Concept and Issues in Supply Chain Management for Plant Engineering Project (플랜트 엔지니어링 프로젝트의 공급망관리 : 개념과 이슈)

  • Cheong, Heung Gyo;Park, Seong-Taek;Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.10 no.9
    • /
    • pp.213-224
    • /
    • 2012
  • Supply chain management for complex project focuses on planning acquisitions, identifying and choosing the right suppliers and subcontractors, planning and negotiating appropriate contracts, and administering and closing contracts. Working with suppliers and subcontractors requires continuous integration activities during project execution. This article examines the concept and issues concerning supply chain management in plant engineering Project, of which has not been taken seriously by industry. We propose the technological infra, social infra and information system connecting all participants in supply chain, as the major fields of research requiring industry attentions, and give a brief summary of research in each proposed areas.

Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.

  • PDF

IMPLEMENTATION OF TRL TOOLS TO KOREAN NATIONAL CONSTRUCTION AND TRANSPORTATION R&D PROJECTS FOR IMPROVING PRACTICAL USE

  • Namgyun Kim;Byungho An;Jaehong Choi;Hyunseok Lee;Sanghyuk Park;Yeasang Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.608-615
    • /
    • 2013
  • The major countries including Korea extend the national investment on R&D and implement the business performance diffusion policy as the knowledge based competition age arrives recently. The necessity for risk management and systematic management system for R&D achievement have been appeared to prevent the failure as the R&D scale becomes larger as it was said. For this matter, the organization such as NASA and DoD in USA defines the Technology Readiness Level (TRL) as a quantitative accomplishment management index and utilize the Technology Readiness Assessment (TRA) system as a criterion. Such tool is evaluated as very effective in the R&D project purposed the practicalization. It is expected that the disadvantage of evaluation system which is oriented to the academic accomplishment in its contents of current research and to contribute greatly to the practicalization of outcomes when such technology readiness level concept is applied to Korean national construction and transportation R&D project. Accordingly, this study analyzed the concept of TRL·TRA, the characteristics and current evaluation management system of Korean national construction and transportation R&D project and suggested the construction and transportation R&D project TRL·TRA performance model to accomplish the practicalization purpose.

  • PDF

TOWARDS A RELATIONAL CONTRACTING FRAMEWORK IN THE AUSTRALIAN CONSTRUCTION INDUSTRY: AN INITIAL FRAMEWORK

  • Melissa Chan;Bambang Trigunarsyah;Vaughan Coffey
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.117-123
    • /
    • 2011
  • The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

  • PDF

An Establishment the Work Breakdown Structure for Owners in the Multi-Complex Project (입체·복합 프로젝트에서 발주자 중심의 WBS 구축방향)

  • Ko, Dae-Jun;Choi, Eun-A;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.127-131
    • /
    • 2008
  • The successful project management is based on definition of project goals in construction industry. The WBS(Work Breakdown Structure) is one of the major factors which defines works related to project goals. The necessity of the WBS for owners in multi complex projects which would help them to understand the whole project is rising because the multi-complex project in the construction industry has increasing recently. Therefore, this study suggests directions to establish the WBS for owners through investigating a concept of the multi-complex project first and analyzing types of project, domestic and foreign WBS, and case studies.

  • PDF

APPLICATION OF PROJECT MANAGEMENT: LEAN TECHNOLOGIES AND SAVING MANUFACTURING (ASPECTS OF MANAGEMENT AND PUBLIC ADMINISTRATION)

  • Kulinich, Tetiana;Berezina, Liudmyla;Bahan, Nadiia;Vashchenko, Iryna;Huriievska, Valentyna
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.5
    • /
    • pp.57-68
    • /
    • 2021
  • Successfully adapting to digital and customer-oriented transformation, the concept of lean manufacturing professes the philosophy of creating greater benefit while minimizing losses. These losses are operations that do not add value in the production process to ensure the efficiency, flexibility, and profitability of projects. In the context of broad automation and digitalization of all sectors of the economy, mechanisms for combining automation technologies and lean production are becoming available. Moreover, when it comes to the efficient use of financial, human, or material resources, it is clear that the use of Industry 4.0 technologies can be an effective tool for achieving the goals of lean production, as many of them pursue the same goal. In this context, this article aims to study the effectiveness of the implementation of project management concepts at the global level and identify the main factors influencing its effectiveness to ensure the achievement of lean production through LEAN technologies and Industry 4.0 technologies. To achieve this goal, several statistical indicators were selected and several statistical methods of analysis were used: pairwise correlation, regression analysis, methods of comparison, synthesis, and generalization. Statistical analysis was conducted according to a survey conducted by the Project Management Institute (PMI) in 2020. An economic-mathematical model of dependence of project effectiveness in different regions of the world on the level of implementation of project management approaches is built, which shows that the increase in project effectiveness by 85% is due to financial losses, technical training, and consumer orientation. These results allow project managers to develop appropriate strategies to improve project management approaches at all levels. It is established that LEAN technologies and technologies of Industry 4.0 have several tools that have a positive effect on minimizing losses following the concept of lean production. Besides, given that the technology of Industry 4.0 is focused on the automation of Lean Production technology, a mechanism for the introduction of lean production using these technologies and methods.

