• Title/Summary/Keyword: Profit cost

Search Result 773, Processing Time 0.031 seconds

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

The Impact of Sales and Management Expenses on Firm Value (기업특성에 따른 판매관리비가 기업 가치에 미치는 영향)

  • Son, Jeong-Guen;Bae, Khee-Su
    • Korean Management Science Review
    • /
    • v.34 no.1
    • /
    • pp.71-84
    • /
    • 2017
  • The purpose of this study is to extract the characteristic cost through the time series analysis of each cost from 2003 to 2014, and to grasp the performance and relevance of the enterprise. Therefore, in this section, we analyzed the time-series analysis of selling, administrative, and non-operating expenses as described above. First, depreciation cost, advertising cost, transportation cost, research cost, current research cost, and ordinary development cost were extracted as the variables of interest to be verified in the empirical analysis. However, in the analysis of non-operating expenses, we could not extract the specific cost, but we could grasp the time-series flow of cost data before and after two epochs such as financial crisis and introduction of IFRS obligation. The results of this study show that sales management costs have a positive (+) effect on firm value. Empirical analysis confirms that management is trying to increase or decrease the cost This can be confirmed by the empirical results of this paper. At present, general enterprise accounting is done through ERP system. However, since the ERP system does not have an analysis system for each sales and management cost, the current system has difficulty in knowing the budget item for each cost each time the expenditure resolution for each cost item is made, It is a reality that the expenditure plan must be managed separately and it is inconvenient to keep it. However, if this practical difficulty is solved by the cost analysis system such as sales management cost, the present accounting information system will be further developed. Furthermore, the management will increase the profit item It is thought that coordination actions can also be prevented in advance.

A Study On Reduce Scheme Of Design Error In Turn-Key Projects (턴키공사 설계오류 저감방안에 관한 연구)

  • Kim Byeong-Soo;Kim Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.286-289
    • /
    • 2003
  • In turn-key projects, escalation of cost by design errors is not allowed because a contractor prepares the design. Therefore, cost escalation by design errors results in increasing the cost of the prime contractor. The rate of profit decreases finally. In addition, design errors bring not only schedule delay but also serious quality problem by unknown errors. This study tries to dissolve problems, that of cost increase. process delay and a falling-off in quality by investigating cause of design errors and presenting a scheme for reducing design errors.

  • PDF

Economic Life Assessment of Power Transformer using HS Optimization Algorithm (HS 최적화 알고리즘을 이용한 전력용 변압기의 경제적 수명평가)

  • Lee, Tae-bong;Shon, Jin-geun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.66 no.3
    • /
    • pp.123-128
    • /
    • 2017
  • Electric utilities has been considered the necessity to introduce AM(asset management) of electric power facilities in order to reduce maintenance cost of existing facilities and to maximize profit. In order to make decisions in terms of repairs and replacements for power transformers, not only measuring by counting parts and labor costs, but comprehensive comparison including reliability and cost is needed. Therefore, this study is modeling input cost for power transformer during its entire life and also the life cycle cost (LCC) technique is applied. In particular, this paper presents an application of heuristic harmony search(HS) optimization algorithm to the convergence and the validity of economic life assessment of power transformer from LCC technique. This recently developed HS algorithm is conceptualized using the musical process of searching for a perfect state of harmony. It uses a stochastic random search instead of a gradient search so that derivative information is unnecessary. The effectiveness of the proposed identification method has been demonstrated through an economic life assessment simulation of power transformer using HS optimization algorithm.

Cost Analysis of the Structural Work of Green Frame

  • Joo, Jin-Kyu;Kim, Sun-Kuk;Lee, Goon-Jae;Lim, Chae-Yeon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.4
    • /
    • pp.401-414
    • /
    • 2012
  • The adoption of Green Frame is expected to provide economic benefits, since construction costs are reduced by the in-situ production of precast concrete column and beam. The cost reduction can ultimately be realized by saving transportation costs and the overhead and profit of PC plants. The cost structure of Green Frame, which is built up using composite precast concrete members, is similar to that of a bearing-wall structure, but the difference in construction process has resulted in some cost differences for a few items. In particular, production and installation is the principal work involved in Green Frame made by precast concrete members, while form and concrete work is the principal work for a bearing-wall structure. As such, the rental time and fee for a tower crane should be compared through time analysis. To verify reliability, this study focused on developed residential projects to estimate the construction costs. Through this analysis, it was found that the costs of Green Frame were 1.57% lower than the costs of bearing-wall structure. The results of this study will help in the development of a management plan for the structural work of Green Frame.

