• Title/Summary/Keyword: Process assessment

Search Result 4,101, Processing Time 0.032 seconds

A Study on the Application and Development of the Strategic Environmental Assessment(SEA) Model with Reference to Urban Comprehensive Plan (전략환경평가 모형의 개발과 적용에 관한 연구(I): 도시기본계획 평가를 중심으로)

  • Sung, Hyun-Chan;Kim, Kwi-Gon
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.1
    • /
    • pp.5-31
    • /
    • 1997
  • Strategic Environmental Assessment (SEA) is an assessment process integrated with policy and planning processes considering environmental impacts, not at the level of individual project, but at higher level of policy and plan. Presently, two systems for the SEA are being implemented in Korea. One is "the consultation of environmental investigation into a change in national land utilization", which is to be pre-discussed with the head of the related central administrative organizations, based on the respective individual code. The other is "the consultation of environmental investigation into an administrative plan and project", which is to be pre-discussed with the minister of the environments for the administrative plan. However, these two systems are not integrated procedures with the planning process. In other words, there is a separate post-environmental assessment after planning. Also concrete proposal is not yet prepared for the method and procedure of environmental investigation about details of the planning. Therefore, they do not playa role in taking precautions for environmentally sustainable development. In this study, for the effective environmental investigation at the level of planning, environmental assessment model to be integrated with urban comprehensive plans was developed. The results of this study can be summarized as follows: First, based on the analysis of systematic problems in environmental investigation of this country, the study compared and analysed the SEA method of foreign countries. derived the potential limitations in its applications to this country. Also, the new method in this study, is integrated into planning process by improving the limitations. Thus, we developed the SEA model for this country, which consists of seven steps ; Phase 1; establishing a work program, Phase 2; defining the scop. of the SEA, Phase 3; analyzing an existing environmental situation, Phase 4; examining the consistency with environmental policy, Phase 5; appraising and synthesizing the plan content, Phase 6; proposing recommendations, Phase 7; monitoring and feedback. Second, the two types of application program of the developed assessment model were proposed. One is to integrate this model into planning process, and the other is for the institute and ministry of environments to implement SEA after planning. An aim of this study was developing an environmental assessment model at the planning level which was not yet established in this country and was to apply the model to urban comprehensive plan for inspection. This research will make the effective operation of environmental investigation system possible at the planning level in this country and contribute to the environmental protection at the global level.

  • PDF

A risk assessment of $CO_2$ geological storage for domestic application (이산화탄소 지중저장의 국내적용을 위한 위해성 평가 방안)

  • Lee, Kang-Ryel;Lee, Dae-Soo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.220.1-220.1
    • /
    • 2011
  • In recent years, the importance of Carbon Capture and Storage (hereafter CCS) is growing bigger and bigger. The development and commercialization of CCS technology are concerned for reducing carbon dioxide($CO_2$) emissions. For the most studies, the technology of $CO_2$ storage is known as the geological storage, ocean sequestration, mineral carbonation, industrial utilization, and so on. The geological storage is adjudged the most reasonable technology from economic and environmental aspects. Generally, the $CO_2$ geological storage is comprised of compression - transportation - drilling/injection - storage/management process. The critical problem is a leakage of $CO_2$ in all process. For resolving a leakage problem, it is necessary to predict and build a monitoring system. Those systems are proved safety of a leakage and received positive social perceptions of $CO_2$ geological storage. For those reasons, a risk assessment of $CO_2$ geological storage is required. A risk assessment is an estimated process of the possible effects when spilling $CO_2$. Although numerous studies of risk assessment have studied, it is incomplete to evaluate a risk and disaster quantitatively. The risk assessment will be developed for domestic application and safe $CO_2$ geological storage considering characteristics of Korea.

