Browse > Article
http://dx.doi.org/10.7232/iems.2012.11.4.397

Buffer Management Method for Multiple Projects in the CCPM-MPL Representation  

Nguyen, Thi Ngoc Truc (Department of Information Science and Control Engineering, Nagaoka University of Technology)
Takei, Yoshinori (Department of Electrical Engineering, Nagaoka University of Technology)
Goto, Hiroyuki (Department of Industrial and Systems Engineering, Hosei University)
Takahashi, Hirotaka (Department of Humanities, Yamanashi Eiwa College)
Publication Information
Industrial Engineering and Management Systems / v.11, no.4, 2012 , pp. 397-405 More about this Journal
Abstract
This research proposes a framework of buffer management for multi-project systems in the critical chain project management (CCPM) method, expressed in the form of max-plus linear (MPL) representation. Since time buffers are inserted in the projects for absorbing uncertainties in task durations and protecting the completion times, the proposed method provides a procedure for frequently surveying the rates of consumed buffers and the rate of elapsed times. Their relation expresses the performance of the projects which is plotted on a chart through the completed processes. The chart presents the current performance of the projects and their interaction, which alerts managers to make necessary decisions at the right time for managing each project and the entire multi-project system. The proposed framework can analyze the complex system readily, and it enables managers to make an effective decision on scheduling. The effectiveness of the framework is demonstrated through a numerical example.
Keywords
Max-Plus Linear System; Critical Chain Project Management; Time Buffers; Multiple Projects; Buffer Management; Fever Chart;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Cohen, I., Mandelbaum, A., and Shtub, A. (2004), Multiproject Scheduling and Control: A process-based comparative study of the Critical Chain Methodology and Some Alternatives, Project Management Journal, 35(2), 39-50.
2 Goldratt, E. M. (1990), Theory of Constraints, North River Corp., Great Barington, MA.
3 Goto, H. (2010), Modelling methods based on discrete algebraic systems. In: Goti, A. (ed.), Discrete Event Simulations, Sciyo, Rijeka, Croatia, 35-62.
4 Heidergott, B. (2006), Max-Plus Linear Stochastic Systems and Perturbation Analysis, Springer, New York, NY.
5 Heidergott, B., Jan Olsder, G., and van der Woude, J. W. (2006), Max Plus at Work: Modeling and Analysis of Synchronized Systems, Princeton University Press, Princeton, NJ.
6 Herroelen, W., Leus, R., and Demeulemeester, E. (2002), Critical chain project scheduling: do not oversimplify, Project Management Journal, 33, 46-60.
7 Kasahara, M., Takahashi, H., and Goto, H. (2009), On a buffer management policy for CCPM-MPL representation, International Journal of Computational Science, 3(6), 593-606.
8 Leach, L. P. (2005), Critical Chain Project Management, Artech House, Boston, MA.
9 Takahashi, H., Goto, H., and Kasahara, M. (2009), Toward the application of a critical-chain-projectmanagement- based framework on max-plus linear systems, Industrial Engineering and Management Systems, 8(3), 155-161.
10 Truc, N. T. N., Goto, H., Takahashi, H., and Yoshida, S. (2011), Enhanced framework for determining time buffers in the MPL-CCPM representation, International Journal of Information Science and Computer Mathematics, 4(1), 1-18.
11 Truc, N. T. N., Goto, H., Takahashi, H., Yoshida, S., and Takei, Y. (2012), Critical chain project management based on a max-plus linear representation for determining time buffers in multiple projects, Journal of Advanced Mechanical Design, Systems, and Manufacturing, 6(5), 715-727.   DOI
12 Tukel, O. I., Rom, W. O., and Eksioglu, S. D. (2006), An investigation of buffer sizing techniques in critical chain scheduling, European Journal of Operational Research, 172(2), 401-416.   DOI   ScienceOn
13 Yoshida, S., Takahashi, H., and Goto, H. (2010), Modified max-plus linear representation for inserting time buffers, Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, Macau, China, 1631-1635.
14 Yoshida, S., Takahashi, H., and Goto, H. (2011), Resolution of time and worker conflicts for a single project in a max-plus linear representation, Industrial Engineering and Management Systems, 10(4), 279- 287.   DOI