The Development of New Cost-Effective Optimization Technology for OLED Market Entry

  • Kwon, Woo-Taeg;Kwon, Lee-Seung;Lee, Woo-Sik
    • Journal of Distribution Science
    • /
    • v.17 no.4
    • /
    • pp.51-57
    • /
    • 2019
  • Purpose - This study aims to improve the distribution structure of the OLED market and develop cost-effective optimization techniques. Specifically, it is a study on the optimization of ferric chloride to improve the etch of SUS MASK for OLED. Research design, data, and methodology - Applying the optimal conditions of the experiment, the final confirmation was evaluated for improvement by the Process Capability Index (Cpk). It is possible to derive social performance such as improvement of precision of SUS MASK manufacturing, economic performance such as defect rate, reduction of waste generation and treatment cost, technological achievement such as SUS MASK production technology, improvement of profit structure of technology development and process improvement do. Results - The improvement of the Cpk before the improvement was made was confirmed to be 0.57% with a defect estimate of 25.07% with a failure estimate of 0.57% after the improvement, and 8.84% with a failure estimate of 0.57% level after the improvement. Conclusions - If the conclusions obtained from the specimen experiment are applied to the manufacturing process of SUS MASK, it will be possible to expect excellent cost-effective competitiveness due to the improvement of precision and reduction of defect rate to enhance the OLED market penetration.

The Impacts of Perceived Usefulness, Ease of Use, Reputation, and Usage Fee of the Internet Entertainment Service on the Use of the Service (인터넷 오락 서비스의 유용성, 용이성, 명성, 그리고 유료화가 그 서비스 사용에 미치는 영향)

  • Kim, Chy-Heon;Kim, Joon-S.
    • Asia pacific journal of information systems
    • /
    • v.13 no.3
    • /
    • pp.85-106
    • /
    • 2003
  • Recently, firms which have offered a "free Internet service" to their customers, are considering a "charged Internet service" for increasing a company's profit. But they have doubts about the results, because consumers may fly away from their web-site easily and may discontinue using their services. The purpose of this study is to investigate which factors make consumers use the charged Internet services. To do this, the factors, which are ease of using the service, usefulness of the service, the reputation of the service provider, service cost, and the intention to use the service as a mediator, are analyzed. To achieve this research objective, a structural equation model was constructed and a field study method was used. The findings are summarized as follows: First, ease of using the service, usefulness of the service, and service cost have significant impacts on the charged Internet service usage through the intention to use. Especially, although service cost influences on the service usage largely, the usefulness of the service has a bigger impact on the charged Internet service usage than service cost. Second, the reputation of the service provider does not have any impact on the service usage. Third, consumers using only the free Internet service tend to hesitate about using the "charged Internet service" because they doubt its ease of use and usefulness in spite of the service cost.

Application of Particle Swarm Optimization to the Reliability Centered Maintenance Method for Transmission Systems

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.6
    • /
    • pp.814-823
    • /
    • 2012
  • Electric power transmission utilities make an effort to maximize profit by reducing their electricity supply and operation costs while maintaining their reliability. The development of maintenance strategies for aged components is one of the more effective ways to achieve this goal. The reliability centered approach is a key method in providing optimal maintenance strategies. It considers the tradeoffs between the upfront maintenance costs and the potential costs incurred by reliability losses. This paper discusses the application of the Particle Swarm Optimization (PSO) technique used to find the optimal maintenance strategy for a transmission component in order to achieve the minimum total expected cost composed of Generation Cost (GC), Maintenance Cost (MC), Repair Cost (RC) and Outage Cost (OC). Three components of a transmission system are considered: overhead lines, underground cables and insulators are considered. In regards to aged and aging component, a component state model that uses a modified Markov chain is proposed. A simulation has been performed on an IEEE 9-bus system. The results from this simulation are quite encouraging, and then the proposed approach will be useful in practical maintenance scheduling.

Development of a Tractor Attached TMR Mixer(III) -Cost analysis- (트랙터 견인형 TMR 배합기의 개발(III) -경제성 분석-)

  • Park, K. K.;Kim, H. J.;Seo, S. H.;Nah, K. D.;Hong, D. H.;Jang, C.;Ha, Y. S.;Lee, J. S.
    • Journal of Biosystems Engineering
    • /
    • v.25 no.4
    • /
    • pp.265-272
    • /
    • 2000
  • Feasibility of the self-TMR mixing/feeding system for dairy farm in Korea was analyzed by comparing with a traditional feeding system. The total operating cost of self-TMR feeding system decreased with an increase of farm size. However, the cost was higher than that of traditional feeding system because of its high purchasing cost of TMR mixer as an initial investment. Profit per unit input of the TMR feeding system became greater over the traditional system when the farm size is larger than 17 heads due to more and better milk production. The profitable discrepancy became bigger as dairy farm size increases.

  • PDF

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF