• 제목/요약/키워드: Procedure Management

Search Result 3,055, Processing Time 0.028 seconds

Development Of EPC Project Management Procedure Manual System For Plant Project Management (플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발)

  • Park, Bum-Jin;Lee, Min-Jae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.487-491
    • /
    • 2006
  • As Korea has been industrialized high recently, the constructional plant part which is the major driving force to Korean economic growth is being developed. In spite of the great importance, there are many ill-prepared parts in EPC project management procedure, and working in practice of EPC project management procedure manual is not systematic. That is why the governmental progressive policy on the relevant technology and the establishment of EPC project management procedure are needed. This study was aimed to derive reform measures by analyzing problems of EPC project management procedure manuals which are in use at 13 large-sized construction companies currently. The reform measures which are based on the theory of PMI(Project Management Institute)'s PMBOK(Porjcet Management Body Of Knowledge) are about deriving administration factors to control the project, and EPC project administration factors are derived from the definition of CMAA(Construction Mangement Association of America). The reformed electronic EPC project management procedure manual system is set up by standardizing derived administration factors.

  • PDF

An Elimination Type Two-Stage Selection Procedure for Gamma Populations

  • Lee, Seung-Ho;Choi, Kook Lyeol
    • Journal of Korean Society for Quality Management
    • /
    • v.13 no.2
    • /
    • pp.29-36
    • /
    • 1985
  • The problem of selecting the gamma population with the largest mean out of k gamma populations, each of which has the same shape parameter is considered. An elimination type two-stage procedure is proposed which guarantees the same probability requirement using the indifference-zone approach as does the single-stage procedure of Gibbons, Olkin and Sobel (1977). The two-stage procedure has the highly desirable property that the expected total number of observations required by the procedure is always less than that of the corresponding single-stage procedure regardless of the configuration of the population parameters.

  • PDF

Development of EPC Business Process Management Model for Improving Plant Project Management (플랜트프로젝트 사업관리 업무절차 개선을 위한 EPC 수행단계별 BPM모델 개발)

  • Park, Bum-Jin;Lee, Min-Jae;Lee, Tai-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.149-158
    • /
    • 2008
  • Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.

A Personaliz Customer Retention Procedure For Internet Game Site Based on the Self-Organizing Map and Association Rule Mining.

  • Song Hee Seok;Kim Jae Kyeong;Kim Soung Hie;Chae Kyung Hee
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.306-311
    • /
    • 2002
  • This paper propose a personalized defection detection and prevention procedure based on the observation that potential defectors have tendency to take a couple of months or weeks. For this purpose, possible states of customer behavior are determined from past behavior data using SOM (Self-Organizing Map). For the evaluation of the proposed procedure, a case study has been conducted for a Korean online game site. The result demonstestes that the proposed procedure can assist defection prevention effectively and detect potential defectors without deterioration of prediction accuracy comparison to prediction by MLP. Our procedure can be applied to various service industries that can capture fluent customer behavior data such as telecommunications, internet access services, and content services, too.

  • PDF

A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.

On the Construction of Initial Basis in the Simplex Method (단체법에서 효과적인 초기기저의 설정)

  • 임성묵;김기태;박순달
    • Korean Management Science Review
    • /
    • v.17 no.2
    • /
    • pp.13-20
    • /
    • 2000
  • In this research, we compare and analyze the two initial basis construction procedures: LPAKO’s procedure proposed by Seo et. al. and symbolic crash procedure proposed by Maros et. al.. Based on the analysis, we present a new procedure which complements the previous procedures. The new procedure shows superiority to the previous procedures with respects to the optimality of initial basis. Also, the linear basis Also. the initial basis constructed by the new procedure reduces the number of simplex iterations.

  • PDF

Heuristic Procedure on General n/m Job-Shop Scheduling Generation

  • Won, Chin Hee;Kim, Man Shik
    • Journal of Korean Society for Quality Management
    • /
    • v.16 no.1
    • /
    • pp.32-42
    • /
    • 1988
  • The general n/m job-shop problem is easy to state what is required, but it is extremely difficult to make any progress whatever toward a solution. This paper was first to examine a heuristic procedure of general n/m scheduling generation focused on the procedure of MWRK (Most Work Remaining) presented by Giffler and Thompson (1960) among others. Then modified procedure was proposed to obtain better solution in light of the key measure of performance compared with that of the literature presented by Baker (1974). The modified procedure then has been extended to other example problem to test the better results and to assure the properness of application.

  • PDF

A Defection Prevention Procedure using SOM for On-line Game Providers (SOM을 이용한 온라인 게임 제공업체의 고객이탈방지 방법론)

  • Kim Jae-kyeong;Chae Kyung-hee;Song Hee-seok
    • Korean Management Science Review
    • /
    • v.21 no.3
    • /
    • pp.85-99
    • /
    • 2004
  • The retention of customer is an increasingly pressing issue in today's competitive environment. The proposes of this paper is a personalized defection detection and the procedure of prevention based on economic analysis of customer defection possibility, and behaviour state transition cost. This procedure is based on the observation that potential defectors have a tendency to take a couple of months or weeks to gradually change their behaviour before their eventual withdrawal. In this procedure, the SOM(Self-Organizing Map) is used to determine the possible states of customer behaviour from past behaviour data, and to prevent the defection of potential defectors, the proposed procedure recommends the desirable behaviour state for the next period based on the analysis of transition cost. and likelihood of defection. The case study has been conducted for a Korean on-line game provider to evaluate of this procedure.

An interactive weight vector space reduction procedure for bicriterion linear programming

  • Lee, Dongyeup
    • Korean Management Science Review
    • /
    • v.13 no.2
    • /
    • pp.205-213
    • /
    • 1996
  • This paper develops a simple interactive procedure which can be efficiently used to solve a bicriteria linear programming problem. The procedure exploits the relatively simple structure of the bicriterion linear programming problem. Its application to a transportation problem is also presented. The results demonstrate that the method developed in this paper could be easily applicable to any bicriteria linear program in general.

  • PDF

A dynamic procedure for defection detection and prevention based on SOM and a Markov chain

  • Kim, Young-ae;Song, Hee-seok;Kim, Soung-hie
    • Proceedings of the KAIS Fall Conference
    • /
    • 2003.11a
    • /
    • pp.141-148
    • /
    • 2003
  • Customer retention is a common concern for many industries and a critical issue for the survival in today's greatly compressed marketplace. Current customer retention models only focus on detection of potential defectors based on the likelihood of defection by using demographic and customer profile information. In this paper, we propose a dynamic procedure for defection detection and prevention using past and current customer behavior by utilizing SOM and Markov chain. The basic idea originates from the observation that a customer has a tendency to change his behavior (i.e. trim-out his usage volumes) before his eventual withdrawal. This gradual pulling out process offers the company the opportunity to detect the defection signals. With this approach, we have two significant benefits compared with existing defection detection studies. First, our procedure can predict when the potential defectors could withdraw and this feature helps to give marketing managers ample lead-time for preparing defection prevention plans. The second benefit is that our approach can provide a procedure for not only defection detection but also defection prevention, which could suggest the desirable behavior state for the next period so as to lower the likelihood of defection. We applied our dynamic procedure for defection detection and prevention to the online gaming industry. Our suggested procedure could predict potential defectors without deterioration of prediction accuracy compared to that of the MLP neural network and DT.

  • PDF