• Title/Summary/Keyword: Project Completion Performance

Search Result 76, Processing Time 0.027 seconds

A study on Development of train performance analysis model for the high-speed electric multiple unit 400km/h experimental (차세대 고속열차 성능해석 모델 개발)

  • Lee, Tae-Hyung;Park, Choon-Soo;Kim, Young-Guk;Choi, Sung-Hoon;Kim, Sang-Soo;Han, In-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.524-528
    • /
    • 2008
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperimental) project starts in 2007. It is required to analysis and simulate the train performance throughout the project life cycle for a successful completion of the project. This paper is devoted to the development of a train performance analysis model for the high-speed electric multiple unit 400km/h experimental. The model consist of running resistance model, train model, traction model and braking model. So, this paper represents the results of the train performance analysis.

  • PDF

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

A Study for Verification of the Performance Index Model of EVMS in Credible Interval (신뢰구간상에서 EVMS 성과지수모델의 검정에 관한 연구)

  • Kang Byung-Wook;Lee Young-Dai;Park Hyuk;Chun Yong-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.478-481
    • /
    • 2002
  • In these days, Cost and Scheduling was managed effectively because of introduction of EVMS to construction project. However the EVMS is appropriate methods to advanced country, so it is difficult to apply into domestic construction project. in this paper weighted value n, m was used of compositive index(CI) to forecast Estimate At Completion (EAC) using statistical analysis in credible interval the objective of this paper is to verify compositive index(CI) and to forecast Estimate At Completion (EAC).

  • PDF

Design of maturity model for software project management level evaluation (소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.4
    • /
    • pp.609-615
    • /
    • 2011
  • In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.

Study on the Influence of Stakeholders in Construction Projects

  • Rajeev, S.;Kothai, P.S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.8-11
    • /
    • 2014
  • The interactions and interrelationships between stakeholders largely determine the overall performance of a construction project, and have the crucial responsibility for delivering a project to successful completion. An important component of stakeholder management is stakeholder analysis. Two case studies are conducted within Kerala (India). The main objective was to carry out stakeholder analysis using stakeholder organiser deluxe software, considering the data's collected from the project execution team using questionnaire. During data collection the key stakeholders were identified, to know how to manage them, their interest, power, attitude level etc, for quality improvement. Analyze the results using the software Stakeholder organizer deluxe and modeling of stakeholders is to be done. Finally validate the models of the projects. These findings may mainly reflect the stakeholder management environment in the respective regions of project implementation.

Introduction of Detailed Design of Rach Gia Bypass Project in Vietnam (기술사마당_기술해설 - 베트남 락지아(Rach Gia) 우회도로 사업 실시설계소개)

  • Kang, Hee-Chul
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.4
    • /
    • pp.44-49
    • /
    • 2010
  • Th Rach Gia Bypass Project, to be implemented under EDCF Loan VNM-12, constitutes a strategically important part of the Greater Mekong Sub-region Southern Coastal Corridor Project(the GMS-SCCP). The main goal of the GMS strategy is to promote sustainable economic growth, improve employment, and achieve poverty reduction by tapping the comparative advantages of Vietnam, Cambodia and Thailand. As a project manager who once took a responsible position for the completion of RGBP's detailed design, I would like to briefly introduce what our design team including the local sub-contractors had performed for the D/Design of this Project last year, especially in the field of highway, bridge and soft soil treatment method widely used in Mekong Delta area. With the performance of nearly two Projects due to the V.O. in one year on the prescribed time, it was a hard year but a rewarding one. To expand our horizon more about overseas projects, several recommendations for the brighter future of overseas projects are shown herein this paper.

  • PDF

A Study on Mega-Y Project Innovation Activities (대형 혁신과제 추진방법에 대한 연구)

  • Sung, Su-Gyeong;Kim, Joon-Seok;Byun, Jai-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.4
    • /
    • pp.531-539
    • /
    • 2010
  • Mega-Y project is very important for a company to gain a competitive advantage in markets or to achieve drastic change in the internal processes. It stems from the company strategy and annual management goals or key performance measures, and is proceeded by the cross-functional team. This paper presents the success factors and implementation process of the Mega-Y projects. The implementation process is presented in 5 steps, including project selection, cross-functional team building, establishment of the master plan, development and execution of sub-projects, and project completion. A case study on the cost reduction project of aircraft development is presented to help for the practitioners to deploy the implementation process introduced in this paper.

Study on the Analysis of Domestic Construction Management Orders

  • Park, Jongsoon;Lee, Keunwon;Ann, Kyunghwan;Shin, Changhyun;Cho, Jaeho;Chun, Jaeyoul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.387-391
    • /
    • 2015
  • Currently, there is insufficient research on the construction management performance since the CM system was introduced in Korea. For successful completion of construction projects, active use of construction mangers on projects is necessary by introducing construction management to the projects. In view of this, this study analyzed the annual CM performance from 1996 to 2013 but for the past 5 years from 2009 to 2013, a detailed analysis was carried out. For different sectors, CM performances were divided into public and private sectors, for project types, construction, civil and others, for project phases, pre-design, design, construction and post-construction phases, for contract types, sole and joint contract types, for project scale, the amount of the projects was taken into consideration and they were divided into large, medium and small scales and for the types of projects, they were divided into, shops, department stores, shopping centers, hospitals, government buildings, hotels, accommodation facilities, factories, buildings for workshops, office buildings, stadiums, playgrounds, schools and other construction types and all the data divided into such categories was analyzed. The results in this study can be used as a basic reference for studies in analysing construction management performances.

  • PDF

Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects (하수관거정비 BTL사업의 효과분석 및 방안 수립 연구)

  • Song, Ho-Myeon;Cho, Jeong-Il;Ahn, Choong-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.6
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.

Buffer Management Method for Multiple Projects in the CCPM-MPL Representation

  • Nguyen, Thi Ngoc Truc;Takei, Yoshinori;Goto, Hiroyuki;Takahashi, Hirotaka
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.4
    • /
    • pp.397-405
    • /
    • 2012
  • This research proposes a framework of buffer management for multi-project systems in the critical chain project management (CCPM) method, expressed in the form of max-plus linear (MPL) representation. Since time buffers are inserted in the projects for absorbing uncertainties in task durations and protecting the completion times, the proposed method provides a procedure for frequently surveying the rates of consumed buffers and the rate of elapsed times. Their relation expresses the performance of the projects which is plotted on a chart through the completed processes. The chart presents the current performance of the projects and their interaction, which alerts managers to make necessary decisions at the right time for managing each project and the entire multi-project system. The proposed framework can analyze the complex system readily, and it enables managers to make an effective decision on scheduling. The effectiveness of the framework is demonstrated through a numerical example.