Journal of the Institute of Electronics Engineers of Korea SD
/
v.41
no.10
/
pp.77-83
/
2004
In low-power VLSI systems, it is effective to suppress leakage current by shutting down megablocks in idle states. Recently, multi-threshold voltage CMOS (MTCMOS) is widely accepted to shutdown power supply. However, it requires short wake-up time as operating frequency increases. This causes large current surge during wake-up process, and it often leads to system malfunction due to severe Power line noise. In this paper, a novel wake-up scheme is proposed to solve this problem. It exploits pipelined wake-up strategy in several stages that reduces maximum current on the power line and its corresponding power line noise. To evaluate its efficiency, the proposed scheme was applied to a multiplier block in the Compact Flash memory controller chip. Power line noise in shutdown and wake-up process was simulated and analyzed. From the simulation results, the proposed scheme was proven to greatly reduce the power line noise compared with conventional schemes.
Journal of the Korea Institute of Building Construction
/
v.10
no.1
/
pp.73-79
/
2010
Deck plates have been widely used for steel framework due to their merits in terms of schedule reduction and work repetition. For this reason, most of the previous studies related to deck plates have focused on the development of form type and their constructability. In this study, through an actual case study and interviews with experts, a simulation model was developed using the CYCLONE method. Based on this model, this study not only analyzed the productivity of the work process of the deck plate in steel framework, but also identified the occurrence of idle time in the work process. In addition, using a sensitivity analysis, productivity and duration could be analyzed according to variation of input resources. Based on the results, this paper suggests a way to improve the productivity of deck plate work in steel frameworks. Using the model, it is expected that project managers would be able to predict the productivity and total duration of the deck plate work in the early project phase, which will enable managers to make an appropriate plan for input resources.
Journal of the Institute of Electronics Engineers of Korea SD
/
v.47
no.7
/
pp.52-60
/
2010
In this paper, we propose a dynamic power management framework for multi-core systems. We reduced the power consumption of multi-core processors such as Intel Centrino Duo and ARM11 MPCore, which have been used at the consumer electronics and personal computer market. Each processor uses a different technique to save its power usage, but there is no embedded multi-core processor which has a precise power control mechanism such as dynamic voltage scaling technique. The proposed dynamic power management framework is suitable for smart phones which have an operating system to provide multi-processing capability. Basically, our framework follows an intuitive idea that reducing the power consumption of idle cores is the most effective way to save the overall power consumption of a multi-core processor. We could minimize the energy consumption used by idle cores with application-targeted policies that reflect the characteristics of active workloads. We defined some properties of an application to analyze the performance requirement in real time and automated the management process to verify the result quickly. We tested the proposed framework with popular processors such as Intel Centrino Duo and ARM11 MPCore, and were able to find that our framework dynamically reduced the power consumption of multi-core processors and satisfied the performance requirement of each program.
Korean Journal of Construction Engineering and Management
/
v.11
no.3
/
pp.13-22
/
2010
From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.
This study starts with the idea that the process of creating a Gantt Chart for schedule planning is similar to Tetris game with only a straight line. In Tetris games, the X axis is M machines and the Y axis is time. It is assumed that all types of orders can be worked without separation in all machines, but if the types of orders are different, setup cost will be incurred without delay. In this study, the game described above was named Gantris and the game environment was implemented. The AI-scheduling table through in-depth reinforcement learning compares the real-time scheduling table with the human-made game schedule. In the comparative study, the learning environment was studied in single order list learning environment and random order list learning environment. The two systems to be compared in this study are four machines (Machine)-two types of system (4M2T) and ten machines-six types of system (10M6T). As a performance indicator of the generated schedule, a weighted sum of setup cost, makespan and idle time in processing 100 orders were scheduled. As a result of the comparative study, in 4M2T system, regardless of the learning environment, the learned system generated schedule plan with better performance index than the experimenter. In the case of 10M6T system, the AI system generated a schedule of better performance indicators than the experimenter in a single learning environment, but showed a bad performance index than the experimenter in random learning environment. However, in comparing the number of job changes, the learning system showed better results than those of the 4M2T and 10M6T, showing excellent scheduling performance.
Graphics rendering pipeline (application, geometry, and rasterizer) is the core of real-time graphics which is the most important functionality for computer games. Usually this rendering process is completed by both the CPU and the GPU, and a bottleneck can be located either in the CPU or the GPU. This paper focuses on reducing the bottleneck between the CPU and the GPU. We are proposing a method for improving the performance of parallel processing for real-time graphics rendering by separating the CPU operations (usually performed using a thread) into two parts: pure CPU operations and operations related to the GPU, and let them operate in parallel. This allows for maximizing the parallelism in processing the communication between the CPU and the GPU. Some experiments lead us to confirm that our method proposed in this paper can allow for faster graphics rendering. In addition to our method of using a dedicated thread for GPU related operations, we are also proposing an algorithm for balancing the graphics pipeline using the idle time due to the bottleneck. We have implemented the two methods proposed in this paper in our networked 3D game engine and verified that our methods are effective in real systems.
The Journal of Korean Institute of Communications and Information Sciences
/
v.41
no.11
/
pp.1507-1514
/
2016
Full-image guided filter reflects all pixels of image in filtering by using weight propagation and two-pass model, whereas the existing guide filter is processed based on the kernel window. Therefore the computational complexity can be improved while maintaining characteristics of guide filter, such as edge-preserving, smoothing, and so on. In this paper, we propose an efficient VLSI architecture for the full-image guided filter by analyzing the data dependency, the data frequency and the PSNR analysis of the image in order to achieve enough speed for various applications such as stereo vision, real-time systems, etc. In addition, the proposed efficient scheduling enables the realtime process by minimizing the idle period in weight computation. The proposed VLSI architecture shows 214MHz of maximum operating frequency (image size: 384*288, 965 fps) and 76K of gates (internal memory excluded).
Overlapping windows are generally used for queries to process continuous data streams. Nevertheless, existing approaches discussed join algorithms only for basic types of windows such as tumbling windows and tuple-driven windows. In this paper, we propose an efficient join algorithm for overlapping windows, which are considered as a more general type of windows. The proposed algorithm is based on an incremental window join. It focuses on producing join results continuously when the memory overflow frequently occurs. It consists of (1) a method to use both of the incremental and full joins selectively, (2) a victim selection algorithm to minimize latency of join processing and (3) an idle time professing algorithm. We show through our experiments that the selective use of incremental and full joins provides better performance than using one of them only.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.729-732
/
2008
Complexity and Massive is the modem trend of construction project. The lack of timely and accurate construction data is the main cause for the lack productivity increases seen in other industries. Because information is essential in the construction production process, the lack of it will cause workers to stay idle, build the wrong thing that has to be redone, become involved in an accident or simply waste their time doing non-productive work. To aid construction automation and improve its productivity, RFID technology system should be developed. As a result of that, this study analyzes the status of RFID technologies in construction project and suggest advanced construction method. USN and RTLS system is analyzed in this study RFID system also can be used in construction management, material management, quality control, safety management and human resource management.
Journal of the Korea Institute of Information and Communication Engineering
/
v.18
no.10
/
pp.2389-2396
/
2014
Spectrum handoff is the process of exchanging progressing data transmission from the current channel to another idle channel. The essential goal of spectrum handoff in CR(Cognitive Radio) networks is to perform consistent data transmission while sustaining performance of ongoing transmission of secondary users. This handoff procedure can cause additional latency that eventually affects on the performance of CR transmission. Channel prediction method is expected to avoid the disruption to primary users and to reduce the handoff latency. In this paper, adaptive channel prediction is proposed to cope with time-varying channel and an adaptive channel prediction based proactive handoff procedure is designed to enhance data transmission performance.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.