  • PDF

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

Automated Assessment Of The Air Situation During The Preparation And Conduct Of Combat Operations Using A Decision Support System Based On Fuzzy Networks Of Target Installations

  • Volkov, Andriy;Bazilo, Serhii;Tokar, Oleksandr;Horbachov, Kostiantyn;Lutsyshyn, Andrii;Zaitsev, Ihor;Iasechko, Maksym
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.11
    • /
    • pp.184-188
    • /
    • 2022
  • The article considers the improved method and model of automated air situation assessment using a decision support system based on fuzzy networks of target installations. The advanced method of automated assessment of the air situation using the decision support system is based on the methodology of reflexive control of the first rank. With this approach, the process of assessing the air situation in the framework of the formulated task can be reduced to determining the purpose, probabilistic nature of actions and capabilities of the air target. The use of a homogeneous functional network for the formal presentation of air situation assessment processes will formally describe the process of determining classes of events during air situation assessment and the process of determining quantitative and qualitative characteristics of recognized air situation situations. To formalize the patterns of manifestation of the values of quantitative and symbolic information, it is proposed to use the mathematical apparatus of fuzzy sets.

Effect of Portfolio Assessment in Elementary Science Teaching (초등 과학 학습지도에서 포트폴리오 평가의 효과)

  • 이민수;한안진
    • Journal of Korean Elementary Science Education
    • /
    • v.20 no.1
    • /
    • pp.107-122
    • /
    • 2001
  • The Purpose of this study is to find the effects of the portfolio assessment on elementary students' scientific knowledge, inquiry process skill, scientific attitudes in the teaching of science. And finally the parents' response to the portfolio assessment is also investigated. In order to reach the goal of this study, the investigator developed the evaluation instrument such as an experimental report and a cumulative observation sheet for the 4th-grade Unit-1 'Light Propagation' and Unit-3 'Separating Mixtures', and then these were administered to 42 4th-grade elementary students in Inchon. Based upon the findings and within the limitations of this study, several conclusions can be drawn regarding the problems investigated. First, as the portfolio assessment offers enough information about individual student's performance, it has a highly positive effect on evaluating the students' scientific knowledges. It can also make possible to grasp the several aspects of the student's progress. Second, the portfolio assessment can be implemented without giving students any psychological pressure from testing itself. Therefore, the portfolio assessment is an effective means of appraising inquiry process skills. Third, the portfolio assessment is effective to evaluate the students' attitude toward science by means of individual records which include such aspects that is hardly found by the teacher who teaches science in the class. Fourth, as most parents showed a positive response to this portfolio assessment, it is considered to be effective method of appraising the result of teaching science at elementary school. Accordingly, this study demonstrated that the portfolio assessment is an effective method that can assess students' scientific knowledges, inquiry process skills, and scientific attitudes gained from science teaching-learning. Therefore, it is necessary to implement the portfolio assessment to other grade students as well in the following study where teacher may give more encouragements and suggestions to sti dents for the better learning motives. Also teachers should suggest more definite evaluation criteria to students so that they may improve the students' self and peer evaluation skills.

  • PDF

Environmental Impact Assessment and Environmental Monitoring: Monitoring Factors and Organization (환경영향평가와 측정 : 환경처 업무 중심으로)

  • Kang, In-Goo;Chang, Chun-Ki;Han, Eui-Jung;Kim, Myung-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.3 no.2
    • /
    • pp.69-75
    • /
    • 1994
  • Environmental Impact Assessment is composed of screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measure, and post management. Environmental monitoring data is applied to EIA process such as prediction and post management. It must he collected and managed systematically for effective applying in EIA process. This article explains factors such as air quality, water quality, soil, ocean, odor, noise & vibration, ecosystem, etc. and organizations of environmental monitoring managed by Ministry of Environment.

  • PDF

A Study on the Process Analysis and the Risk Assessment for Removal Work of the Asbestos Cement Slate (석면 슬레이트 해체작업의 공정분석 및 위험성평가에 관한 연구)

  • Oh, Hyunsoo;Kim, Jeong-Min;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.137-143
    • /
    • 2014
  • Asbestos is given to a variety of six naturally occurring silicate minerals. These minerals possess high tensile strength, flexibility, resistance to chemical and thermal degradation, and electrical resistance. These minerals have been used for decades in thousands of commercial products, such as insulation and fireproofing materials, automotive brakes, textile products, cement and wallboard materials. When handled, asbestos can separate into microscopic-size particles that remain in the air and are easily inhaled. It is now known that prolonged inhalation of asbestos fibers can cause serious and fatal illnesses including malignant lung cancer, mesothelioma, and asbestosis. Therefore the use of asbestos and asbestos products has dramatically decreased in recent years. Also all constructions including asbestos should be removed under strictly controlled conditions and very tightly implemented health & safety management systems. In this study, the process of the removal work of the asbestos cement slate was analyzed by IDEF-0 modeling and evaluated by 4M risk assessment method. The results show that removal work of the asbestos cement slate was classified five process and eighteen detail process. The risk of safety side the higher than the risk of health side in 4M risk assessment.

