1 |
Chai, J.I. and Park, Y.B., A Study on Throughput Increase in Semiconductor Package Process of K Manufacturing Company Using a Simulation Model. Journal of the Korea Society for Simulation, 2010, Vol. 19, No. 1, pp. 1-11.
과학기술학회마을
|
2 |
Chan, F.T.S., Bhagwat, R., and Wadhwa, S., Increase in flexibility : productive or counterproductive? A study on the physical and operating characteristics of a flexible manufacturing system. International Journal of Production Research, 2006, Vol. 44, No. 7, pp. 1431-1445.
DOI
|
3 |
Choi, G.S., Park G.A., and Yoon, Y.S., A Methodology for Productivity Improvement using Simulation Technique in Small and Medium Enterprise. Journal of Industrial Economics and Business, 2011, Vol. 24, No. 4, pp. 1969-1987.
|
4 |
Choi, M.C., A Study on Heat-Treatment Process Scheduling for Heavy Forged Products using MIP. Korean Management Science Review, 2012, Vol. 29, No. 2, pp. 143-155.
DOI
|
5 |
Herrmann, C., Thiede, S., Kara, S., and Hesselbach, J., Energy oriented simulation of manufacturing systems- Concept and application. CIRP Annals-Manufacturing Technology, 2011, Vol. 60, No. 1, pp. 45-48.
DOI
|
6 |
Jeong, Y.S., Yim, H.J., Jee, H.S., and Lee, K.K., A Manufacturing Line Optimization for Discrete Event Simulation and Genetic Algorithm. Transaction of the Society of CAD/CAM Engineers, 2008, Vol. 13, No. 1, pp. 67-75.
|
7 |
Jung, B.J. and Lee, Y.H., Capacity Planning and Control of Probe Process in Semiconductor Manufacturing. IE interfaces, 1997, Vol. 10, No. 3, pp. 15-22.
|
8 |
Kang, T.Y., Kwon, D.W., and Son, E.I., The Effect of Multiple Value Frames of IT Productivity on Business Performance. Journal of the Quality Management, 2003, Vol. 31, No. 4, pp. 203-218.
|
9 |
Kim, D.G., Kang, .M.K., Choi, J.Y., Park, K.J., and Kong, M.S., Improvement of the Waste Refrigerator Pre-processing Line in Metropolitan Recycling Center using Simulation. Journal of the Korea Society for Simulation, 2013, Vol. 22, No. 4, pp. 129-138.
DOI
|
10 |
Kim, D.S. and Moon, D.H., A Case Study of Comparing the Measuring Methods for Workloads of Resources in a Manufacturing Processes of Semiconductor-Parts. Journal of the Korea Society for Simulation, 2011, Vol. 20, No. 3, pp. 49-58.
DOI
|
11 |
Kitech OPIS_SIMULATION_FRAMEWORK. C-2012-006817.
|
12 |
Kitech, OPIS_SIMULATION_ENGINE. C-2012-006816.
|
13 |
Kwon, C.M. and Lim, S.G., Bottleneck Detection Based on Duration of Active Periods. Journal of the Korea Society for Simulation, 2013, Vol. 22, No. 3, pp. 35-41.
DOI
|
14 |
Lee, B.K., Variation Stack-Up Analysis Using Monte Carlo Simulation for Manufacturing Process Control and Specification. Journal of the Korean Society for Quality Management, 1994, Vol. 22, No. 4, pp. 79-101.
|
15 |
Lee, G.C., The information of dispatching rules for improving job shop performance. Journal of the Society of Korea Industrial and Systems Engineering, 2007, Vol. 30, No. 3, pp. 94-102.
|
16 |
Lee, J.Y., A Study on Lead-time Reduction Based on Advanced Planning and Scheduling(APS) System. Master thesis, Hanbat National University, 2015.
|
17 |
Lee, K.K., Yun, W.Y., Moon, I.K., Cho, H.S., and Cha, B.C., A Study on Improvement of a Production System in Small and Medium Sized Shoes Companies using Simulation. IE interfaces, 2005, Vol. 18, No. 1, pp. 35-43.
|
18 |
Rosen, S.L., Harmonosky, C.M., and Traband, M.T., A simulation optimization method that considers uncertainty and multiple performance measures. European Journal of Operational Research, 2007, Vol. 181, No. 1, pp. 315-330.
DOI
|
19 |
Lee, S.J., Cho, N.Y., Kim, B.S., and Cho, C.W., Identifying Promising IT Products for SMEs under the Concept of Business Ecosystem. Journal of the Korean Institute of Industrial Engineers, 2013, Vol. 39, No. 1, pp. 61-72.
DOI
|
20 |
Lim, K.H., Rule-based Process Control System for multiproduct, small-sized production. Journal of the Korea Industrial Information Systems Research, 2010, Vol. 15, No. 1, pp. 47-57.
|
21 |
Shin, M.S., Ryu, K.Y., and Cho, Y.J., ISC process management simulation. Seoul : Korea Association of Machinery Industry, 2014.
|
22 |
Singholi, A., Ali, M., and Sharma, C., Impact of manufacturing flexibility on FMS performance : a simulation study. International Journal of Industrial and Systems Engineering, 2011, Vol. 10, No. 1, pp. 96-116.
DOI
|
23 |
Sohn, M.E., Kim, W., and Kang, S.J., A RFID-based Process Improvement Methodology : Packing Process of Medium size Enterprise. Journal of the Korea Society for Simulation, 2007, Vol. 16, No. 4, pp. 67-75.
|
24 |
Song, M.G., Jung, C.H., and Chi, S.D., A study of Cluster Tool Scheduler Algorithm which is Support Various Transfer Patterns and Improved Productivity. Journal of the Korea Society for Simulation, 2010, Vol. 19, No. 4, pp. 99-109.
|
25 |
Song, Y.J., Woo, J.H., Lee, D.K., and Shin, J.G., A Simulation Study for Evaluation of Alternative Plans and Making the Upper-limit for Improvement in Productivity of Flow-shop with Considering a Work-wait Time. Journal of the Korea Society for Simulation, 2008, Vol. 17, No. 2, pp. 63-74.
|
26 |
Yoon, H.J. and Shen, W., Simulation-based real-time decision making for manufacturing automation systems : a review. International Journal of Manufacturing Technology and Management, 2006, Vol. 8, No. 1-3, pp. 188-202.
DOI
|
27 |
Standridge, C.R. and Marvel, J.H., Why lean needs simulation. In Proceedings of the 38th conference on Winter simulation, 2006, pp. 1907-1913.
|