• Title/Summary/Keyword: Project Base System

Search Result 248, Processing Time 0.031 seconds

System Safety Program Plan for The Development of KHSR (고속전철 기술개발 안전 확보 계획)

  • 황희수;최강윤
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.288-295
    • /
    • 1998
  • In this paper the system safety program plan(SSPP) for the development of Korea high speed railway system was presented. The plan for the design phase built up base upon MIL-STD 882C, manual for the development of rail transit system safety program plans by American Public Transit Association, and SSPP for Seoul-Pusan High Speed Rail project should be modified and then applied to the phases of manufacturing, test and commissioning. The plan deals with the safety program, the reference standards, the management and responsibility for the safety related activities, the methods to be used for early identifying safety critical items and functions and eliminating or controlling all hazards in a timely and cost-effective manner, and the documentation generated for safety assessment.

  • PDF

A Study on the ITIL Management Model Based on the IT Governance for Public Sector (공공부분을 위한 IT 거버넌스 기반의 ITIL 관리 모델에 관한 연구)

  • Kim, Sang-Gil;Kim, Jin-Young;Park, Yeung-Gyu
    • Journal of Korea Multimedia Society
    • /
    • v.17 no.4
    • /
    • pp.490-505
    • /
    • 2014
  • IT governance in order to achieve the strategic goals of the organization, leadership, organizational structure, and the process is defined. In order to achieve IT governance, organizational structure, leadership for spindle formation, maintenance, and standardized processes to specific and an effective ITIL (Information Technology Infrastructure Library) management model is needed. In this study, the K Authority Management Model of IT Governance ITIL - based research on service delivery and customer satisfaction through the effective information for ITSM (Information Technology Service Management, IT Service Management) building measures, information for business planning and performance management PMS (Project Management System, project Management System), survey on ICT service levels established through the process of planning and construction management models such as ITIL future research on the public portion of the proceeds from the ITIL management model can be utilized as a guideline when establishing a theoretical presents a base.

Design and Implementation of Application Service Component for Reuse in Local Government's GIS (지방자치단체 지리정보시스템에서 재사용을 위한 응용 서비스 컴포넌트의 설계 및 구현)

  • Kim, Kwang-Soo;Cho, Dae-Soo;Kim, Do-Hyun;Choi, Hae-Ock
    • Journal of Korea Spatial Information System Society
    • /
    • v.3 no.1 s.5
    • /
    • pp.75-87
    • /
    • 2001
  • The advantages of using components result from their reusability between applications. Applications can be easily implemented by adding components. In this paper, we described the design and implementation process of ASC(Application Service Component) for component-based GIS applications. In our project, there are 5 applications : Road Facility Management, Urban Planning, Cadastral Map Management, Water Supply Management, and Sewerage Management. All of them use MapBase component which supports common GIS functionality. Although they are different applications, some parts of them are same. We analyzed the developed results in 1st and 2nd year, and the achievement of UIS(Urban Information System) project in Busan Metro City in Korea. The UIS of Busan was consisted of 5 applications to equal with our project. Then, we extracted 11 common used components between 5 applications, and implemented 5 common components of them and 2 additional components. They were Authority, GISReport, IndexMap, Measurement, Search, Symbol Manager, and Attribute Display. As we offered them to companies developing application components, they were able to reduce the development time.

  • PDF

Response modification factor of suspended zipper braced frames

  • Abdollahzadeh, Gholamreza;Abbasi, Mehdi
    • Steel and Composite Structures
    • /
    • v.18 no.1
    • /
    • pp.165-185
    • /
    • 2015
  • The suspended zipper bracing system is suggested to reduce the flaws of ordinary zipper braced and concentric inverted V braced frames. In the design procedure of suspended zipper bracing systems, columns and top story truss elements are strengthened. This bracing system show different performances and characteristics compared with inverted V braced and ordinary zipper frames. As a result, a different response modification factor for suspend zipper frames is needed. In this research paper, the response modification factor of suspended zipper frames was obtained using the incremental dynamic analysis. Suspended zipper braced frames with different stories and bay lengths were selected to be representations of the design space. To analyze the frames, a number of models were constructed and calibrated using experimental data. These archetype models were subjected to 44 earthquake records of the FEMA-P695 project data set. The incremental dynamic analysis and elastic dynamic analysis were carried out to determine the yield base shear value and elastic base shear value of archetype models using the OpenSEES software. The seismic response modification factor for each frame was calculated separately and the values of 9.5 and 13.6 were recommended for ultimate limit state and allowable stress design methods, respectively.

Constructing a Grand-Scale Korean Thesaurus as a Base for Ontology Development (대단위 우리말 온톨리지 구축을 위한 시소러스의 개발)

  • Choi, Suk-Doo;Lee, Woo-Bum;Kim, Lee-Kyum;Choi, Sang-Ki;Han, Sang-Kil;Lee, Jung-Yeoun
    • Journal of the Korean Society for information Management
    • /
    • v.23 no.4 s.62
    • /
    • pp.147-164
    • /
    • 2006
  • This paper reports an effort to construct a grand-scale Korean thesaurus that can be used for enhancing retrieval performance in various fields. This thesaurus is currently being used for indexing and retrieving purpose and new terms are being added to it. As the new demands on retrieval performance increase in Korea, developing a grand-scale ontology appears to be necessary so a project is undertaken to transfer the current thesaurus into an ontology system. The paper describes how the thesaurus is constructed and prepared to be the base for an ontology system.

Bhumipol Dam Operation Improvement via smart system for the Thor Tong Daeng Irrigation Project, Ping River Basin, Thailand

  • Koontanakulvong, Sucharit;Long, Tran Thanh;Van, Tuan Pham
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.164-175
    • /
    • 2019
  • The Tor Tong Daeng Irrigation Project with the irrigation area of 61,400 hectares is located in the Ping Basin of the Upper Central Plain of Thailand where farmers depended on both surface water and groundwater. In the drought year, water storage in the Bhumipol Dam is inadequate to allocate water for agriculture, and caused water deficit in many irrigation projects. Farmers need to find extra sources of water such as water from farm pond or groundwater as a supplement. The operation of Bhumipol Dam and irrigation demand estimation are vital for irrigation water allocation to help solve water shortage issue in the irrigation project. The study aims to determine the smart dam operation system to mitigate water shortage in this irrigation project via introduction of machine learning to improve dam operation and irrigation demand estimation via soil moisture estimation from satellite images. Via ANN technique application, the inflows to the dam are generated from the upstream rain gauge stations using past 10 years daily rainfall data. The input vectors for ANN model are identified base on regression and principal component analysis. The structure of ANN (length of training data, the type of activation functions, the number of hidden nodes and training methods) is determined from the statistics performance between measurements and ANN outputs. On the other hands, the irrigation demand will be estimated by using satellite images, LANDSAT. The Enhanced Vegetation Index (EVI) and Temperature Vegetation Dryness Index (TVDI) values are estimated from the plant growth stage and soil moisture. The values are calibrated and verified with the field plant growth stages and soil moisture data in the year 2017-2018. The irrigation demand in the irrigation project is then estimated from the plant growth stage and soil moisture in the area. With the estimated dam inflow and irrigation demand, the dam operation will manage the water release in the better manner compared with the past operational data. The results show how smart system concept was applied and improve dam operation by using inflow estimation from ANN technique combining with irrigation demand estimation from satellite images when compared with the past operation data which is an initial step to develop the smart dam operation system in Thailand.