The Effects and Development of Project-Based STEAM Program (프로젝트 기반 STEAM 프로그램 개발 및 적용 효과)

  • Lee, Sang-Gyun;Lee, Ha-Lyong
    • Journal of the Korean Society of Earth Science Education
    • /
    • v.6 no.1
    • /
    • pp.78-86
    • /
    • 2013
  • The purpose of this study is to analyze the effects of the Project based STEAM program on primary students' Problem solving process and creative personality. Based on the concept of project based learning and STEAM derived from a literature review, a learning program has been developed and applied to 28 elementary 4-6th students. Problem Solving Process and Creative personality tests were conducted before and after Project based STEAM program lessons. The results of this study are as follows. (1)Project-based STEAM was affected all components of problem solving process. (2) Project-based STEAM was affected all eight components of creative personality positively, (3) after using Project-based STEAM was good reaction by students. As a result, the elementary science class with Project-based STEAM had problem solving process for positive educational effect and creative personality. it means the science class with creative personality has potential possibilities and value to develop problem solving process and creative personality.

A Study on Preconstruction Process in Support of Lean Project Delivery System - Case Study of Children's Hospital at Bellevue, Wa, U.S.A. - (린 건설 관리 방식의 공사 전 설계 진행에 관한 연구 -미국 벨뷰 어린이 병원 사례 조사-)

  • Kim, Yong-Woo;Kim, Kwang-Ho
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.14 no.4
    • /
    • pp.47-54
    • /
    • 2008
  • Preconstruction process in a lean project delivery system was studied in one large healthcare project working for a general contractor. Researchers joined a new lean delivery project for approximately six weeks and participated in preconstruction process including design coordination, management coordination, and target costing while concurrently interviewing other project participants and employees, recording activity in meetings, and otherwise observing the process. The preconstruction process in lean project delivery system, called integrated project design, showed many benefits such as brining expertise of downstream players (i.e., mechanical and electrical contractors) into the design phase. However, lack of leadership and lack of design-integrator blocked the successful application of a new concept of design process.

  • PDF

A Study to improve old water supply facilities in Airforce Base through the Smart Water management vs WASCO Project (스마트 물관리 시스템과 WASCO 사업을 통한 공군기지 노후 상수도 개선사업의 실증 연구)

  • Park, Sung-Su;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.4
    • /
    • pp.53-64
    • /
    • 2020
  • The purpose of this study is to analyze outcome of the project to improve old water supply facilities in Airforce Base to improve water revenue rate. To achieve the objective of this study, First, literature review is conducted to clearly define the concept of water revenue rate improve project. Second, WASCO project on 2 Airforce base review and smart water management pilot project on 1 Airforce base is conducted. Third, economical analysis of project is conducted to examine the outcome. As a result, WASCO and smart water management pilot project on Airforce base was effective to improve water revenue rate. Finally, the improvements were suggested after investigating the key factors on water revenue rate improve project. In the future, this study will be used as a baseline for developing water revenue rate improve project.

Conceptual Design of 100 MWe Oxy-coal Power Plant-Youngdong Project (100 MWe 순산소 석탄연소 발전시스템의 개념설계-영동 프로젝트)

  • Choi, Sangmin
    • Journal of the Korean Society of Combustion
    • /
    • v.17 no.3
    • /
    • pp.30-45
    • /
    • 2012
  • An existing unit of power plant is considered to refurbish it for possible application of carbon capture and storage(CCS). Conceptual design of the plant includes basic considerations on the national and international situation of energy use, environmental concerns, required budget, and time schedule as well as the engineering concept of the plant. While major equipment of the recently upgraded power plant is going to be reused, a new boiler for air-oxy fired dual mode operation is to be designed. Cryogenic air separation unit is considered for optimized capacity, and combustion system accommodates flue gas recirculation with multiple cleaning and humidity removal units. The flue gas is purified for carbon dioxide separation and treatment. This paper presents the background of the project, participants, and industrial background. Proposed concept of the plant operation is discussed for the possible considerations on the engineering designs.