• Title/Summary/Keyword: Project Completion Performance

Search Result 76, Processing Time 0.028 seconds

A Study on the Effect of Project Managers' Leadership on Participants' Individual Competency and Project Performance (프로젝트 관리자의 리더십이 참여자 개인 역량과 프로젝트 성과에 미치는 영향에 관한 연구)

  • Lee, Seol-Bin;Boo, Jeman;Kim, Seung-Chul
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.11 no.5
    • /
    • pp.175-188
    • /
    • 2016
  • This study is intended to look into the effects of project managers' leadership on participants' individual competency and project performance. To achieve this, a survey was empirically carried out to a sample of 276 researchers who are working on a project with a research and development group in private R&D centers. The results of this study were summarized as follows. First, the leadership competency of project managers had a significant positive effect on the individual competency of project participants. Second, the leadership competency of project managers had a significant positive effect on the project management performance. Third, the leadership competency of project managers had no significant effect on the project completion performance. Fourth, the individual competency of project participants had a significant positive effect on the project management performance. Fifth, the individual competency of project participants had no significant effect on the project completion performance. Sixth, the project management performance had a significant positive effect on the project completion performance. Seventh, the project completion performance was indirectly mediated in the effect of project managers' leadership competency on project completion performance. Eighth, the project management performance was indirectly mediated in the effect of project participants' individual competency on project completion performance. Based on the findings stated above, a combination of project management performance can generate better results in the effect of project participants' individual competency on project completion performance.

  • PDF

A Study on the Influence of SI Project Manager's Leadership Competencies and Project Participants' Individual Competencies on Project Performance (SI 프로젝트 관리자의 리더십 역량과 프로젝트 참여자 개인역량이 프로젝트 성과에 미치는 영향에 관한 연구)

  • Lee, Joong-Woo;Lee, Cheol-Gyu
    • Journal of Information Technology Services
    • /
    • v.21 no.4
    • /
    • pp.27-61
    • /
    • 2022
  • In order to improve project performance by analyzing the effects of the project manager's leadership competency and the individual competency of the project participants on the project performance, this study examines the effect. In this study, a research model and hypothesis were established to understand the causal relationship between leadership competency, individual competency, and project performance, and a survey was conducted based on this. Overall, it was found that the leadership competency of the project manager and the individual competency of the project participants had a positive effect on the project management performance, the project leadership competency had a positive effect on the completion performance, and the project participant individual competency had a negative effect on the completion performance. As a result of analyzing the effect of the project manager's core competency on the project management performance according to the amount or period of the project type, which is the moderating variable, it was found that there was no moderating effect on the management performance. For the success of the SI project, it is most important to understand the project characteristics well and select a PM suitable for the characteristics, and methods for nurturing excellent project managers should be further studied. In addition, it is expected that it will be possible to identify the effect of project manager leadership competency and participant competency on project performance based on sophisticated research design for more competent PM selection.

The Effect of Project Managers' Competences on Performance in Public S/W (공공 S/W 분야에서 프로젝트 관리자의 역량이 성과에 미치는 영향)

  • Oh, Minjeong;Ju, Hyoungjun;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.230-239
    • /
    • 2021
  • There is a growing interest in project management knowledge, project management information systems, and process improvement to systematically project execution in public sectors, achieve high performance and value, and increase the effectiveness of the overall industry. In particular, the software industry is a knowledge-intensive industry centered on professional manpower. This study examines the effect of the project managers' competences of regional SW promotion agencies on and project performance and the moderating effect of the level of project management maturity. We collected data using a questionnaire to the project managers of regional SW promotion agencies. In this study, a structural equation model was used to analyze the relationship between project managers' competences and performance. In addition, a multi-group structural equation model was used to analyze the moderating effect according to the high and low project maturity. As a result of the analysis, it was found that only contextual competence among the competences of the project manager had a positive effect on project performance. It was found that technical and behavioral competence did not have a positive effect on management and completion performance. It was found that the moderating effect according to the maturity of business management of local institutions was not significant.

