• Title/Summary/Keyword: Procurement Process

Search Result 291, Processing Time 0.031 seconds

Internet-based Procurement Process for Marine Service (해운대리점의 인터넷 구매/조달 프로세스 구축)

  • 서준용;고재문;고형일
    • The Journal of Information Systems
    • /
    • v.10 no.1
    • /
    • pp.51-72
    • /
    • 2001
  • E-commerce has not only brought about a great change in the way we exchange goods and services but also revolutionized the way we handle business transactions. In addition, it has a significant influence upon the present business structure, and most of firms in service industry as well as manufacturing are considering adopting E-commerce in a serious manner. Most vessels purchase merchandises through a number of shipping agents. As the amount of harbor materials increase, the number of vessels and their navigation frequency also increase. As a result, the amount of procurement for ships has increased. Traditional means such as telephone and fax to handle ever-increasing harbor transaction, however, has proved to be very time-consuming and cost ineffective. Therefore, people are starting to look for more effective ways. In this paper, an internet-based scheme of B2B transaction is proposed to handle procurement problem between shipping agency and shipping company, and between vessel and suppliers as a more effective approach to streamline such problems. We extract problems of shipping agency through task-analysis and present a scheme that performs decision making and procurement as a system agent with brokering structure. Purchaser and supplier are offered material information rapidly and task loads are minimized by the scheme. Also, the system can support decision making of purchasing goods, and information is shared among purchaser, supplier and system through the system interface.

  • PDF

Modern High-Power TBM with Advanced Procurement System (오늘날의 고성능 TBM과 선진 장비조달 방안)

  • Jee, Warren W.
    • Tunnel and Underground Space
    • /
    • v.23 no.3
    • /
    • pp.161-168
    • /
    • 2013
  • Recently, the application of High-Power mechanized tunnelling technology has been expended around the world. Especially, High-power Modern TBM machines are used in a successful results. Essential for the great success of this modern TBM in difficult rock conditions are based on the development of machine power, suitable better cutter developments, and also developed assesment technology regards on the extensive site investigations. OPP (Owner Procurement Process) system is a proven alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures the TBMs and tunnel lining in advance of the tunnel contract procurement and provides TBM to a tunnel contractor with a goals of reducing project risks and accelerating project schedule. Depending on the blasting vibrations and noises, mechanized tunnelling will be more important particularly in city areas.

The development of the procurement process system for e-Biz of the plant business (플랜트 산업의 e-Biz화를 위한 구매 Process System 개발)

  • Kim Hoi-Sub;Lee Joo-Pyo;Han Sang-hoon;Cho Se-hyoung;Park Chang-Hyun;Han Jae-Bum;Kim Sung-Ho;Kim Gyu-Tae
    • Journal of Internet Computing and Services
    • /
    • v.4 no.5
    • /
    • pp.11-19
    • /
    • 2003
  • Since B2C(Business to Customer) from which e-commerce had originated was replaced by B2B, e-Business has shown fast growth so fa., Recently, e-Procurement by l:n concept is on the development as self-purchase system associated with their own ERP In many conglomerates in the Korean market. However, in order to vitalize e-Biz in the plant industry, we need to set up e-marketplaces where many sellers and buyers can meet each other at the same time, which has become the essential part for success as an expanded business model. In this paper, we expect that the foundation for e-transformation in the plant industry is set up by developing Purchase Process System and related modules as the prerequisite for e-Biz in the plant industry, and this report will provide an exemplary model for e-commerce. The Purchase Process System consists of 1) e-Purchasing Module that manages bidding and contract information based on quotation inquiry, 2) e-Expediting Module that manages information to guarantee the on-time delivery, 3) e-Certification Module that controls user authentification, 4) e-Basic Module that manages the bulletin boards, Q&A, etc.

  • PDF

E-Marketplace Development Trend

  • Kim Ho-Bin
    • Proceedings of the Korea Database Society Conference
    • /
    • 2000.11a
    • /
    • pp.1-10
    • /
    • 2000
  • o Procurement inefficiencies - Material and Purchase Process Cost reduction o Sourcing not proactive - Lack of visibility disrupts ability to deliver o Poor collaboration impedes ability to meet demand o Communications Impeded by product content negotiation (omitted)

  • PDF

A Plan of Project Information Management through Analysis of Drafting Process for Transportation Planning (양중계획입안 프로세스의 구조화를 통한 프로젝트 정보관리 방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.101-109
    • /
    • 2008
  • As the number of high-rise building construction projects grows up, the subject of the transportation planning has become one of the grave issue. however important decision making are made by the experience of the a planner without the rational plans for information sharing. therefore, the purpose of this study is to suggest a plan of prefect information management not only for describing drafting process for transportation planning but also for systematizing information used in the procurement, transportation and construction phase to achieve these objectives, this study 1)analyzes the prior theory about transportation planning, 2)performs a case study of actual project to embody the problems of site management by analyzing the results of interviewing experts. In conclusion, the following factors are systematized : 1)the structure of drafting process for transportation planning, 2)the contents of information used in the procurement, transportation and construction phase, 3)the actual condition of code breakdown structure in transportation Planning phase. It is anticipated that the proposed methodology would be able to improve information management among the related engineers and accumulated data that might be used in similar construction projects in Korea.

A Study on the Procurement of Iron Materials and the Production of Ironwork in Constructions of Royal Tombs in the Later Joseon Period -Focused on Sanneung-uigwes- (조선후기 산릉공역의 철물 조달과 철제품 제작 -산릉의궤를 중심으로-)

  • Lee, Sang-Myeong
    • Journal of architectural history
    • /
    • v.25 no.5
    • /
    • pp.27-40
    • /
    • 2016
  • The purpose of this study was to comprehend the procurement system of iron materials and the production process of ironwork in royal tombs constructions in the later Joseon period. For this purpose, sixteen Sanneung-uigwes were analyzed. The following conclusions have been reached through the study. First, it was procuring five types of iron materials in constructions of royal tombs. Sincheol had been supplied up to the mid-18th century. On the other hand, the amount of jeongcheol was increased rapidly. Because of the procurement system of initial tools was changed from bokjeong(a kind of tribute) to self-production in the Noyaso. Second, the government stockpiles were utilized as much as possible than bokjeong to manage the limited construction period and sudden construction start. Third, before moving the site of tombs, the melting furnace was installed in the Gungisi(armament factory). The amount of the melting furnace was increased from 5 to 8 since producing the initial tools in the Noyaso. Fourth, six kinds of master artisans were worked in the field of producing ironwork. Metal worker was assigned to one person per melting furnace. Fifth, the quality of final iron materials was controlled by use. Since the 19th century, it had been produced enhanced ironwork.

Optimal LNG Procurement Policy in a Spot Market Using Dynamic Programming (동적 계획법을 이용한 LNG 현물시장에서의 포트폴리오 구성방법)

  • Ryu, Jong-Hyun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.3
    • /
    • pp.259-266
    • /
    • 2015
  • Among many energy resources, natural gas has recently received a remarkable amount of attention, particularly from the electrical generation industry. This is in part due to increasing shale gas production, providing an environment-friendly fossil fuel, and high risk of nuclear power. Because South Korea, the world's second largest LNG importing nation after Japan, has no international natural gas pipelines and relies on imports in the form of LNG, the natural gas has been traditionally procured by long term LNG contracts at relatively high price. Thus, there is a need of developing an Asian LNG trading hub, where LNG can be traded at more competitive spot prices. In a natural gas spot market, the amount of natural gas to be bought should be carefully determined considering a limited storage capacity and future pricing dynamics. In this work, the problem to find the optimal amount of natural gas in a spot market is formulated as a Markov decision process (MDP) in risk neutral environment and the optimal base stock policy which depends on a stage and price is established. Taking into account price and demand uncertainties, the basestock target levels are simply approximated from dynamic programming. The simulation results show that the basestock policy can be one of effective ways for procurement of LNG in a spot market.

A Study on Material Requirement Planning by Integrating Schedule and Cost (비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.106-113
    • /
    • 2003
  • In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.

The application of AHP to measure the importance level of managerial factors for e-commerce in SMB (AHP를 이용한 중소제조업의 전자상거래 경영측면 요인 수준)

  • Hong, Hyun-Gi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.3
    • /
    • pp.654-659
    • /
    • 2009
  • In the early stage of electronic commerce the technical aspects were regarded as the most important factor for its success, but the economic and managerial aspects gain currently more and more its importance. In this paper some issues are researched which are emerging as essential factor with the development of electronic commerce. Especially this survey was carried out from four managerial aspects which are management strategy, marketing, procurement/logistics and service. The result of this research shows us that the importance level of management strategy and procurement/logistics are low, but that of marketing and service are very high. AHP-Analysis as the result of this paper shows the importance list in rank of service, marketing, procurement/logistics and management strategy.