• Title/Summary/Keyword: Productivity Management System

Search Result 1,107, Processing Time 0.024 seconds

A Study on the Use of Results and Measurement Case of Productivity of the Public Organization (공공조직 생산성 측정사례 및 결과 활용에 관한 연구 : 지방자치단체 생산성지수 중심)

  • Kim, Wan Pyong
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.10 no.4
    • /
    • pp.225-236
    • /
    • 2014
  • Productivity of public organizations was far older due to issue more difficult to measure than private organizations. Unlike the private sector, the public sector is a diverse and sometimes conflicting objectives (efficiency, effectiveness, equity, democracy, etc.) exist, it is difficult to measure productivity in a single index. Many departments of government is intricately interrelated and sometimes produced by the joint efforts, it is difficult to allocate performance, incentives and accountability to among departments. And there is the difficulty of collecting data on the productivity indicators of public organizations. Despite these difficulties, we developed a productivity index system and measuring method to systematically introduce the concept of productivity in the local administration. In this paper, the productivity and the productivity index measurement practices of local governments conducted annually from 2011 on was deep into research. First, the report found examples of the governments of the developed countries, productivity measurement, then the way MOPAS(Ministry of Public Administration and Security) measure productivity index of local governments, success factors, the implications were in-depth analysis. Finally, in order to enhance productivity and competitiveness municipalities studied ways to take advantage of the productivity index.

Collection and Utilization of the Construction Productivity Data and the Influence Factors Using Information Technology (IT 기술 기반의 건설 생산성 정보 및 영향요인의 수집 및 활용)

  • Lee, Hyun-Jung;Oh, Se-Wook;Kim, Young-Suk;Kim, Yae-Sang;Kim, Sang-Bun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.548-553
    • /
    • 2006
  • Activity-based productivity data can be used as an significant reference in many areas of project management such as performance evaluation and project planning. However, the existence of various factors influencing construction productivity makes it difficult to collect and analyze the productivity data. In the most of the domestic construction sites, there is no systematic method to collect and analyze the productivity data along with information on influencing factors; it is common to heavily rely on experience and intuition of field managers when dealing with construction productivity data. Therefore it is necessary to develop a management system for collecting and utilizing the productivity data as well as the factors influencing construction productivity. The main objective of this research is to define the construction productivity and its influencing factors at the activity level. In addition, methodologies on how to analyze the productivity data and to estimate productivity of future projects are proposed.

  • PDF

Development of the Strategy for Construction Production Improvement by System Thinking (시스템 사고를 활용한 건축생산성향상 전략 수립에 관한 연구)

  • Kim, Bong-Sik;Lee, Yoon-Sun;Hong, Jung-Seok;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.156-163
    • /
    • 2008
  • Recently, Construction market is contracted by economic slump and regulation. As the solution of this plan, construction productivity is gathering strength. However, the study on the productivity in construction section is insufficient until now. Construction section has many factor about productivity. The point of this study, we analysis the factor of construction productivity improvement and relationship with system thinking. And we show the strategy of construction productivity improvement.

An Effect of Consciousness of the Quality Cost for Productivity Improvement (품질비용에 관한 의식이 생산성향상에 미치는 효과)

  • Park, Roh-Gook;Hong, Seung-Pyo;Hwang, Jeong-Hee
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.179-184
    • /
    • 2011
  • This study contain below two contents. First, this study analyse an effect of consciousness of the quality cost for quality cost activity. Second, this study analyse an effect of quality cost activity for productivity improvement. The empirical result of this study is meaning that quality cost consciousness effects productivity improvement by quality cost activity. Therefore, this paper emphasize consciousness of quality cost for productivity improvement.

The Effect of Worker Heterogeneity in Learning and Forgetting on System Productivity (학습과 망각에 대한 작업자들의 이질성 정도가 시스템 생산성에 미치는 영향)

  • Kim, Sungsu
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.40 no.4
    • /
    • pp.145-156
    • /
    • 2015
  • Incorporation of individual learning and forgetting behaviors within worker-task assignment models produces a mixed integer nonlinear program (MINLP) problem, which is difficult to solve as a NP hard due to its nonlinearity in the objective function. Previous studies commonly assume homogeneity among workers in workforce scheduling that takes account of learning and forgetting characteristics. This paper expands previous researches by considering heterogeneous individual learning/forgetting, and investigates the impact of worker heterogeneity in initial expertise, steady-state productivity, learning and forgetting on system performance to assist manager's decision-making in worker-task assignments without tackling complex MINLP models. In order to understand the performance implications of workforce heterogeneity, this paper examines analytically how heterogeneity in each of the four parameters of the exponential learning and forgetting (L/F) model affects system performance in three cases : consecutive assignments with no break, n breaks of s-length each, and total b break-periods occurred over T periods. The study presents the direction of change in worker performance under different assignment schedules as the variance in initial expertise, steady-state productivity, learning or forgetting increases. Thus, it implies whether having more heterogenous workforce in terms of each of four parameters in the L/F model is desired or not in different schedules from the perspective of system productivity measurement.

