• Title/Summary/Keyword: Productivity Improvement

Search Result 1,517, Processing Time 0.022 seconds

Effectiveness of a Business Model for Adopting a Construction Machine Guidance System (건설장비 가이던스 시스템 도입을 위한 비즈니스 모델 효과)

  • Moon, Sung-Woo
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.24-32
    • /
    • 2018
  • A construction machine guidance system is an assistance system that helps construction equipment operators dig grounds during excavation work at a construction site. This system has long been applied in the overseas countries of the United States, Japan and Europe. However, the system has not been paid much attention in Korea. The objective of this paper is to present a business model for adopting construction machine guidance systems in Korea and evaluate the effectiveness of applying the system to excavation work. The business model in this study shows a new process of applying construction machine guidance system, business stakeholders and revenues, and suggests the benefits to the business stakeholders. A field test of the construction machine guidance system proves that the system can be applied as a tool that can improve the productivity of excavation work. This productivity improvement consequently demonstrates that the business model in this study is a prospective challenge in improving the effectiveness of excavation work at the construction site.

Development of Automobile Windows Motor Cover by Thermoplastic Elastomer(TPE) (TPE를 적용한 자동차 윈도우 모터커버의 개발)

  • Cho, Young-Tae;Ko, Boum-Yong;Lee, Choong-Ho
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.19 no.6
    • /
    • pp.847-851
    • /
    • 2010
  • It was attempted to develop an auto part by over molding injection mold that produces precision products in high productivity with use of an eco-friendly TPE substitute material for NBR. NBR is currently used in motor gear cover, one of the key parts in motor module for auto doors. Gear cover is composed of plastics and rubber mostly today, which requires a two (2) step process for production using two presses of different types. A hot press is used at this time for forming the rubber, which has drawback of requiring a rather long forming time of 400 seconds for one forming process. Even though this difficulty is overcome by reducing production time through employment of multi-cavity molds, time for forming process must be shortened for improvement of the productivity eventually, and the existing method of insert injection for products that have been formed with plastic material must be outgrown. In this point of view, over molding injection using TPE has a big advantage. Forming time is shortened to 54 seconds, and working the two (2) processes in series by one (1) press could solve the durability problem caused by deflection of the plastics, not to mention shortening the process time. Enhancement of productivity by almost 80% and improvement in the accuracy of the product could thus be achieved.

A study on learning organization to develop employees' vocational competency at small and medium enterprises and improvement of productivity (중소기업 학습조직이 기업 생산성에 미치는 영향에 관한 연구)

  • Lim, Kyung-Sik;Choi, Byung-Gie;Jung, Jang-Woo;Han, Young-Geun;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.3
    • /
    • pp.167-179
    • /
    • 2009
  • In this era of knowledge and information of the 21st century, the source of a nation's competitive power consists of human resources and material resources and the importance of human resources appreciates highly. The number of small and medium enterprises which are the core of national economy covers over 98% among whole domestic enterprises of Korea. Competitive power of small and medium enterprises comes from human resources development. For the development of human resources, small and medium enterprises are trying to expand their learning organizations in the company. The analysis of outcomes of administering the existing learning organizations shows that learning organizations contribute highly to the improvement of the productivity of small and medium enterprises. And the analysis also shows that the participants of learning organizations and middle management and executives who support and encourage them recognize the necessity of learning organizations and that it should be disseminated throughout other enterprises. Therefore government's supports to establish learning organizations in a company are required to expand.

A Study on the Productivity Improvement of Inconel 718 Material Using Cutting Force Control Program (절삭력 제어 프로그램을 이용한 Inconel718 소재의 생산성 향상에 관한 연구)

  • Lee, Seung-Heon;Son, Hwang-Jin;Cho, Young-Tae;Jung, Yoon-Gyo
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.16 no.6
    • /
    • pp.41-46
    • /
    • 2017
  • Productivity improvement and cost reduction in the aircraft industry have become major industrial objectives, and improving productivity by reducing machining time has become a key focus. When numerical cutting code is created by CAM software, such as CATIA or UG-NX, it is impossible to control machining feed speed using cutting force changes depending on the machining tool path. However, machining an aircraft engine part from difficult material, such as Inconel 718, takes a long time, and tool chipping or breakage often occurs from forcing the machining path too quickly. This study investigated and verified the reliability of the AdvantEdge production module (PM)using cutting power tests. In particular, diffuser and diffuser case parts were considered, comparing cutting power and machining time using AdvantEdge PM and CATIA.

Improvement of Virus Productivity by Sodium Butyrate in the Production of Porcine Transmissible Gastroenteritis Virus Vaccine (Sodium butyrate에 의한 돼지 전염성 위장염 바이러스 백신의 생산성 향상)

  • Lee, Chang-Jin;Kim, Cheol-Min;Jeong, Yeon-Ho
    • KSBB Journal
    • /
    • v.26 no.2
    • /
    • pp.107-111
    • /
    • 2011
  • The essential operating parameters in virus vaccine production are multiplicity of infection (MOI), harvest time, and infection time. Stimulating agents also can be applied in order to improve vaccine productivity further. We investigated the optimum operating conditions in porcine transmissible gastroenteritis virus (TGEV) vaccine production and the applicability of sodium butyrate (NaBu) as a stimulating agents for the improvement of vaccine productivity. The optimum MOI, infection time, and harvest time for high production of TGEV by swine testicle (ST) cells were found to be 0.0001 pfu/cell, 3 day after cell inoculation, and 24 hpi, respectively. NaBu is known as a histone deacetylase inhibitor that has been widely used for the high expression of recombinant protein using mammalian cells and for the enhancement of virus propagation. So we tried to examine the potential of NaBu as a stimulating agent and to determine the optimum concentration by comparing TGEV titers with different range of NaBu concentration. TGEV titer with 5 mM NaBu was 1.5 times higher than control. Therefore, we concluded that NaBu can be a promising agent for stimulating various vaccine production including TGEV and the optimum NaBu concentration for TGEV production was determined to be 5 mM.

