• Title/Summary/Keyword: Process Time

Search Result 25,560, Processing Time 0.044 seconds

Real-time Risk Measurement of Business Process Using Decision Tree (의사결정나무를 이용한 비즈니스 프로세스의 실시간 위험 수준 측정)

  • Kang, Bok-Young;Cho, Nam-Wook;Kim, Hoon-Tae;Kang, Suk-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.4
    • /
    • pp.49-58
    • /
    • 2008
  • This paper proposes a methodology to measure the risk level in real-time for Business Activity Monitoring (BAM). A decision-tree methodology was employed to analyze the effect of process attributes on the result of the process execution. In the course of process execution, the level of risk is monitored in real-time, and an early warning can be issued depending on the change of the risk level. An algorithm for estimating the risk of ongoing processes in real-time was formulated. Comparison experiments were conducted to demonstrate the effectiveness of our method. The proposed method detects the risks of business processes more precisely and even earlier than existing approaches.

Neural Network-based Time Series Modeling of Optical Emission Spectroscopy Data for Fault Prediction in Reactive Ion Etching

  • Sang Jeen Hong
    • Journal of the Semiconductor & Display Technology
    • /
    • v.22 no.4
    • /
    • pp.131-135
    • /
    • 2023
  • Neural network-based time series models called time series neural networks (TSNNs) are trained by the error backpropagation algorithm and used to predict process shifts of parameters such as gas flow, RF power, and chamber pressure in reactive ion etching (RIE). The training data consists of process conditions, as well as principal components (PCs) of optical emission spectroscopy (OES) data collected in-situ. Data are generated during the etching of benzocyclobutene (BCB) in a SF6/O2 plasma. Combinations of baseline and faulty responses for each process parameter are simulated, and a moving average of TSNN predictions successfully identifies process shifts in the recipe parameters for various degrees of faults.

  • PDF

UNIFORM ASYMPTOTICS FOR THE FINITE-TIME RUIN PROBABILITY IN A GENERAL RISK MODEL WITH PAIRWISE QUASI-ASYMPTOTICALLY INDEPENDENT CLAIMS AND CONSTANT INTEREST FORCE

  • Gao, Qingwu;Yang, Yang
    • Bulletin of the Korean Mathematical Society
    • /
    • v.50 no.2
    • /
    • pp.611-626
    • /
    • 2013
  • In the paper we study the finite-time ruin probability in a general risk model with constant interest force, in which the claim sizes are pairwise quasi-asymptotically independent and arrive according to an arbitrary counting process, and the premium process is a general stochastic process. For the case that the claim-size distribution belongs to the consistent variation class, we obtain an asymptotic formula for the finite-time ruin probability, which holds uniformly for all time horizons varying in a relevant infinite interval. The obtained result also includes an asymptotic formula for the infinite-time ruin probability.

Assessment and Optimization of Granular Activated Carbon (GAC) Process in Water Treatment Process (입상활성탄 공정의 진단 및 효율적 운영방안: D 정수장을 중심으로)

  • Kim, Seong Su;Lee, Kyung Hyuk
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.6
    • /
    • pp.781-790
    • /
    • 2005
  • Granular Activated Carbon(GAC) is widely used in drinking water treatment. Many of the problems occurring in the GAC process are associated with the operation goal and performance. The purpose of this study were to evaluate the design, operation, and performance of granular activated carbon process in D water treatment plant. The optimal operation conditions of GAC process such as backwashing condition, granular activated carbon replacement time were discussed. The design, operation and performance of GAC process is influenced by their raw water characteristics and placement within the treatment process sequence. A critical analysis of plants experience and the information from the literature identifies the effectiveness of GAC process and indicates where modifications in design and operation could lead to improved performance. It would be useful to evaluate and optimize the GAC process in other treatment plant.

Real-time In-situ Plasma Etch Process Monitoring for Sensor Based-Advanced Process Control

  • Ahn, Jong-Hwan;Gu, Ja-Myong;Han, Seung-Soo;Hong, Sang-Jeen
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.11 no.1
    • /
    • pp.1-5
    • /
    • 2011
  • To enter next process control, numerous approaches, including run-to-run (R2R) process control and fault detection and classification (FDC) have been suggested in semiconductor manufacturing industry as a facilitation of advanced process control. This paper introduces a novel type of optical plasma process monitoring system, called plasma eyes chromatic system (PECSTM) and presents its potential for the purpose of fault detection. Qualitatively comparison of optically acquired signal levels vs. process parameter modifications are successfully demonstrated, and we expect that PECSTM signal can be a useful indication of onset of process change in real-time for advanced process control (APC).

A Simulation Study for Evaluation of Alternative Plans and Making the Upper-limit for Improvement in Productivity of Flow-shop with Considering a Work-wait Time (흐름생산 공정에서의 작업 대기시간을 고려한 공정 개선 상한선 도출 : H사의 공정 개선 계획안 시뮬레이션 사례를 중심으로)

  • Song, Young-Joo;Woo, Jong-Hun;Lee, Don-Kun;Shin, Jong-Gye
    • Journal of the Korea Society for Simulation
    • /
    • v.17 no.2
    • /
    • pp.63-74
    • /
    • 2008
  • The design of best efficient production process is common requirements of the production strategy department and the process planning department to maximize the revenue and accomplish target production volumes in the production periods. And they use several general methods for that-line-balancing, removing of the bottle-neck process, facility ramp-up, increasing of the worker's utilization, etc. But, those methods have depended on analytic, static and arithmetic calculations, yet. So, irregular work-waiting time causing the delay time isn't include in extracting production capacity, especially in the line production process. The work-waiting time is changed irregularly along the variation of each machine and very important for calculate real product lead-time and forecasting target production volumes. At this thesis, i'm going to mention the importance of the delay time of conveyor system which can be extracted by discrete-event simulation. And suggest it as a new main variable that must be considered at designing new production system. Then experimented and tested that's effects in the H-company case, conveyor based line production process.

