• Title/Summary/Keyword: Procurement

Search Result 891, Processing Time 0.027 seconds

A Theoretical Analysis of Public Procurement for Innovation

  • SUNJOO HWANG
    • KDI Journal of Economic Policy
    • /
    • v.46 no.2
    • /
    • pp.21-43
    • /
    • 2024
  • This paper provides a new theoretical rationale for public procurement for innovation (PPI), a unique policy encouraging public procurers to purchase innovative products. In contrast to existing studies that primarily emphasize the advantages of PPI, this paper takes a comprehensive approach, examining both the costs and risks associated with PPI, alongside its benefits. It finds a general condition under which PPI outperforms traditional public procurement. Under this condition, this paper demonstrates that PPI enhances social welfare by facilitating optimal risk-sharing between public procurers and the general economy. Additionally, it draws policy implications from a comparative analysis between the current PPI policy in Korea and an optimal PPI policy.

A Basic Model of the Procurement Planning of Resources by Activity in Construction Projects (건축공사 액티비티별 소요자원 조달계획의 기초모델링)

  • Kim, Ji-Hyun;Nam, Gi-Yung;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.340-346
    • /
    • 2012
  • Recently, the construction industry has been pursuing the rationalization of its various systems through informatization. Procurement is a highly important element of the construction process, as it is directly related to the cost and quality of a construction project. In addition, procurement management of resources is in an indivisible relation, so that it is significant to link each other effectively. This study proposed construction activity and basic data connected to cost summary work for the categorization and utilization of resources. This study connected that activity to detailed items of material and labor cost, and proposed a procurement planning model of resources by activity that can utilize all resources and information. In addition, this model can classify resources and information by various forms. We found that the utilization of this procurement planning model will be higher because it can grasp various problems that occur in the passive procurement and provide additional functions that can be modified.

Design and Implementation of Secure E-Procurement System based on XML (XML기반의 안전한 E-Procurement 시스템 설계 및 구현)

  • Moon, Tae-Soo;Song, You-Jin
    • The KIPS Transactions:PartD
    • /
    • v.9D no.6
    • /
    • pp.1043-1054
    • /
    • 2002
  • This paper intends to suggest a XML-based secure E-Procurement system using Unified Modeling Language(UML), as an application system for domestic automobile industry. Applying UML methodology, which is Component-based Development (CBD), we analyzed the workflow on procurement operation of automobile industry and implemented a prototype of efficient E-Procurement system for automobile industry, by developing XML/EDI and XML signature. Also, on this paper, object-oriented CBD is employed to minimize the risk of life cycle and reuse software as mentioned to limitation of information engineering methodology. It enables the interoperability with ERP (Enterprise Resource Planning) as corporate legacy system. This system proposes a solution to apply analysis and design of workflow, component development, interoperability with corporate information system, and XML signature for integrity and authentication of electronic documents in other system so far.

A Study on the Satisfaction Level of the National Defense Electronic Procurement System Service by Applying the SERVQUAL Model (SERVQUAL 모형을 적용한 국방전자조달 서비스에 대한 만족도 분석)

  • Min, Wonbae;Kang, Seokjoong;Lee, Bumkoo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.2
    • /
    • pp.488-495
    • /
    • 2014
  • The national defense electronic procurement system is an information system supporting DAPA, services (Army, Navy and Air Force), and the procurement companies in the electronic bidding. It has contributed greatly to improving the efficiency of the national defense electronic procurement process by providing various information services based on inter-operation among the related parties. However the national defense electronic procurement system is expected to be upgraded to the next version in accord with rapidly evolving infrastructure based on high technology and increasing various communication channels. This paper investigates the satisfaction level of the system users and proposes directions for the next-generation procurement portal.

Government Procurement in the TPP: Differences with GPA, and Implications for Korea's Future Market Opening Negotiations (TPP 정부조달분야: GPA와의 차이 및 향후 한국의 정부조달 시장개방 협상에 대한 함의)

  • Yang, Jun-Sok
    • Korea Trade Review
    • /
    • v.42 no.4
    • /
    • pp.185-215
    • /
    • 2017
  • While the future of Trans-Pacific Partnership Agreement is uncertain, TPP did succeed in convincing certain developing countries, which had been reluctant to open its government procurement market in the past, to open their markets. In this paper, we compare the government procurement chapter of TPP with WTO Government Procurement Agreement to see what factors may have convinced these countries to open their government procurement markets. The key factors seem to be an initially very high levels of threshold, coupled with an extended transition period (up to 20 years) to lower the threshold to figures comparable to other countries; and reduction of legal and regulatory burdens dealing with some transparency and procedural requirements. Korea should use these strategies in their future FTA negotiations to try to open foreign government procurement markets. If Korea wants to accede to TPP, it should have very few problems since Korea has similar threshold levels as current TPP members, and legal and regulatory requirements are more strict under GPA, of which Korea is a member.

  • PDF

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF

The Impact of Item Characteristics on the Selective e-Procurement Strategies (구매품목의 특성이 전자조달방식의 선택에 미치는 영향)

  • Chun, Hong-Mal;Pyun, Ji-Surk
    • Asia pacific journal of information systems
    • /
    • v.14 no.2
    • /
    • pp.87-114
    • /
    • 2004
  • This paper empirically examined the relationships between the characteristics of purchasing items and the effective e-procurement strategies. We found that the importance of items has influence on the effective e-procurement, while the complexity of purchasing process has little influence. This fact exhibits the automation of transactional process has little influence on carrying out e-procurement. We also found, companies prefer the horizontal e-marketplace to the vertical e-marketplace. In addition, companies want to purchase through the e-bidding or reverse auction for lower prices.

A Study on the Way of Purchasing Cost Reduction through Streamlining Procurement Tasks: Focusing on Rolling Stock and Components (구매 업무 효율화를 통한 구매비용 절감 방안에 관한 연구: 철도차량 및 차량용품을 중심으로)

  • Lee, Sun-Kwan;Shin, Tack-Hyun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.4
    • /
    • pp.557-564
    • /
    • 2009
  • This study compared KORAIL's procurement tasks with that of other companies. after analyzing the institutional and operational problems in procurement tasks especially in the respect of rolling stock and components which are KORAIL's major purchasing items, this study presented the way of purchasing cost Reduction through improving and streamlining procurement tasks.

A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects (해외 화공플랜트 건설사업 위험요인 영향도 분석)

  • Cho, Seung-Yeon;Kim, Young-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction (모듈러 건축공사의 조달 및 양중 효율화를 위한 중점개선 요구사항 도출)

  • Kim, Min Ju;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.211-212
    • /
    • 2015
  • Procurement and lifting scheduling of modules and resources in modular construction, where modules that are manufactured from factory are delivered and assembled on site, is a crucial factor that determines the efficiency of the whole construction. However, previous studies have barely acknowledged the significance of resource procurement process and lifting of modules in modular construction. Therefore, this research aims to derive factors that are in need of improvement for successful implementation of procurement and lifting efficiency, and visualize them according to their importance and performance on improvement through IPA(Important Performance Analysis).

  • PDF