Verification of the Use of Architectural PC for Improving the productivity in an Apartment Housing Project (공동주택 공사에서의 건축 외관용 PC 활용에 따른 생산성 향상 분석)

  • Lee, Hyun-Seok;Lee, Sang-Hyo;An, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.670-673
    • /
    • 2007
  • In Korea, it has recently occurred that problems of productivity and construction duration in the construction industry. If five days per week system come into effect, they'll become more urgent. The productivity of construction industry and competitive construction duration in Korea are too low. If post sale system becomes effective, construction companies will strive to improve productivity. Therefore, the objective of this study is to draw up Architectural PC as the alternative for productivity improving and analyze possibility of productivity improving by comparing with established method of construction.

  • PDF

A Handwritten Document Digitalization Framework based Defect Management System in Educational Facilities (수기문서 전자화 프레임워크 기반의 교육시설 하자관리 시스템)

  • Son, Bong-Ki
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.9 no.3
    • /
    • pp.1-11
    • /
    • 2010
  • In the construction industry, IT based information system has been diversely applied to increase productivity. Although IT device such as PDA, RFID, Barcode, wireless network and web camera has been introduced to gather information in construction site, the effect of the IT device is limited, because of bringing about additional works of engineer. In this paper, we proposed a defect management system which is based on handwritten document digitalization framework for introducing applicability of new IT device, digital pen. By the proposed system, we can effectively gather and input defect information to defect management system by using digital pen and paper like conventional way. Applying the data gathering device, digital pen to defect management, it is able to increase productivity by improving work process, building up and utilizing defect information database of good quality.

A Case Study on Productivity Improvement by a Discrete Event-Driven Simulation System (이산사건 시뮬레이션 시스템을 활용한 생산성 개선 사례 연구)

  • Kim, Sangtae;Shin, Moonsoo;Ryu, Kwangyeol;Cho, Yongju
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.149-158
    • /
    • 2015
  • Up-to-date manufacturing companies have faced a market-driven environment of pull production order. There should be a difference in operating manufacturing resources according to the type, quantity, and delivery time of manufactured products, because the process situation in pull production is changed by customer orders. And it should be taken into account from the stage of preparing for production such as process design and the placement and utilization of manufacturing resources. However, the feasibility of production plans is limited because most of small manufacturing businesses make production/supply plan of the parts and products assuming that equipment abilities in scheduling is sufficient without managing process standard information systemically. In this study, a discrete event simulation system based on BOM (bill of material), that is F-OPIS (online productivity innovation system), is introduced and a case study on application of the system leading to improving productivities is presented. F-OPIS deals with a decision-problem on production management and it is specialized for small-and- medium sized manufacturing companies. The target company of this case study is a typical small-and-medium sized manufacturing company in Korea, that produces various machined parts. The target company adopts make-to-stock production management to prevent tardy delivery because of fluctuations in demand. Therefore, it is required to apply an efficient inventory control solution for improving productivities. In this paper, based on the constraints of working capacity of manufacturing resources, the bottleneck process is analyzed as production conditions are changed. Consequently, an improvement plan is proposed, that eventually enhances overall utilization rates of resources in the bottleneck process and reduces overall production lead-time and inventory level.

Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project (공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안)

  • Kim Do-Hyeong;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.101-109
    • /
    • 2001
  • Application of system form is very effective to continuous horizontal or vertical walls of the apartment housing. Though the system forms that are used in the construction field have the advantage of concrete quality improvement and increasing number of usages, there are some problems in reaching early planning scheduling goal due to schedule delay and low productivity. This study is initiated to solve the problem and suggest some improvements searching for reasons that diminish the productivity. A case study was done in apartment construction field where system form was used and the productivity is analyzed by work sampling. Finally, productivity improvements for assembly of the form, internal form and external form are suggested, respectively.

  • PDF

A STUDY ON SELECTING OPTIMAL HAUL ROUTES OF EARTHMOVING MACHINE

  • Han-Seong Gwak;Chang-Yong Yi;Chang-Baek Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.513-516
    • /
    • 2013
  • Earthmoving equipment's haul-route has a great influence on the productivity of the earth work operation. Haul-route grade is a critical factor in selecting the haul-route. The route that has low grade resistance contributes to increase machine travel speed and production. This study presents a mathematical model called "Hauling-Unit Optimal Routes Selecting system" (HUORS). The system identifies optimal path that maximize the earth-work productivity. It consists of 3 modules, i.e., (1) Module 1 which inputs site characteristic data and computes site location and elevation using GIS(Geographical Information System); (2) Module 2 which calculates haul time; (3) Module 3 which displays an optimum haul-route by considering the haul-route's gradient resistances (i.e., from the departure to the destination) and hauling time. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model.

  • PDF