• Title/Summary/Keyword: Procurement System

Search Result 434, Processing Time 0.026 seconds

A Study on the Software Supply Chain Security Policy for the Strengthening of Cybersecurity: Based on SBOM Policy Cases (사이버안보 강화를 위한 소프트웨어 공급망 보안 정책 연구: SBOM 정책 추진 사례를 중심으로)

  • Son, Hyo-Hyun;Kim, Dong-Hee;Kim, So-Jeong
    • Journal of Digital Convergence
    • /
    • v.20 no.2
    • /
    • pp.9-20
    • /
    • 2022
  • Supply chain attacks target critical infrastructure, causing large amounts of damage and evolving into a threat to public safety and national security. Accordingly, when establishing cybersecurity strategies and policies, supply chain risk management is specified to enhance security, and the US Biden administration recently issued the Executive Order on Improving the Nation's Cybersecurity, SBOM was mentioned as part of the guidelines for strengthening software supply chain security. If the government mandates SBOM and uses it as a security verification tool for supply chains, it can be affected by the domestic procurement system in the future and can be referenced when establishing a security system for domestic supply chains according to the progress of policy implementation. Accordingly, in this paper, countries that are promoting the SBOM policy as a way to strengthen the security of the software supply chain were selected and analyzed with a focus on related cases. In addition, through comparison and analysis of foreign SBOM policy trends, methods for using domestic SBOM in terms of technology, policy, and law were considered. As the value of using SBOM as a supply chain integrity/transparency verification tool is expected in the future, it is necessary to continuously identify trends in the establishment of international standardization and policy development for SBOM and study the standard format.

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

Analysis of the Gene Expression by Laser Captured Microdissection (I): Minimum Conditions Required for the RNA Extraction from Oocytes and Amplification for RT-PCR (Laser Captured Microdissection을 이용한 유전자 발현에 대한 연구 (I): RT-PCR을 위한 난자의 RNA 추출 및 증폭을 위한 최소한도의 확립)

  • Park, Chang-Eun;Ko, Jung-Jae;Cha, Kwang-Yul;Lee, Kyung-Ah
    • Clinical and Experimental Reproductive Medicine
    • /
    • v.28 no.3
    • /
    • pp.183-190
    • /
    • 2001
  • Objective: Recently, microdissection of tissue sections has been used increasingly for the isolation of morphologically identified homogeneous cell populations, thus overcoming the obstacle of tissue complexity for the analysis cell-specific expression of macromolecules. The aim of the present study was to establish the minimal conditions required for the RNA extraction and amplification from the cells captured by the laser captured microdissection. Methods : Mouse ovaries were fixed and cut into serial sections (7 im thickness). Oocytes were captured by laser captured microdissection (LCM) method by using PixCell $II^{TM}$ system. The frozen sections were fixed in 70% ethanol and stained with hematoxylin and eosin, while the paraffin sections were stained with Multiple stain. Sections were dehydrated in graded alcohols followed by xylene and air-dried for 20 min prior to LCM. All reactions were performed in ribonuclease free solutions to prevent RNA degradation. After LCM, total RNA extraction from the captured oocytes was performed using the guanidinium isothiocyanate (GITC) solution, and subsequently evaluated by reverse transcriptase-polymerase chain reaction (RT-PCR) for glyceraldehyde-3-phosphate-dehydrogenase (GAPDH). Results: With the frozen sections, detection of the GAPDH mRNA expression in the number of captured 25 oocytes were not repeatable, but the expression was always detectable from 50 oocytes. With 25 oocytes, at least 27 PCR cycles were required, whereas with 50 oocytes, 21 cycles were enough to detect GA PDH expression. Amount of the primary cDNA required for RT-PCR was reduced down to at least 0.25 $\grave{i}$ l with 50 oocytes, thus the resting 19.75 il cDNA can be used for the testing other interested gene expression. Tissue-to-slide, tissue-to-tissue forces were very high in the paraffin sections, thus the greater number of cell procurement was required than the frozen sections. Conclusion: We have described a method for analyzing gene expression at the RNA level with the homogeneously microdissected cells from the small amount of tissues with complexity. We found that LCM coupled with RT-PCR could detect housekeeping gene expression in 50 oocytes captured. This technique can be easily applied for the study of gene expression with the small amount of tissues.

  • PDF

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

  • PDF

Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

A Study on the FIDIC Conditions of Contract for Design, Build and Operate Projects (FIDIC의 DBO 프로젝트용 표준계약조건에 관한 연구)

  • Choi, Myung-Kook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.46
    • /
    • pp.29-60
    • /
    • 2010
  • The incentive and reasons to publish FIDIC Conditions of Contract for Design, Build and Operate Projects(DBO Form) are manifold. It is partly a response to the increasing need for sophisticated project delivery methods in both the public and private sectors and the already widespread use of the FIDIC Yellow Book with operation and maintenance obligations and partly a response to the challenge to decrease maintenance cost to a minimum by means of a new procurement route. As a result, FIDIC has developed a new model form to meet this market place requirement. On the other hand, FIDIC did not simply adapt the Yellow Book but has developed a new form from it, whilst preserving the style of the already known FIDIC Forms and maintaining the wording where it was not necessary to change it for the purposes of a DBO Form. Moreover DBO Form fills up supposed gaps in other FIDIC Forms and ameliorates the claim management and dispute management framework. FIDIC DBO approach may be shortly summarized as follows. First, DBO Form provides for single project responsibility. Second, DBO Form has the clear objective of ensuring the use of a most reliable and efficient technology at the lowest life-cycle cost. Third, DBO Form is intended to operate as an effective quality increase in the design and construction of projects. Fourth, DBO Form is intended to provide significant benefits with regard to system integration and reduction of risks. Fifth, DBO Form accelerates and enhances completion schedule compliance. Sixth, DBO takes care of all three supporting pillars of sustainability(including economical, environmental and social elements). DBO Form is obviously a good starting point for negotiations and the preparation of calls for tenders, thus saving the parties time and money. However, existing cultural and legal differences, particular local conditions and the particular needs of some branches of the industry may require the form to be adapted according to the particular needs of a project. And Civil law practitioners are strongly recommended to verify carefully the underlying legal concepts and background of each clause of the General Conditions in order to avoid unnecessary and sometimes unnatural changes and amendments being made. Note that when preparing the Particular Conditions ensure that terminology is consistent and that existing inherent concepts should not be ignored.

  • PDF

A review of artificial intelligence based demand forecasting techniques (인공지능 기반 수요예측 기법의 리뷰)

  • Jeong, Hyerin;Lim, Changwon
    • The Korean Journal of Applied Statistics
    • /
    • v.32 no.6
    • /
    • pp.795-835
    • /
    • 2019
  • Big data has been generated in various fields. Many companies have now tried to make profits by building a system capable of analyzing big data based on artificial intelligence (AI) techniques. Integrating AI technology has made analyzing and utilizing vast amounts of data increasingly valuable. In particular, demand forecasting with maximum accuracy is critical to government and business management in various fields such as finance, procurement, production and marketing. In this case, it is important to apply an appropriate model that considers the demand pattern for each field. It is possible to analyze complex patterns of real data that can also be enlarged by a traditional time series model or regression model. However, choosing the right model among the various models is difficult without prior knowledge. Many studies based on AI techniques such as machine learning and deep learning have been proven to overcome these problems. In addition, demand forecasting through the analysis of stereotyped data and unstructured data of images or texts has also shown high accuracy. This paper introduces important areas where demand forecasts are relatively active as well as introduces machine learning and deep learning techniques that consider the characteristics of each field.

Workcase based Very Large Scale Workflow System Architecture (워크케이스 기반의 초대형 워크플로우 시스템 아키텍쳐)

  • 심성수;김광훈
    • Proceedings of the Korea Database Society Conference
    • /
    • 2002.10a
    • /
    • pp.403-416
    • /
    • 2002
  • 워크플로우 관리 시스템은 정부나 기업과 같은 조직의 작업을 처리하기 위한 비즈니스 프로세스를 컴퓨터를 기반으로 자동화함으로서 작업의 효율을 높이고 비용을 절감한다. 현재에 이르러 이런 워크플로우 시스템을 사용하는 조직들이 점차 거대화되어 가고 네트워크의 발달과 인터넷의 출현으로 인하여 워크플로우 시스템이 처리하여야 하는 작업의 수와 고객과 작업자 수 등이 빠른 속도로 증가하는 추세이다. 이런 추세에서 워크플로우 시스템은 거대 조직 환경에 적합한 워크플로우 시스템 아키텍쳐를 필요하게 된다. 이에 본 논문은 거대 조직 환경을 관리할 수 있는 워크플로우 관리 시스템으로 워크케이스 기반의 초대형 워크플로우 시스템의 아키텍쳐를 설계 및 구현 하고자 한다. 그리고 워크플로우 시스템 아키텍쳐를 분류, 분석하여 장단점을 가려내어 이를 기반으로 워크플로우 시스템 아키텍쳐의 성능을 예측하여 워크케이스 기반 워크플로우 시스템 아키텍쳐가 본 논문에서 제안하는 초대형 워크플로우 시스템의 아키텍쳐라는 것을 예측하여 본다. 또한 초대형 워크플로우 시스템을 위하하부 구조로 EJB(Enterprise Java Beans)를 사용하고 사용 이유를 기술한다. 본 논문에서는 이런 워크케이스 기반의 초대형 워크플로우 시스템 아키텍쳐를 위하여 개념적인 단계와 설계 단계, 구현 단계로 나누어 설계 및 구현을 하며 개념적인 단계에서는 워크케이스 기반 워크플로우 시스템 아키텍쳐에 대하여 상세히 기술하고 설계단계에서는 전체적인 기능 정의와 초대형 워크플로우 시스템의 구조를 설계한다. 그리고 구현 단계에서는 워크케이스 기반의 초대형 워크플로우 시스템 아키텍쳐를 실제 구현하기 위한 환경을 선택하고 구현 단계의 문제점들과 해결책을 기술한다. 다 솔레노이드방식 감압건조장치로 건조한 표고버섯으로 품위에 대한 유의성 검증결과, 표고버섯의 경우 온도별로는 색택과 복원률, 건조실 내부 압력별로는 수축률, 복원률에서 유의차가 있는 것으로 나타났다. 라. 본 연구에서 구명된 감압건조특성을 기초로 하여 배치식 감압건조기를 설계 제작에 활용하고자 한다.ational banks. Several financial interchange standards which are involved in B2B business of e-procurement, e-placement, e-payment are also investigated.. monocytogenes, E. coli 및 S. enteritidis에 대한 키토산의 최소저해농도는 각각 0.1461 mg/mL, 0.2419 mg/mL, 0.0980 mg/mL 및 0.0490 mg/mL로 측정되었다. 또한 2%(v/v) 초산 자체의 최소저해농도를 측정한 결과, B. cereus, L. mosocytogenes, E. eoli에 대해서는 control과 비교시 유의적인 항균효과는 나타나지 않았다. 반면에 S. enteritidis의 경우는 배양시간 4시간까지는 항균활성을 나타내었지만, 8시간 이후부터는 S. enteritidis의 성장이 control 보다 높아져 배양시간 20시간에서는 control 보다 약 2배 이상 균주의 성장을 촉진시켰다.차에 따른 개별화 학습을 가능하게 할 뿐만 아니라 능동적인 참여를 유도하여 학습효율을 높일 수 있을 것으로 기대된다.향은 패션마케팅의 정의와 적용범위를 축소시킬 수 있는 위험을 내재한 것으로 보여진다. 그런가 하면, 많이 다루어진 주제라 할지라도 개념이나 용어가 통일되지 않고

  • PDF

Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage - (LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 -)

  • Park, Hwan Pyo;Han, Jae Goo;Chin, Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.47-57
    • /
    • 2014
  • LNG plant projects tend to be implemented in overseas owing to its characteristics, so their project management scheme is somewhat different from those of general projects. Value chain in a LNG plant project includes exploration/production of gases, physical liquefaction/chemical conversion processes, transportation and storage. Key factors in the chain include liquefaction process (including ultra-low temperature liquefaction) to convert natural gas into liquid materials or fuel, and Front End Engineering Design (FEED) package, as well as Engineering, Procurement and Construction (EPC) technology comprising control, operation and construction. Success of a complex LNG plant project implemented in overseas depends on decision-making process in project management. Accordingly, to develop a decision-making model in of plant construction, the study extracted none factors in project management by EPC stage and assessed importance of each factor. The result showed that items in both project management and project risk management are important. Especially, the study developed a decision-making model in the construction stage of a LNG plant project based on the project management factors and importance assessment. The developed decision-making model would lay groundwork in building a decision-making system in construction stage of project management.