An Information-based Forecasting Model for Project Progress and Completion Using Bayesian Inference  

Yoo, Wi-Sung (Civil & Environmental Engineering & Geodetic Science, The Ohio State University)
Hadipriono, Fabian C. (Civil & Environmental Engineering & Geodetic Science, The Ohio State University)
Publication Information
Korean Journal of Construction Engineering and Management / v.8, no.4, 2007 , pp. 203-213 More about this Journal
Abstract
In the past, several construction projects have exceeded their schedule resulting in financial losses to the owners; at present there are very few methods available to accurately forecast the completion date of a project. These nay be because of unforeseen outcomes that cannot be accounted for earlier and because of deficiency of proper tools to forecast completion date of said project. To overcome these difficulties, project managers may need a tool to predict the completion date at the early stage of project development. Bayesian Inference introduced in this paper is one such tool that can be employed to forecast project progress at all construction stages. Using this inference, project managers can combine an initially planned project progress (growth curve) with reported information from ongoing projects during the development, and in addition, dynamically revise this initial plan and quantify the uncertainty of completion date. This study introduces a theoretical model and proposes a mathematically information-based framework to forecast a project completion date that corresponds with the actual progress data and to monitor the modified uncertainties using Bayesian Inference.
Keywords
Bayesian Inference; changed uncertainties; completion date; future progress; information-based model;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Ford, D.H and Sterman, J.D. (2003) 'Overcoming the 90% Syndrome: Iteration Management in Concurrent Development Projects' Concurrent Engineering:Research and Applications, Vol. 11, No. 3, pp. 177- 186   DOI   ScienceOn
2 Franses, P.H. (1994) 'Fitting a Gompertz Curve' Journal of the Operational Research Society, Vol. 45, pp. 109-113   DOI
3 Joglekar, N.R. and Ford, D.N. (2005) 'Product development resource allocation with foresight' European Journal of Operational Research, Vol. 160, pp. 72-87   DOI   ScienceOn
4 Meade, N. (1985) 'Forecasting Using Growth Curves - An Adaptive Approach' The Journal of the Operational Research Society, Vol. 36, No. 12, pp. 1103-1115
5 Fleming, Q.W. and Koppelman, J.M. (2002) 'Using Earned Value Management' Cost Engineering, Vol. 44, No. 9, pp. 32-36
6 Stukel, T.A. (1988) 'Generalized Logistic Models' Journal of the American Statistical Association, Vol. 83, No. 402, pp. 426-431   DOI
7 Ramgopal, M. (2003) 'Project Uncertainty Management' Cost Engineering, Vol. 45, No. 12, pp. 21-24
8 Franses, P.H. (1994) 'A Method to Select Between Gompertz and Logistic Trend Curves' Technological Forecasting and Social Change, Vol. 46, pp. 45-49   DOI   ScienceOn