International conference on construction engineering and project management
/
2005.10a
/
pp.935-940
/
2005
This paper presents the results of a statistical analysis using historical data of cost contingency. As a result, a model that predicts and estimates an accurate cost contingency value using the least squares estimation method was developed. Data such as original contract amounts, estimated contingency amounts set by maximum funding limits, and actual contingency amounts, were collected and used for model development. The more effective prediction model was selected from the two developed models based on its prediction capability. The model would help guide project managers making financial decisions when the determination of the cost contingency amounts for multiple projects is necessary.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.224-227
/
2004
As a project progresses, it is well known that construction manager has to define the contingency for the expected project cost, which is used as a buffer for uncertainty. In this study, we mention uncertainty as the amount of likelihood that is difficult or impossible to predict project cost. From the completed work package, we obtain the true cost value, and this information is technically good data for estimating the realistic contingency of work packages to be accomplished. Based upon this historical information, construction manager recomputes the contingency for the remaining works. Conditional probability theory is often useful for re-estimating one of the remaining project progress as the true cost of the completed works can be different from the planned cost. As a project is progressing, true value is really important to predict the realistic project budget and to decrease the uncertainty. In this study, we gave applied conditional probability theory to estimating project contingency supposing a project that consists of fire work packages, provide the fundamental framework for setting and controlling project contingency.
Risks, uncertainties, and associated cost overruns are critical problems for construction projects. Cost contingency is an important funding source for these unforeseen events and is included in the base estimate to help perform financially successful projects. In order to predict more accurate contingency, many empirical models using regression analysis and artificial neural network method have been proposed and showed its viability to minimize prediction errors. However, categorical factors on contingency cannot have been treated and thus considered in these empirical models since those models are able to treat only numerical factors. This paper identified potential factors on contingency in transportation construction projects and evaluated categorical factors using the one-way ANOVA statistical method. Among factors including project work type, delivery method type, contract agreement type, bid award type, letting type, and geographical location, two factors of project work type and contract agreement type were found to be statistically important on allocating cost contingency.
International conference on construction engineering and project management
/
2013.01a
/
pp.338-343
/
2013
Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.
Journal of Information Technology Applications and Management
/
v.13
no.2
/
pp.145-162
/
2006
Despite the careful attention paid by managers and researchers to the effective administration of the S/W Development Project, there are cases where the project goes over-budget or misses deadlines. Existing research blames these problems on task complexity or mismanagement. In order to verify the results that varied according to the fitness between the Task Characteristics and the Project Management Types, a contingency model was employed. The verification of the contingency model demonstrated that the greater the task complexity, the greater the effectiveness of the project coordination, and the lesser the task complexity, the greater the effectiveness of project control. This research is theoretically important in that it develops a composite model to verify the relation between the three factors of Task Characteristics, Project Management Types, and Project Performance that compose the S/W Development Project.
Journal of Korean Society of Industrial and Systems Engineering
/
v.39
no.1
/
pp.17-24
/
2016
Many organizations have transformed their business in order to survive and compete in the future. They generate projects by creating a vision, using strategies and objectives with funds aligning strategies and make efforts to complete them successfully because project success leads to business success. All projects have triple constraints such as scope, time, and cost to be completed. Project cost performance is a key factor to achieve project goals and which is mostly related with risks among various cost drivers. Projects require a cost estimation method to complete them within their budget and on time. An accurate budget cannot be estimated due to the uncertainties and risks. Thus some additional money should be funded in addition to the base budget as a contingency reserve for identified risks and a management reserve for unidentified risks. While research on contingency reserve for identified risks included in project budget baseline have been presented, research on management reserve for unidentified risks included in total project budget is still scarce. The lack of research on estimation method and role of the management reserve have made project managers little confidence to estimate project budget accurately with reasonable basis. This study proposes a practical model to estimate budgets including contingency and management reserves for not only project cost management but also to keep the balance of organization's total funds to maximize return on investments for project portfolio management. The advantages of the proposed model are demonstrated by its application to construction projects in Korea and the processes to apply this model for verification are also provided.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.05a
/
pp.72-73
/
2018
The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.
Proceedings of the Korean Institute of Building Construction Conference
/
2004.05a
/
pp.113-117
/
2004
We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.226-229
/
2003
Construction manager must consider the possibility on the failure of the project in advance and the contingency to provide against the situation, those of which is a dangerous condition not to predict. If they have a quick decision without understanding the contingency, the over-cost in the total cost would be continuously accumulated, and be a barrier at a project going in progress. A various risk could not be coped with at a time to decide either going or sloping the project until the contingency is applied from the first step to progress the project. But a case to apply the contingency to the construction for the investment or the analysis of the project is a little. The process to evaluate it is also absent. The propose of this paper is the followed ; To establish the total cost including the risk first of all, devide into plus or minus factor of the cost, and then the process to calculate the contingency must be suggested by the regression analysis.
International conference on construction engineering and project management
/
2007.03a
/
pp.106-118
/
2007
Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and also help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.