  • PDF

Optimization for Friction Welding of AZ31 Mg Alloy by Design of Experiments (실험계획법에 의한 AZ31마그네슘합금의 마찰접합시 최적공정설계)

  • Kang, Dae-Min;Kwak, Jae-Seob;Choi, Jong-Whan;Park, Kyeong-Do
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.10 no.4
    • /
    • pp.64-69
    • /
    • 2011
  • Magnesium alloy has been known as lightweight material in automobile and electronic industry with aluminum alloy, titanium alloy and plastic material. Friction welding is useful to join different kinds of metals and nonferrous metals they are difficult to be joined by such as gas welding, resistance welding and electronic beam welding. In this study, friction welding was performed to investigate optimization process of Mg alloy with a 20mm diameter solid bar. For that, the orthogonal array $(L_{9}(3^{4}))$ was used that contained four factors and each factor had three levels. Control factors were heating pressure, heating time, upsetting pressure and upsetting time. Also tensile tests were carried out to measure mechanical properties for welded conditions. The levels of heating pressure and upsetting pressure used were 15, 25, 35MPa, and 30, 50, 70MPa, respectively. In addition those of heating time and upsetting time were 0.5, 1, 1.5 sec and 3, 4, 5 sec., respectively, rotating speed of 2000rpm. From the experimental results, optimization condition was estimated as follows; heating pressure=35MPa, upsetting pressure=70MPa, heating time=1.5sec, upsetting time=3sec.

Research on the formulation of Base Bleed Unit for the reduction of process lead time (항력감소제 공정 Lead time 단축을 위한 조성개발 연구)

  • Son Hyun-Il;Chae Kyung-Min;Suh Hyuk;Choi Young-Ki
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.479-483
    • /
    • 2005
  • BBU is the weapon system for the extension of range through the reduction of base drag in 155mm. It has been mass-produced since 2000. The purpose of this research is productivity increase through the reduction of process lead time. Development process is as follows. First, formulation tests about propellent and liner, Second, spin test and final firing test about end products.

  • PDF

Development of Automobile Windows Motor Cover by Thermoplastic Elastomer(TPE) (TPE를 적용한 자동차 윈도우 모터커버의 개발)

  • Cho, Young-Tae;Ko, Boum-Yong;Lee, Choong-Ho
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.19 no.6
    • /
    • pp.847-851
    • /
    • 2010
  • It was attempted to develop an auto part by over molding injection mold that produces precision products in high productivity with use of an eco-friendly TPE substitute material for NBR. NBR is currently used in motor gear cover, one of the key parts in motor module for auto doors. Gear cover is composed of plastics and rubber mostly today, which requires a two (2) step process for production using two presses of different types. A hot press is used at this time for forming the rubber, which has drawback of requiring a rather long forming time of 400 seconds for one forming process. Even though this difficulty is overcome by reducing production time through employment of multi-cavity molds, time for forming process must be shortened for improvement of the productivity eventually, and the existing method of insert injection for products that have been formed with plastic material must be outgrown. In this point of view, over molding injection using TPE has a big advantage. Forming time is shortened to 54 seconds, and working the two (2) processes in series by one (1) press could solve the durability problem caused by deflection of the plastics, not to mention shortening the process time. Enhancement of productivity by almost 80% and improvement in the accuracy of the product could thus be achieved.

Heat Transfer Characteristics of the Spherical Capsule Storage System Using Paraffins

  • Cho, Keum-Nam;Choi, S. H.
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • v.6
    • /
    • pp.113-123
    • /
    • 1998
  • The present study is to investigate the effect of experimental parameters on the heat transfer characteristics of a spherical capsule storage system using paraffins. N-Tetradecane and mixture of n-Tetradecane 40% and n-Hexadecane 60% were used as paraffins. Water with inorganic material was also tested for the comparison. The experimental parameters were varied for the Reynolds number from 8 to 16 and for the inlet temperature from -7 to 2$^{\circ}C$. Measured local temperatures of spherical capsules in the storage tank were utilized to calculate charging and discharging times, dimensionless thermal storage amount, and the average heat transfer coefficients in the tank. Local charging and discharging times in the storage tank were significantly different. The effect of inlet temperature on charging time was larger than that on discharging time, but the effect of Reynolds number on charging time was smaller than that on discharging time. Charging time of paraffins was faster by 11~72% than that of water with inorganic material, but little difference of discharging time was found among them. The effect of Reynolds number on the dimensionless thermal storage was less during charging process and more during discharging process than the effect of inlet temperature. The effect of the inlet temperature and the Reynolds number on the average heat transfer coefficient of the storage tank was stronger during discharging process than during charging process. The average heat transfer coefficients of the spherical capsule system using paraffins were larger by 40% than those using water.

  • PDF