• Title/Summary/Keyword: Progress Monitor

Search Result 173, Processing Time 0.032 seconds

Monitoring Activities of Permanent GPS Stations at Tide Gauge in South Korea

  • Won, Ji-Hye;Park, Kwan-Dong;Kim, Sang-Ho
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.525-528
    • /
    • 2006
  • South Korea has about 80 permanent GPS stations, being used for a variety of applications such as DGPS, RTK, survey and geodesy. Some of them are installed in or near the coastal area for the purpose of maritime navigation. But, until recently, none of them are used for tide gauge benchmark monitoring. In order to monitor the absolute sea level changes, it is necessary to monitor the land uplift or subsidence occurring at tide gauge sites. It is a common practice to use GPS stations installed at tide gauges to determine absolute sea level. This collaborative efforts coordinated by IGS are called TIGA Pilot Project. Many countries including U.S., Canada, European Union nations, Australia and Japan are participating in TIGA, but South Korea is not a member yet. Recently, we established continuously operating GPS stations at tide gauges located in Incheon and Jeju to monitor the movement of tide gauges sites. This paper will introduce goals and progress of the efforts.

  • PDF

An Information-based Forecasting Model for Project Progress and Completion Using Bayesian Inference

  • Yoo, Wi-Sung;Hadipriono, Fabian C.
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.203-213
    • /
    • 2007
  • In the past, several construction projects have exceeded their schedule resulting in financial losses to the owners; at present there are very few methods available to accurately forecast the completion date of a project. These nay be because of unforeseen outcomes that cannot be accounted for earlier and because of deficiency of proper tools to forecast completion date of said project. To overcome these difficulties, project managers may need a tool to predict the completion date at the early stage of project development. Bayesian Inference introduced in this paper is one such tool that can be employed to forecast project progress at all construction stages. Using this inference, project managers can combine an initially planned project progress (growth curve) with reported information from ongoing projects during the development, and in addition, dynamically revise this initial plan and quantify the uncertainty of completion date. This study introduces a theoretical model and proposes a mathematically information-based framework to forecast a project completion date that corresponds with the actual progress data and to monitor the modified uncertainties using Bayesian Inference.

Comparison of Monitor Units Obtained from Measurements and ADAC Planning System for High Energy Electrons (측정과 ADAC 치료계획 시스템에서 계산된 고에너지 전자선의 Monitor Unit Value 비교)

  • Lee, Re-Na;Choi, Jin-Ho;Suh, Hyun-Suk
    • Progress in Medical Physics
    • /
    • v.13 no.4
    • /
    • pp.202-208
    • /
    • 2002
  • The purpose of this study is to evaluate the monitor unit obtained from various methods for the treatment of superficial cancers using electron beams. Thirty-three breast cancer patients who were treated in our institution with 6, 9, and 12 MeV electron beams, were selected for this study. For each patient, irregularly shaped treatment blocks were drawn on simulation film and constructed. Using the irregular blocks, monitor units to deliver 100 cGy to the dose maximum (dmax) were calculated from measurement and three-dimensional radiation treatment planning (3D RTP) system (PINNACLE 6.0, ADAC Laboratories, Milpitas CA) Measurements were made in solid water phantom with plane parallel (PP) chamber (Roos, OTW Germany) at 100 cm source-to surface distances. CT data was used to investigate the effect of heterogeneity. Monitor units were calculated by overriding CT values with 1 g/㎤ and in the presence of heterogeneity. The monitor unit values obtained by the above methods were compared. The dose, obtained from measurement in solid water phantom was higher than that of RTP values for irregularly shaped blocks. The maximum differences between monitor unit calculated in flat water phantom at gantry zero position were 4% for 6 MeV and 2% for 9 and 12 MeV electrons. When CT data was used at a various gantry angle the agreement between the TPS data with and without density correction was within 3% for all energies. These results indicate that there are no significant difference in terms of monitor unit when density is corrected for the treatment of breast cancer patients with electrons.

  • PDF

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • v.10 no.1
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.

Monitoring and Tracking of Time Series Security Events using Visualization Interface with Multi-rotational and Radial Axis (멀티 회전축 및 방사축 시각화 인터페이스를 이용한 시계열 보안이벤트의 감시 및 추적)

  • Chang, Beom-Hwan
    • Convergence Security Journal
    • /
    • v.18 no.5_1
    • /
    • pp.33-43
    • /
    • 2018
  • In this paper, we want to solve the problems that users want to search the progress of attack, continuity of attack, association between attackers and victims, blocking priority and countermeasures by using visualization interface with multi-rotational axis and radial axis structure. It is possible to effectively monitor and track security events by arranging a time series event based on a multi-rotational axis structured by an event generation order, a subject of an event, an event type, and an emission axis, which is an objective time indicating progress of individual events. The proposed interface is a practical visualization interface that can apply attack blocking and defense measures by providing the progress and progress of the whole attack, the details and continuity of individual attacks, and the relationship between attacker and victim in one screen.

  • PDF

Ubiquitous Sensor Network-based Rehabilitation Center

  • Jarochowski, Bart;Kim, Hyung-Jun;Ryu, Dae-Hyun;Shin, Seung-Joong
    • Journal of information and communication convergence engineering
    • /
    • v.5 no.1
    • /
    • pp.73-77
    • /
    • 2007
  • This paper discusses the implementation of a rehabilitation center based on a ubiquitous sensor network. This paper discusses the implementation of a rehabilitation center based on a ubiquitous sensor network. We recognize that certain mild conditions requiring rehabilitation may be treated with minimal human supervision. In place of this constant human supervision, a variety of sensors are used to monitor the patient and rehabilitation progress. These sensors send data through a wireless Zigbee network to a server which stores the data and makes it available to a rehabilitation expert for analysis. This rehabilitation expert also issues rehabilitation prescriptions which are created based on the expert's determination of the patient's condition. By having the ability to control the rehabilitation equipment used, strictly enforce the assigned prescription, and constantly monitor the patient for any warning signs, the system ensures a safe and optimal rehabilitation session.

Small Unmanned Aerial System (SUAS) for Automating Concrete Crack Monitoring: Initial Development

  • Kang, Julian;Lho, B.C.;Kim, J.W.;Nam, S.H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.310-312
    • /
    • 2015
  • Small Unmanned Aerial Systems (SUAS) have been gaining a special attention in the U.S. recently because it is capable of getting aerial footages conveniently and cost effectively, but also because of its potential threat to the safety of our society. Regarding the benefits, one can easily find successful cases. For example, remote controlled or pre-programmed unmanned aircraft help ranch owners monitor their livestocks or crop harvesting status cost-effectively without having to hire human pilots. The professionals in the construction industry also acknowledge the benefits they could gain from using SUAS. Some firms already use a small unmanned aircraft for monitoring their construction activities, which may help project managers figure out construction progress, resolve disputes in real time, and make proactive decisions for quality control. However, there are many technical challenges that my hinder the use of small unmanned aircraft in the construction industry. This paper explores opportunities and challenges in using unmanned aircraft to monitor concrete cracks on the surface of containment building in the nuclear power plant.

  • PDF

Development of Monitor Chamber Prototype and Basic Performance Testing (모니터 전리함 시작품 개발과 기초 성능 평가)

  • Lee, Mujin;Lim, Heuijin;Lee, Manwoo;Yi, Jungyu;Rhee, Dong Joo;Kang, Sang Koo;Jeong, Dong Hyeok
    • Progress in Medical Physics
    • /
    • v.26 no.2
    • /
    • pp.99-105
    • /
    • 2015
  • The monitor chamber is a real time dosimetry device for the measurement and the control of radiation beam intensity of the linac system. The monitor chamber prototype was developed for monitoring and controlling radiation beam from the linac based radiation generator. The thin flexible printed circuit boards were used for electrodes of the two independent plane-parallel ionization chambers to minimize the attenuation of radiation beam. The dosimetric characteristics, saturation and linearity of the measured charge, were experimentally evaluated with the Co-60 gamma rays. The performance of the developed monitor chamber prototype was in an acceptable range and this study shows the possibility of the further development of the chamber with additional functions.

Rat Magnetocardiograms Measured by YBCO SQUID Magnetometer (YBCO SQUID를 이용한 실험쥐의 심자도 측정)

  • Ahn, San;Kim, I.S.;Song, J.H.
    • Progress in Superconductivity
    • /
    • v.12 no.2
    • /
    • pp.124-128
    • /
    • 2011
  • We have developed a high-$T_C$ SQUID magnetometer system to measure magnetocardiograms of laboratory rats. White noise of the measurement system was about 50 fT/$Hz^{1/2}$ when measured in a magnetically shielded box. We optimized the measurement position to obtain clear MCG wave from rat's small heart by using grid measurements. With the optimization, the MCG signal was successfully detected with the peak amplitude of about 50 pT. We could observe well defined P-, QRS-, and T-wave from the rat MCG. The results suggest that the developed system has a strong potential to monitor the progress of heart disease model using laboratory rat.

A Study on the Failure Behavior of Carbon Fiber Sheet Reinforced Mortar Using Acoustic Emission Technique (AE를 이용한 탄소섬유시트 강화 모르타르의 파괴거동에 관한 연구)

  • 이진경;이준현;장일영
    • Journal of the Korea Concrete Institute
    • /
    • v.12 no.3
    • /
    • pp.67-75
    • /
    • 2000
  • It was well recognized that the damages associated mainly with the aging of civil infrastructures were one of very serious problems for assurance of safety and reliability. Recently carbon fiber sheet(CFS) has been widely used for reinforcement and rehabilitation of damaged concrete beam. However, the fundamental mechanism of load transfer and its load-resistant for carbon fiber sheet reinforced concrete are not fully understood. In this study, three point bending test has been carried out to understand the damage progress and the micro-failure mechanism of CFS reinforced mortars. For this purpose, four different types of specimens are used, that is, mortar, steel bar reinforced mortar, CFS reinforced mortar, and steel bar and CFS reinforced morter. Acoustic Emission(AE) technique was used to evaluate the characteristics of damage progress and the failure mechanism of specimens. in addition, two-dimensional AE source location was also performed to monitor crack initiation and propagation processes for these specimens.