Due to the customer needs of reducing cost and delivery date shorting, prompt change in the production plan became more important. In the multi period system (For instance, production line.) where target processing time exists, production, idle and delay risks occur repeatedly for multiple periods. In such situations, delay of one process may influence the delivery date of an entire process. In this paper, we discuss the minimum expected cost of the case mentioned above, where the risk depends on the previous situation and occurs repeatedly for multiple periods. This paper considers the optimal switching frequency to minimize the total expected cost of the production process. In this paper, first, the optimal switching frequency model is proposed. Next, the mathematic formulation of the total expectation is presented. Finally, the policy of optimal switching frequency is investigated by numerical experiments.
Journal of Korean Society of Industrial and Systems Engineering
/
v.39
no.3
/
pp.147-155
/
2016
Industry 4.0's goal is the 'Smart Factory' that integrates and controls production process, procurement, distribution and service based on the fundamental technology such as internet of the things, cyber physical system, sensor, etc. Basic requirement for successful promotion of this Industry 4.0 is the large supply of semiconductor. However, company I who produces dicing blades has difficulty to meet the increasing demand and has hard time to increase revenue because its raw material includes high price diamond, and requires very complex and sensitive process for production. Therefore, this study is focused on understanding the problems and presenting optimal plan to increase productivity of dicing blade manufacturing processes. We carried out a study as follows to accomplish the above purposes. First, previous researches were investigated. Second, the bottlenecks in manufacturing processes were identified using simulation tool (Arena 14.3). Third, we calculate investment amount according to added equipments purchase and perform economic analysis according to cost and sales increase. Finally, we derive optimum plan for productivity improvement and analyze its expected effect. To summarize these results as follows : First, daily average blade production volume can be increased two times from 60 ea. to 120 ea. by performing mixing job in the day before. Second, work flow can be smoother due to reduced waiting time if more machines are added to improve setting process. It was found that average waiting time of 23 minutes can be reduced to around 9 minutes from current process. Third, it was found through simulation that the whole processing line can compose smoother production line by performing mixing process in advance, and add setting and sintering machines. In the course of this study, it was found that adding more machines to reduce waiting time is not the best alternative.
The purpose of this study was to provide basic information about the usage frequency of foods and menu items that may have microbiological hazards in elementary school foodservice operations in order to prepare a sanitation management manual for the foodservice production process. Menus from 200 elementary school foodservice operations from June 2004 were analyzed. An analysis of the foodservice production process of the menu revealed that the following processes were used: heat process(63.9%), non-heating process(28.1%), and after-heating process(8.0%). The cooking methods used for side dishes were: Stir-frying(19.9%), Saenchae(15.6%), Jorim(15,1%), Sukchae(13.1%), Frying(11.3%) and so on. Overall, 85 menu items known to include microbiological hazards were offered a total of 3,537 times; they were Doegi-bulgogi(7.0%), Bibim-bap(5.2%), Oi-saengchae(4.6%), Kongnamul-muchim(4.2%), Ddeok-bokkeum(4.0%), Japchae(3.7%), and so on. To serve safe and hygienic foods, menus including microbiological hazards should be planned very carefully. Furthermore, if a menu is high in microbiological hazards and frequency, the manuals of sanitation management should be applied more thoroughly.
Ha, Seung-Ho;Kim, Seok;Kim, Kyoung-Min;Park, Chan-Hyuk;Kim, Kyong-Ju
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.521-525
/
2004
The objective of this study is to implement a WBS (Work Breakdown Structure) so as to support efficient information management through the construction process of Steel Box Girder Bridge. To meet this requirement. This study performs the analysis of the business process. Through the work, information flows and information management levels are identified. Information management in each manufacturing process was various in its level. For the efficient information management, skating and utilization in schedule, cost, resource, and quality management, it is recommended to utilize a WBS composed of major work section and element structure of the steel box girder.
Journal of Korean Society of Archives and Records Management
/
v.20
no.4
/
pp.19-40
/
2020
Deficiencies are present in records management during the production stage of long-term electronic records preservation. As such, this study seeks to address these issues by introducing Cloud On-Nara System (On-Nara Document 2.0) at records management sites and providing various systems and linked services. In particular, the factors that degrade the continuity of long-term preservation in the records management process, from the production to the utilization of electronic records, in On-Nara Document 2.0 were identified, and the causes were analyzed in compliance with ISO 15486-1:2016 and the Public Records Act. As a result, in redesigning the records management procedure, the organization of the records management hub between systems and the conversion of the document preservation format for long-term preservation were proposed. Moreover, the application of consistent production format selection criteria and the reinforcement of the production and management of granular metadata were recorded. These measures were proposed in an effort to reestablish management methods.
We consider the problem of selecting the most profitable initial process mean and length of production cycle for manufacturing processes subject to a constant linear trend during the same cycle that varies after resetting the processes. Assuming that the quality characteristic of interest is normally distributed, the optimum initial process mean and the length of production cycle are jointly obtained by minimizing the expected loss per unit time. We assume that the quality loss function due to the deviation from the target value is quadratic and resetting loss is constant. We consider both cases of symmetric and asymmetric quality loss function. An illustrative example is given and sensitivity analysis performed.
Journal of Korean Society of Industrial and Systems Engineering
/
v.31
no.2
/
pp.1-10
/
2008
In the knowledge-based society which recognizes knowledge as a core value, knowledge management is one of the most interesting issues. The creation of knowledge within an organization occurs as a result of interactions of tacit and explicit knowledge, in process of knowledge conversion. One useful model of this process is the SECI model which stands for a process of socialization, externalization, combination and internalization of knowledge. The enterprise competitive power depends on how an organization accelerates the speed of the cycle of knowledge creation well. In this paper we introduce a knowledge management promotion system based on SECI model and proposal system to promote the cycle of knowledge creation in production fields, and study an enterprise case.
Proceedings of the Korean Society for Quality Management Conference
/
2010.04a
/
pp.67-73
/
2010
This study began the study by instructing enterprises to change Batch Production into U-Line. This study suggested TPS U-Line building model process and applied it to some of their product line. By connecting concerned process elements into continuous operations. Outside orders were also switched to inside operations and executed in continuous operations, thereby about 100Km of transit distance became zero Km, Production lead Time was incredibly reduced. After all, 90% of Production Lead Time, 50% of handling fault, 3/4 of workers decreased and Productivity per Person enhanced which involves improving Batch Production into Continuous Production and applies it to the real world, so that small and medium enterprises can consult this study if the company is willing to make an improvement to their product line.
We derive a generalized statistic form of Q control chart, which is especially suitable for short run productions and start-up processes, for the detection of process mean shifts. The generalization means that the derived control chart statistic concurrently uses within lot variability and between lot variability to explain the process variability. The latter variability source is noticeably prevalent in lot type production processes including semiconductor wafer fabrications. We first obtain the generalized Q control chart statistic when both the process mean and process variance are unknown, which represents the case of implementing statistical process control charting for short run productions and start-up processes. Also, we provide the corresponding generalized Q control chart statistics for the rest of three cases of previous Q control chart statistics : (1) both the process mean and process variance are known (2) only the process mean is unknown and (3) only the process variance is unknown.
Journal of the Korea Institute of Information and Communication Engineering
/
v.17
no.12
/
pp.2906-2913
/
2013
Only small numbers of medium-sized manufacturers have adopted a production management system. They have difficulty maintaining production cost and progress management, because they have used the ways that win a contract, not mass production system like a big company. Also a small company has to change standard features of products whenever customers want, by means of non-standardization and small quantity production method. As a result, it has been very difficult for a small company to establish a proper production management system. So, this paper tried to make a study about increasing production management system, using QR codes in a small-sized manufacturer with the ways that win a contract, based on real application case.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.