Evidential Analytic Hierarchy Process Dependence Assessment Methodology in Human Reliability Analysis

  • Chen, Luyuan;Zhou, Xinyi;Xiao, Fuyuan;Deng, Yong;Mahadevan, Sankaran
    • Nuclear Engineering and Technology
    • /
    • v.49 no.1
    • /
    • pp.113-123
    • /
    • 2017
  • In human reliability analysis, dependence assessment is an important issue in risky large complex systems, such as operation of a nuclear power plant. Many existing methods depend on an expert's judgment, which contributes to the subjectivity and restrictions of results. Recently, a computational method, based on the Dempster-Shafer evidence theory and analytic hierarchy process, has been proposed to handle the dependence in human reliability analysis. The model can deal with uncertainty in an analyst's judgment and reduce the subjectivity in the evaluation process. However, the computation is heavy and complicated to some degree. The most important issue is that the existing method is in a positive aspect, which may cause an underestimation of the risk. In this study, a new evidential analytic hierarchy process dependence assessment methodology, based on the improvement of existing methods, has been proposed, which is expected to be easier and more effective.

A study on pre-service teachers' development of assessment items and standards in a mathematical essay course (예비교사의 수리논술 평가문항 개발과 평가 기준 설정에 관한 연구)

  • Lee, Dong-Geun;Choi, Sang-Ho;Kim, Dong-Joong
    • Journal of the Korean School Mathematics Society
    • /
    • v.17 no.4
    • /
    • pp.541-563
    • /
    • 2014
  • The purpose of this study is to investigate how the curriculum, in which pre-service teachers experience mathematical process and develop assessment items and standards through the process experience in a mathematical essay course, affects the pre-service teachers and suggest its implications for teacher education. Fourty nine pre-service teachers, registered at a mathematical essay course in a K university in Seoul, developed mathematical essay problems and their assessment standards, and their developed processes were analyzed. According to the analysis results, first, mathematical essay problems developed by the fifty students reflect components of mathematical processes. Especially, one characteristic in revising assessment items shows that pre-service teachers considered not only justification process through different levels of difficulty and mathematical reasoning, but also logical descriptions through problem solving, when they worked on group discussions and examined middle school and high school students' responses. Second, while pre-service teachers developed rubrics for their assessment items and revised the rubrics based on students' responses, they established assessment standards which employed mathematical process by focusing on problem solving process rather than results and considering students' unexpected problem solving. The results imply a concrete method in planning and executing a mathematical essay course which makes use of mathematical process in teacher education.

  • PDF

Base Practice Importance Analysis by Software Process Assessors' Characteristics (소프트웨어 프로세스 심사원 특성에 따른 기본 프랙티스의 중요도 분석)

  • Lee, Jong-Moo;Yoo, Young-Kwan;Kim, Gil-Jo;Chun, In-Geol
    • Korean Business Review
    • /
    • v.13
    • /
    • pp.179-193
    • /
    • 2000
  • It is not simple to manage software quality, because software development process and product itself are very complex. Recently ISO/IEC 15504- international standard for software process improvement, capability determination and development - was completed and applied to many local trials, and their results are being reported as registered local trials. The first step of software process assessment is established by examining whether its base practices are performed and which level they are achieved. And as far as assessment responsibility and credibility are concerned, assessment is generally performed by team-based assessors. Therefore assessment team construction and its preference of practice importances have a great effect on the credibility and the objectivity of assessment. In this paper, we analyse a SPICE-based software process assessment trial by comparing base practice importances of assessed processes, which are expressed through a real assessment, with its final rating results. Survey data are collected from assessors and interviewees who were engaged in the SPICE trial that was performed by ISO/IEC 15504, and final data analysis are derived from the factor analysis method. It is convinced that the result of this paper is able to enhance the credibility of software process assessment by provisions of objective and rational criteria and preference information for assessment team construction and base practice importances in future.

  • PDF