Browse > Article
http://dx.doi.org/10.5345/JKIC.2010.10.1.073

A Study on the Productivity Analysis of Deck Plate Installation Work in Steel Structure Construction  

Jeong, Se-Lim (서울시립대학교 건축공학과)
Cho, Kyu-Man (서울시립대학교 건축학부)
Hyun, Chang-Taek (서울시립대학교 건축학부)
Publication Information
Journal of the Korea Institute of Building Construction / v.10, no.1, 2010 , pp. 73-79 More about this Journal
Abstract
Deck plates have been widely used for steel framework due to their merits in terms of schedule reduction and work repetition. For this reason, most of the previous studies related to deck plates have focused on the development of form type and their constructability. In this study, through an actual case study and interviews with experts, a simulation model was developed using the CYCLONE method. Based on this model, this study not only analyzed the productivity of the work process of the deck plate in steel framework, but also identified the occurrence of idle time in the work process. In addition, using a sensitivity analysis, productivity and duration could be analyzed according to variation of input resources. Based on the results, this paper suggests a way to improve the productivity of deck plate work in steel frameworks. Using the model, it is expected that project managers would be able to predict the productivity and total duration of the deck plate work in the early project phase, which will enable managers to make an appropriate plan for input resources.
Keywords
construction simulation; productivity; deck plate; steel structure construction;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 김태희외, 데크플레이트 바닥판 공법의 생산성 향상방안 제시, 대한건축학회 논문집(구조계), 제16권 제12호, pp.175-182, 2000.12
2 김태희외, 데크플레이트 바닥판 공법의 시공성 평가, 대한건축학회 춘계학술발표대회 논문집(구조계), 제20권 제1호, pp.505-508, 2000.4
3 윤대중외, 국내데크작업의 생산성 증대에 관한연구, 대한건축학회 춘계학술발표대회 논문집(구조계), 제23권 제1호, pp.415-418, 2003.4
4 임남기외, 슬립폼과 데크플레이트를 채용한 벽식 아파트의 적용성에 관한 기초적 연구, 대한건축학회논문집, 제20권 제6호, pp.107-114, 2004.6
5 (주)코스틸, http://www.kosteel.co.kr
6 Halpin, Daniel W, Riggs, Leland S, Planning and analysis of construction operations, John Wiley & Sons, Inc., pp.99-101, 1992
7 Cho, K., Integrated Schedule and Cost Management Model For Repetitive Construction Process of High-rise Buildings, Ph. D. dissertation, The University of Seoul, pp.118-119, 2009.2
8 Hong, T. and Hastak, M., Simulation on construction process of FRP bridge deck panels, Journal of Automation in construction Elsevier v.16, n.1, pp.620-631, 2006.10