References
- Benders, J. (2002), The origin of period batch control (PBC), Int. J. Prod. Res., 40, 1-6. https://doi.org/10.1080/00207540110069087
- Bergamashi, D., Cigolin, R., Perona, M., and Portiol, A. (1997), Order review and release strategies in job shop environment: a review and a classification, Int. J. Prod. Res., 35, 399-420. https://doi.org/10.1080/002075497195821
- Matsui, M., Shingu, T., and Makabe, H. (1977), Conveyor-serviced production system: an analytic framework for station-centered approach by some queueing formulas, Preliminary Report of the Operations Research Society of Japan, 104-107 (in Japanese).
- Matsui, M. (2004), MGM-modeling and balancing problem in supply chain management, Proceedings of APIEMS, Gold Cost, Australia (on CD-ROM).
- Matsui, M. (2005), A Management cycle model: switching control under lot processing and time span, Journal of Japan Industrial Management Association, 56, 256-264.
- Matsui, M. (2008), Manufacturing and Service Enterprise with Risk: A Stochastic Management Approach, Springer.
- Sun J., Yamamoto H., and Matsui M. (2010), A study of optimal switching problem in limited-cycle with multiple periods, Journal of Zhejiang University-SCIENCE A (Applied Physics and Engineering), 11, 933-937. https://doi.org/10.1631/jzus.A1001062
- Swamidass, P. M. (2000), Encyclopedia of Production and Manufacturing Management, Kluwer, Boston.
- Verzijl, J. J. (1976), Production Planning and Information Systems, Macmillan, London, 16-17.
- Week, J. K. (1979), Optimizing planned lead times and delivery dates, 21st Annual Conference Proceedings, APICS, 177-188.
- Wright, Q. W. (1974), Production and Inventory Management in the Computer Age, Canners Publishing Co.
- Yamamoto, H., Matsui M. and Liu J. (2006), A basic study on a limited-cycle problem with multi periods and the optimal assignment problem, Journal of Japan Industrial Management Association, 57, 23-31 (in Japanese).
- Yamamoto, H., Matsui M. and Bai X. S. (2007), A Branch and Bound Method for the Optimal Assignment during a Limit-cycle Problem with Multiple Periods, Journal of Japan Industrial Management Association, 58(37-43) (in Japanese).
- Yamamoto, H., Sun, J., Oishi, T., and Matsui, M. (2010a), A Study of the Optimal Switching Point of the Limited-Cycle Problem with Multiple Periods, Journal of Japan Industrial Management Association, 61(4) (in Japanese).
- Yamamoto, H., Sun, J., and Matsui, M. (2010b), A Study on Limited-Cycle Scheduling Problem with Multiple Periods, Computer and Industrial Engineering, 59(44), 675-681. https://doi.org/10.1016/j.cie.2010.07.017
Cited by
- A Study on Three Rookie Workers' Assignment Optimization under the Limited-Cycled Model with Multiple Periods --Law of Rookie First-- vol.9, pp.2, 2015, https://doi.org/10.14327/iscm.9.51