  • PDF

Database PasS web service system using Docker

  • Hur, Tai-Sung
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.11
    • /
    • pp.51-58
    • /
    • 2020
  • Most of the students in computer-related departments work on projects, and it is essential to use a database for project execution. To use such a database, it is necessary to install a Database Management System. However, it takes several minutes (hours) to install a DBMS, and some DBMS require a difficult installation process. Therefore, in order to solve this problem, this study proposed a system that can easily install DBMS using Docker. Docker is an open source project that automates the deployment of Linux applications into software containers. Docker Container is wrapped in a complete file system that includes everything necessary for the execution of software, and includes code, runtime, system tools, system libraries, and anything that is installed on the server. This guarantees that they will always run the same regardless of the environment in which they are running. After creating a database using this proposed system, you can check the database access information on the web and check the server status in minutes. As a result of of implementing this proposed system and applying it to the projects of 10 teams, the installation time was reduced by 94.5% for Maria DBMS and 98.3% for Oracle DBMS than individual installation, confirming improved efficiency.

A Study on BOM System Constructing for Rolling Stock Maintenance (전동차 유지보수를 위한 BOM 체계 구축에 관한)

  • Son, Young-Jin;Lee, Kang-Won
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.195-200
    • /
    • 2007
  • The most important part of RIMS(Rolling Stock Information Maintenance System) project is to construct BOM(Bill of Material). BOM is a listing or description of raw materials, parts, and assemblies that define a product. To construct BOM for RIMS is not a easy task due to several reasons such as data base scale and flexibility, proper integration between physical BOM and functional BOM, interoperability with other systems, etc. In this study we show several principles that Seoul Metro takes to get over the difficulties mentioned above. Based on these principles we propose the methodology Seoul Metro employs to construct BOM efficiently. We also discuss the applicability of BOM in several fields.

A Study on the Decision Making Models for Evaluating the Priorities in the Army Facility Enterprise (군 시설사업 우선순위선정을 위한 의사결정모형에 관한 연구)

  • 정성환;이상헌
    • Journal of the military operations research society of Korea
    • /
    • v.27 no.2
    • /
    • pp.37-55
    • /
    • 2001
  • The main purpose of this study is to review the current system and to develop a decision support system for evaluating the priorities among those possible alternatives in the army facility enterprise. This paper also provides an information system which can be effectively applied to various criteria and stages in decision making process such as Planning and Programming phases in PPBEES. The model base of decision support systems uses the concepts of the analytic hierarchy process along with the supplementary techniques such as TOPSIS and 0-1 integer programming. Both AHP and TOPSIS are used scoring approaches in the Planning phase and IP is induced at the Programming phase to give GO/NO-GO solution for each project. We use Expert Choice, Excel and LINDO s/w's to implement a prototyped model. The proposed methodology in this paper enables the decision makers to evaluate the priority based on quantitative and qualitative data in a systematic way.

  • PDF

A Study on the Importances, Usages, and Contributions of IT system between Line and Project base processes (정보시스템의 중요도, 활용도, 기여도에 관한 제조업 현장인식에 관한 연구 - 공정간 차이에 대한 IPA 분석을 중심으로)

  • Hyun, Mincheol;Cho, BooYun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.5942-5954
    • /
    • 2015
  • IT system in supply chain management(hereafter, SCM) has been regarded as one of competitive advantage to win over competing supply chain. SCM participants rush to adopt IT system to be agile for changing environment. Companies expect the improvement of the process integration over the supply chain, which enhance the overall SCM performance. IT system has been considered to influence on effective communication over the wall of firm boundaries. But, the profitability or the effectiveness of IT investment are controversial. This study try to reemphasize the importance of IT system considering the differences of processes, and the influences on the collaboration of supply chain participants. We want to know the perception level of functional managers for the importances, usages, and contributions of IT system in manufacturing sector. Also, we compare the different perception for collaborative SCM among supplier, buyer, and employees of buyer, and try to understand the context in which the IT investment acceptance occurs. We collected 297 responses(199 from line process and 98 from project process respectively). Results show that the importances, usages, and contributions of IT system are higher in the line process than in the project process.