A Study on Risk Analysis and Relevant Measures for the Successful Performance in Overseas Construction Projects - Including Case Analysis on A Overseas Construction Project - (해외건설 프로젝트의 성공적 수행을 위한 위험요소 및 대처방안에 대한 연구 - 해외건설 사례분석을 포함하여 -)

  • Kim, Sang-Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.50
    • /
    • pp.215-250
    • /
    • 2011
  • Korean won overseas construction projects worth 71.6 billion US Dollars in 2010, which exceeded that of 2009 by 45.6%. An overseas construction project is a transaction of large scale, long term project, many parties participating, deferred payment, and of high-technology. It contributes to foreign currency earning, and also leads the nation's export restructuring work towards high value-added one. There are various kinds of risks towards the relevant parties respectively, which are key elements in successfully performing the overseas construction project. There are completion risk, financing risk, operating risk, revenue risk etc, in an employer's place. A contractor may be confronted with payment risk, issuance risk of performance bond, financing risk, performance risk of sub-contractors, and exchange rate risk. In lenders place there are repayment risk, completion risk, and political risk in the host country. In order to mitigate risks, the parties shall take relevant measures or require relevant securities. A contractor needs to evaluate the credibility of an employer in respect of payment risk, and can also request export insurance cover by the Korea Trade Insurance Corporation(the former 'Korea Export Insurance Corporation"). An employer can require a contractor to provide performance bond in respect of completion risk, and employ a well-known first class bank as a mandated arranger to arrange financing with regard to completion risk. Lenders needs to evaluate the credibility of an employer and accomplish feasibility study of the project. Lenders can request insurance cover from export credit agency. Once the parties assess the respective risks and obtain relevant securities, the project will be successfully completed. The success of the project will be sure to bring the parties involved enormous profits and another opportunity to participate in overseas construction project afterwards.

  • PDF

A Study on the Application of PDCA Cycle for Performance Management of Promotion Project for Local Industry (향토산업육성사업의 성과관리를 위한 PDCA Cycle의 적용)

  • Son, Eun-Il;Hoshino, Satoshi;Song, Jung-Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.2
    • /
    • pp.139-148
    • /
    • 2013
  • This study verified for the necessity for the comprehensive analysis of outcomes resulting from the local industry promotion project in many respects. To analyze the operation planning for performance management of local industry promotion project, this study redesigns the so-called PDCA(Plan${\rightarrow}$Do${\rightarrow}$Check${\rightarrow}$Act) model which is also known as Deming Cycle and verifies some hypotheses. To accomplish study purposes, 169 response samples from 85 project groups which drive the local industry promotion project were verified using SPSS 12.0. The findings are as follows: First, there was a positive relationship between the planing phase and the implementation phase. Second, there was also a positive relationship between the implementation phase and completion of the project phase. Third, there was a positive relationship between the planing phase and completion of the project phase. Finally, the implementation phase was a partial mediator on the relationship between the planing phase and completion of the project phase. Based on these findings, the implications and the limitations of the research findings were discussed, and recommendations for future research were provided.

Study on the Operational Status of the Comprehensive Rural Village Development Project Completion Area - Focused on Sumun, Obong and Mopyeong Areas - (농촌마을종합개발사업 준공 권역의 운영 실태에 관한 고찰 - 수문·오봉·모평권역을 중심으로 -)

  • Yang, Won Sik;Choi, Young-Wan;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.30 no.1
    • /
    • pp.67-79
    • /
    • 2024
  • The Comprehensive Rural Village Development Project, a resident-led bottom-up regional development project, began in 2004. This study investigated difficulties and problems in the operation process after the completion of the project, and future improvement plans, through in-depth interviews with the former and current chairman of the steering committee, steering committee members, and office managers, targeting three regions in Jeollanam-do, 15 years after the completion of the project. As a result of the survey and analysis, it was effective in improving the living environment and characteristics of each village and revitalizing the area. And while there were well-run facilities depending on the type of project, there were also many idle facilities. In the case of communal facilities, there was a high possibility of problems in operation and management when the scale of the new building was large. Conflicts occurred between villages in the process of independently operating the area after the completion of the project. Therefore, it is necessary to provide an S/W project program to prepare for after completion. Local governments need to utilize City and County Capacity Enhancement Projects to support regional leaders to participate in educational programs after completion and provide guidance and supervision for village operations.