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

The ecosystem modelling for enhancement of primary productivity in Kamak Bay (가모만에서의 기초생산력 향상방안에 관한 생태계모델링)

  • Lee, Dae-In;Jo, Eun-Il;Park, Cheong-Gil
    • Journal of Environmental Science International
    • /
    • v.8 no.5
    • /
    • pp.575-586
    • /
    • 1999
  • From the environmental aspects, primary productivity of phytoplankton plays the most improtant role in enhancement of marine culture oyster production. This study may be divided into two branches; one is estimation of maximum oyster meat production per unit facility(Carrying Capacity) under the present enviromental conditions in Kamak Bay, the other is improvement of carrying from increase of primary productivity by changing the environmental conditions that cause not ot form an unfavorable environment such as the formation of oxygen deficient water mass using the eco-hydrodynamic model. By simulation of three-dimensional hydrdynamic model and ecosystem model, the comparison between observed and computed data showed good agreement. The results of sensitivity analysis showed that phytoplankton maximum growth rate was the most important parameter for phytoplankton and dissolved oxygen. The estimation of mean primary productivity of Wonpo, Kamak, Pyongsa, and Kunnae culture grounds in Kamak Bay during culturing period were 3.73gC/$m^2$/d, 2.12gC/$m^2$/d, 1.98gC/$m^2$/d, and 1.26gC/$m^2$/d, respectively. Under condition not ot form the oxygen deficient water mass, four times increasing of pollutants loading as much as the present loading from river increased mean primary productivity of whole culture grounds to 4.02gC/$m^2$/d. Sediment N, P fluxes that allowed for 35% increasing from the present conditions increased mean primary productivity of whole culture grounds to 3.65gC/$m^2$/d. Finally, ten times increasing of boundary loadings from the present conditions increased mean primary productivity of whole culture grounds to 3.95gC/$m^2$/d. The maximum oyster meat production per year and that of unit facility in actual oyster culture grounds under the present conditions were 6,929ton and 0.93ton, respectively. This 0.93ton/unit facility is considered to be the carrying capacity in study area, and if the primary productivity is increased by changing the environmental conditions, oyster production can be increased.

  • PDF

Feasibility Analysis of the Use of Architectural PC for Improving the Productivity in Apartment Housing Projects (공동주택 공사에서의 생산성 향상을 위한 건축 외관용 PC의 적용 타당성 분석)

  • Lee, Hyun-Seok;Sohn, Young-Jin;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.118-125
    • /
    • 2008
  • In Korea, five days per week system, duration reduction bidding system, and post sale system have recently stimulated an interest in productivity improvement in construction project. However, analysis result of productivity in Korean construction industry found that the productivity is too low. APC (Architectural PC) is alternative of reveal wall and parapet in apartment housing prcjects and is used abroad broadly because of duration reduction for productivity improving. APC is used as external curtain wall in Dubai, North America, and Southeast Asia. Therefore, it is proposed that necessary to Introduce APC in Korea. The objective of this study is to draw up introduction of APC in apartment housing projects. We analysed the feasibility of the use of APC. The survey results reported that APC would be able to improve the productivity in the eight productivity factors.

Elderly(60+) and Productivity : Factors Influencing in Performance Evaluation of Elderly Employees (60+ 고령자의 생산성에 대한 기업의 평가와 영향요인)

  • Kim, Moon-Jung;Kim, Hong-Gi
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.11
    • /
    • pp.571-580
    • /
    • 2018
  • The purpose of this study is to evaluate the productivity of elderly employees over 60 years old and to analyze factors that directly or indirectly affect the productivity of elderly employees, based on empirical facts of HR managers. As a result, the factors that have a positive effect on the productivity of elderly employees were attitude and professionalism. The decline in physical capacity due to aging was recognized as a key factor that negatively affected the productivity evaluation of elderly employees. Among the management strategies to improve the work performance, it has been shown that work placement or job redesign according to physical competency contributes to improving the productivity of elderly employees. Also, providing safety education and communication opportunities among workers has a positive effect on productivity improvement. The results of this study suggest that it is important to improve worker productivity by arranging older workers' work experience to be able to demonstrate their accumulated career and expertise and to create a working environment that takes into account physical competence.

Performance Effectiveness Case Study of the Machine Guidance System for Dozer Eartwrok Grading Work (도저 정지작업 시 머신 가이던스 시스템 적용에 따른 토공성과 향상 사례분석)

  • Moon, Sungwoo;Kim, Sangtae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.78-86
    • /
    • 2020
  • Dozer is an expensive construction equipment and has a significant performance impact on earthwork performance. A machine guidance system has been applied to dozer equipment as a solution that can improve the performance. The system can provide earthwork-related information to equipment operators so that earthworks can be carried out with minimum support from surveyors. Construction Equipment Machine guidance has the function of supporting earthwork according to an earthwork plan by providing excavation-related information to machine operators. The objective of this study is to evaluate the performance improvement of a machine guidance system for an dozer earthwork operation, and to compare the machine guidance method with the traditional method. The performance has been evaluated in two folds: 1) productivity and 2) accuracy. The productivity shows the quantity of earthwork for a given unit time. The accuracy shows the deviation of grading level from the designed level on the construction drawing for earthwork. The machine guidance system has been applied to a testing bed in a construction site. Data comparison analysis showed that the earth earthwork had 46.59% improvement in productivity as well as 46.96% improvement in accuracy, and is expected to provide a tool for applying smart constrction to the earthwork operation.