;김대철
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.207-213
    • /
    • 2021
  • Recently, the number and scale of projects being carried out within the enterprise are increasing. Accordingly, many companies are competitively introducing a Project Management Office (PMO) to efficiently manage these projects, allocate resources, and effectively link the projects and corporate strategies. However, the project manager who directly manages the project wants to receive support from the PMO in many areas for successful project management, but the project manager does not like to be interfered with by the PMO. On the other hand, the PMO may not be able to satisfy all the requirements of each PM as PMO oversees the entire project with limited resources. In addition, since the PMO must monitor and control the project and support the project according to the priorities of each project, conflicts with each PM can be formed. Therefore, in this study, based on the case of a company, the difference between the perceptions of PMs and PMOs about the importance of the required roles of PMOs is to be examined. As a result of the study, it was confirmed that the core functions and sub-functions of PMO, which PMO members and PMs consider important, are different. It was identified that the PMs valued the PMO function that would be helpful for their successful project execution. On the other hand, PMO members revealed that they had a relatively high priority for the roles to monitor and control project performance for which they were directly responsible.

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF

국제적(國際的) 건축(建築) 전문교육(專門敎育) 인증기준(認證基準)에서 본 한국(韓國) 건축교육(建築敎育)의 현황분석(現況分析) (A Critical Analysis on the Architectural Education in Korea from the view of International Accrediting Criteria)

  • 류전희;이선영
    • 건축역사연구
    • /
    • 제8권3호
    • /
    • pp.75-89
    • /
    • 1999
  • Under the WTO system, global standardization of professionalism in architecture practice calls for transformation of curriculum in architectural education in Korea. This paper compares the curriculum standards of international accrediting authorities such as NAAB and RIBA based on UIA accord which defines fundamental knowledge and abilities of an architect. As a result this paper extracts 51 achievement oriented criteria of architectural education in Korea. It can be categorized as communication, design, cultural context(history and theory, human behavior and social aspects), technical systems(structural systems, environmental control systems, construction material and assemblies) and practice(project process, project economics and business management, laws and regulations). Based on this recommended Korean curriculum standards, current curriculum is analyzed focusing on the 5 architectural programs in Seoul. Through this analysis, it became clear that some area - social and economic aspects in architecture, sustainability in architecture, understanding and selection of construction material, assemblies and environmental control system, recycling of existing building, professional liability, professional rules of conduct, project economics and project management - need to be covered and emphasized to meet the international standards in professional education in architecture. The result in this paper will be used as a basic data in the process of finding the direction of restructuring curriculum for professional architectural education in Korea.

  • PDF

구조물 진동제어장치 개발 및 최적 면진설계 시스템 개발 (Development of the vibration control devices and the optimal base-isolation design system for Structures)

  • 김병현;정정훈;문석준;허영철;정종안
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2004년도 추계학술대회논문집
    • /
    • pp.375-380
    • /
    • 2004
  • Seismic Isolation and Shock/vibration Control Laboratory has performed the National Research Laboratory(NRL) project, 'Design and Application of Control Devices against Earthquake/Shock/Vibration'. In this project, the prototypes of the vibration control devices for structural control against earthquake and wind were developed and verified their performances. And also, the computer programs were developed for the seismic response analysis and the optimum design of the base-isolated structures with vibration control devices. This paper introduces the developed vibration control devices and computer programs.

  • PDF

고속전철 제동장천 개념설계에 관한 연구 (Conceptual Design of Braking System in High-Speed Train)

  • 강도현;김용주;곽수태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 A
    • /
    • pp.342-345
    • /
    • 1997
  • To achieve adequate brake performance in high-speed trains the brake system should : ${\bullet}$ offer high reliability and high availability, ${\bullet}$ permit deceleration of the train with as little wear as possible, and ${\bullet}$ display good control characteristics with, if possible, infinitely variable control of the braking effort. For these reasons, high-speed train is to be equipped with three different and largely independent brake system : ${\bullet}$ a regenerative brake with regenerative feedback in the driven cars, ${\bullet}$ a linear eddy-current brake in the nondriven cars and ${\bullet}$ a pneumatic disc brake in all cars. This paper describes the conceptual design of braking system for Korea High Speed Train with the maximum speed of 350km/h

  • PDF

Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • El-Maaty, Ahmed Ebrahim Abu;El-Hamrawy, Saad;Akal, Ahmed Yousry
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권4호
    • /
    • pp.7-14
    • /
    • 2016
  • While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.

원자력발전소 Work Breakdown Structure 개발 (Development of Work Breakdown Structure for Nuclear Power Plant)

  • 조영혁;양명덕
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

철도안전시스템에 적용한 시스템 엔지니어링 관리 계획 작성사례 연구 (A Study on the Systems Engineering Management Plan for the Railway Safety System)

  • 최요철;박영원;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.64-69
    • /
    • 2005
  • The Systems Engineering Management Plan (SEMP) is the primary, top level technical management document for the integration of all engineering activities at the project plan phase. This document defined the activities to plan, control, and perform overall engineering integration. To develop the SEMP for Railway Safety System, several standards are reviewed and analyzed. And then a common requirement for SEMP preparation is derived from the results of analysis. Also, the SEMP example available practically applies to Railway Safety System. In particular, The SEMP focused on controling technical program management has been organized so far, but in this study the detailed contents of SEMP put stress on project management is derived. And it is related to each other between project management and technical engineering management. At the end, to continuously manage the items and contents of the SEMP, a database management and an automatic document generation system is presented using Computer-Aided Systems Engineering (CASE) tool.

  • PDF

캡스톤디자인으로 구현한 MS Azure 기반 IoT 시스템 (MS Azure based IoT system for a Capstone Design Project)

  • 최대우;최문근;김종우
    • 공학교육연구
    • /
    • 제22권1호
    • /
    • pp.55-60
    • /
    • 2019
  • This paper deals with the process and requirements of a capstone design project performed by undergraduate students. We discuss about the preliminary study for the capstone design, the derivation of a subject, the level descriptor of the subject, and the system requirements. And then, we summarize the results of the capstone design project entitled as Microsoft Azure based IoT (Internet of Things) system which is performed by 4 undergraduate students during 10 months. This system is composed of a Zigbee sensor network, the TCP/IP Internet, an IoT server, and a smartphone application program, with which we can gather the sensor data and control actuators at the far away area.

원전 디젤발전기 여자시스템 기기검증시험에 관한 연구(I) (The Study on Equipment Qualification of Emergency Diesel Generator Excitation Control System for Nuclear Power Plant (I))

  • 이주현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 심포지엄 논문집 정보 및 제어부문
    • /
    • pp.143-145
    • /
    • 2007
  • The development of excitation control system (ECS) for emergency diesel generator in nuclear power plant is the replacement project of existing control system to resolve the maintenance problems caused by aging and obsolescence, The excitation control system is classified as a safety-related system. To guarantee the performance of developing excitation control system is equal to or higher than that of other systems, establishing the quality assurance scheme, doing software verification and validation activities, and planning equipment qualification. In this paper, we'd like to introduce the equipment qualification of excitation control system.