Impacts of PM's Leadership Type on Project Performance in PPP Project (PPP 사업에서 프로젝트관리자(PM)의 리더십유형이 프로젝트성과에 미치는 영향)

  • Hwang, Jae-Seung;Boo, Jeman
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.41-49
    • /
    • 2018
  • Recently, PPP (Public-Private-Partnership) Projects, which private companies invest in, plan, design, construct and operate, have become more popular around the world. The construction industry environment is becoming increasingly competitive. The PPP project is composed of various organizations, so it is very difficult to carry out the project successfully. In this environment, the construction companies are trying hard to secure a competitive advantage. In this study, we tried to identify the role of project manager's leadership and project citizenship behavior as a precedent for creating performance in PPP (Private-Public-Partnership) project. We examine the impact of PM's transformational leadership and transactional leadership on project citizen behavior and examine the impact of project citizen action on project management performance and completion performance. For this study, we conducted a questionnaire survey on PPP project participants. As a result, the following results were obtained. First, transformational leadership and transactional leadership had a significant influence on project citizenship behavior. Second, project citizen behavior had a significant impact on both project management performance and project completion performance. The idealized influence of transformational leadership and the Active management by exception of transactional leadership were found to be very important in shaping PPP team's project citizenship behavior. Therefore, this study has academic implications in studying the effects of PM leadership and project citizenship behavior on the performance of PPP project. And it is expected that it will help selection and training of PM to secure a competitive advantage for construction companies that implement PPP projects practically.

Global Project Finance Trends and Commercial Risk Analysis (글로벌 프로젝트 파이낸스 최근 동향 및 상업위험 분석)

  • Kim, Sang Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.61
    • /
    • pp.273-302
    • /
    • 2014
  • Project finance ("PF") is a method of raising long-term debt financing based on lending against the cash flow generated by the project alone. Project finance is a nonrecourse or limited recourse financing structure against the sponsors(or the investors). The debt terms in a project finance are not based on the creditor's credit support or on the value of the assets of the project. Lenders rely on the future cash flow to be generated by the project for debt repayment and interest, rather than the value of the project or the credit ratings of the sponsors. The non-recourse or limited recourse financing usually prompt potential project finance lenders to assess carefully all possible risks that might arise in a project to ensure that those risks are mitigated and controlled. In this respect, project finance is a opposite financing method of corporate finance. Project finance has rapidly grown over the last 20 years due to the worldwide process of privatization of public sector and development of natural resources. Global project finance volume reached the record USD 406.5 billion in 2011. In 2012, however, Global project finance volume dropped 6% to USD 382.3 billion. Infrastructure overtook Energy to lead all sectors with USD 113.6 billion. It is generally recognized that there are more and higher risks in project finance compared with corporate finance. Project finance is exposed to commercial risks as well as political risks. The main commercial risks are completion risks, environmental risks, operating risks, input supply risks, revenue risks, etc, and the main political risks are currency convertibility and transfer risks, expropriation risks, war and civil disturbance risks, risks of breach of government concession agreement, etc. Completion risks include permits risks, risks relating to the EPC Contractor, construction cost overrun, delay in completion, inadequate performance on completion, etc.

  • PDF

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

A Study on Advanced Analysis of Construction Project Performance Evaluation (건설사업 수행성과평가에 대한 분석 고도화 연구)

  • Kim, Kyong hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF